EN
The article concerns the planned modernization of the power supply system for special transport equipment in the Regis shaft in the scope of building the electricity processing and storage system. In order to improve the safety of people in the underground excavations, the mine plans to install a system enabling emergency power supply for the lifts in the event of a power outage. At the same time, the mine started works related to the development of a photovoltaic power plant, which in the future will make it possible to store energy in periods when the costs of electricity from the power supply network are high and to draw energy stored in this way when electricity costs are low. Energy storage is a key factor in integrating renewable energy into the power generation system and optimizing electricity consumption.
PL
Artykuł przedstawia planowaną modernizację urządzeń transportu specjalnego w szybie Regis w zakresie zabudowy systemu przetwarzania i magazynowania energii elektrycznej.
PL
Artykuł omawia modernizację stacji wentylatorów głównych szybu Wilson w KS „Wieliczka” S.A., która objęła: budynek stacji, wentylatory główne, silniki elektryczne o mocy 110 kW do napędu wentylatorów, transformatory 3/0,4 kV, rozdzielnię 3 kV „Wilson”, rozdzielnię główną 0,4 kV oraz systemy komunikacyjne do sterowania stacją.
EN
The article concerns the modernization of the main ventilators station of the „Wilson" shaft at „Wieliczka" Salt Mine. The modernization included: the station building, main ventilators, 110 kW electric motors for the operation of ventilators, 3/0.4 kV transformers, 3 kV „Wilson" switching station, 0.4 kV main switching station and communication systems to control the station. The modernization of the Wilson shaft ventilators station has provided a modern facility that improves the safety of tourist and sanatorium traffic as well as employees staying in the underground workings of the mine. Thanks to the development of modern devices, the mine meets the requirements of restrictive environmental standards in terms of the permissible noise level. As regards the modernization of the main ventilators stations, devices with Iower electricity consumption were used -which translates into limitations in the amount of electricity bills. Another aspect that reduces costs is the use of automated devices, which in the long run will completely eliminate the station of the device service.
EN
This article discusses the modernization of the “Wilson” shaft’s main fan station in KS “Wieliczka” S.A., which included: the station building, main fans, the 110 kW electric motors to drive the fans, 3/0.4 kV transformers, 3 kV “Wilson” switchgear, 0.4 kV main switchgear and the communication systems used to control the station.
PL
Artykuł omawia modernizację stacji wentylatorów głównych szybu „Wilson” w KS „Wieliczka” S.A., która objęła: budynek stacji, wentylatory główne, silniki elektryczne o mocy 110 kW do napędu wentylatorów, transformatory 3/0,4 kV, rozdzielnię 3 kV „Wilson”, rozdzielnię główną 0,4 kV oraz systemy komunikacyjne do sterowania stacją.
PL
Artykuł omawia modernizację stacji wentylatorów głównych szybu „Wilson” w KS „Wieliczka” S.A., która objęła: budynek stacji, wentylatory główne, silniki elektryczne o mocy 110 kW do napędu wentylatorów, transformatory 3/0,4 kV, rozdzielnię 3 kV „Wilson”, rozdzielnię główną 0,4 kV oraz systemy komunikacyjne do sterowania stacją.
EN
This article discusses the modernization of the “Wilson” shaft’s main fan station in KS “Wieliczka” S.A., which included: the station building, main fans, the 110 kW electric motors to drive the fans, 3/0.4 kV transformers, 3 kV “Wilson” switchgear, 0.4 kV main switchgear and the communication systems used to control the station.
EN
Stability control of the roof is the key to safe and efficient mining of the longwall working face for a steeply dipping coal seam. In this study, a comprehensive analysis was performed on the roof destruction, migration, and filling characteristics of a steeply dipping longwall working face in an actual coalmine. Elastic foundation theory was used to construct a roof mechanics model; the effect of the coal seam inclination angle on the asymmetric deformation and failure of the roof under the constraint of an unbalanced gangue filling was considered. According to the model, increasing the coal seam angle, thickness of the immediate roof, and length of the working face as well as decreasing the thickness of the coal seam can increase the length of the contact area formed by the caving gangue in the lower area of the slope. Changes to the length of the contact area affect the forces and boundary conditions of the main roof. Increasing the coal seam angle reduces the deformation of the main roof, and the position of peak deflection migrates from the middle of the working face to the upper middle. Meanwhile, the position of the peak rotation angle migrates from the lower area of the working face to the upper area. The peak bending moment decreases continuously, and its position migrates from the headgate T-junction to the tailgate T-junction and then the middle of the working face. Field test results verified the rationality of the mechanics model. These findings reveal the effect of the inclination coal seam angle on roof deformation and failure and provide theoretical guidance for engineering practice.
PL
W artykule przedstawiono wybrane techniki i urządzenia pomiarowe wspomagające prace geodezyjne prowadzone na podstawowych obiektach zakładów górniczych. Zaproponowane rozwiązania zostały opracowane w Głównym Instytucie Górnictwa i są obecnie stosowane w górnictwie. Przedstawiono także specjalistyczne urządzenia pomiarowe, w tym laserowe czujniki, wskaźniki i sondy stosowane w nowoczesnych pomiarach i kontroli urządzeń wyciągowych szybów górniczych i innych obiektów zakładów górniczych.
EN
In this paper, chosen techniques and measuring devices were presented supporting geodetic works for essential mine objects. Proposed solutions were developed in Central Mining Institute and are presently applied in mining. Specialist measuring devices were also presented including laser sensors, indicators and probes used in modern measurements and control of hoisting devices of mine shafts and other mine objects.
PL
W artykule dokonano przeglądu stosowanych w Zakładzie Technologii Eksploatacji i Obudów Górniczych Głównego Instytutu Górnictwa sposobów określania wytrzymałości obudowy szybowej, na podstawie badań nieniszczących (metoda sklerometryczna, ultradźwiękowa), półniszczących (metoda "pull-off) oraz niszczących (badanie próbek pobranych bezpośrednio z obudowy szybowej). Bardziej szczegółowo opisano metodę sprzężoną, pozwalającą na dokładniejsze określenie wytrzymałości na ściskanie betonu oraz cegły z użyciem metod nieniszczących (sklerometrycznej, ultradźwiękowej). Wyniki badań wykorzystano do opracowania nowego wzoru na obliczanie wytrzymałości na ściskanie z uwzględnieniem liczby odbić młotka Schmidta oraz prędkości fal ultradźwiękowych. Przedstawiono także metodykę prowadzenia pomiarów wraz z przykładowymi wynikami badań (Bock i in. 2005).
EN
In this paper, a review was done of methods of strength tests of mine shaft support used in the Department of Extraction Technologies and Mining Support of Central Mining Institute on a basis of non-destructive testing (sclerometric method, ultrasonic method), semi-destructive ("pull-off method) and destructive (tests of samples taken directly from a shaft support). An associated method was described more specifically, enabling determining a compression strength of concrete and bricks with higher precision by the non-destructive methods (sclerometric, ultrasonic). The tests results were used for developing a new formula for calculation of compressive strength taking into account a number of Schmidt hammer rebounds and a velocity of ultrasonic waves. The methodology of tests conducting, together with examples of tests results were presented (Bock et al. 2005).
8
Content available remote Wpływ sposobu likwidacji szybu na zagrożenie powierzchni w jego otoczeniu
PL
Drugiego stycznia 2000 r. około godziny 9 na osiedlu mieszkaniowym w Bochum (Niemcy) powstało zapadlisko, którego krater szybko się powiększał, osiągając ostateczną szerokość dochodząca do 15 m i głębokość około 20 m. Kolejne zapadlisko podobnych rozmiarów powstało następnej nocy około godziny 3, kilka metrów dalej na wschód, pochłaniając garaż, wysokie drzewa i krzewy ozdobne. W wyniku szybko przeprowadzonych badań i konsultacji ustalono, że zapadliska powstały obok zlikwidowanego szybu IV, zamkniętej w 1906 r. kopalni węgla kamiennego "Vereinigte Maria Anna und Steinbank". Zapadliska zastabilizowano wypełniając je mieszaninami betonopodobnymi. Równolegle do prac zabezpieczających rozpoczęto badania mające na celu wyjaśnienie przyczyn powstania zapadlisk. W badaniach uwzględniono wszystkie naturalne geologiczne i antropogeniczne czynniki, mogące mieć wpływ na stateczność górotworu w otoczeniu zlikwidowanych szybów. Artykuł prezentuje wyniki tych badań.
EN
After finishing mine operations, all galleries and shafts lining cannot be continually controlled by the mining teams. In such cases the problem of mine's long-term stability in condition of the dynamic geological and others processes is very difficult for description. From the land owner point of view surface destruction hazard is very important. The results of some underground process can be observed at the surface even dozens or hundreds of the years. Very interesting results of the observations and protection works around closed down in 1906 year mining shaft "Wattensheid" in Bochum (Germany) has been shown in the paper. In some day of the year 2000 two very large craters were created at the surface near the forgotten shaft even in the years of 1980 some protection injections has been done. Example presented in the paper should be a warning for all designers of shaft liquidation and post-mining land owners.
EN
The advance of technical state criteria for elements of mining hoists a basic strength-fatigue analysis where the real values of loads and the real time function of the load variability could be used. That problem concerns also the supension gear of skip and balance ropes, where fatigue durability shoild be considered as time function related to the hoist facility type. Such objective can not be achieved without comprehensive study of the dynamics of processes both in the regular operation of the facility and in its emengency states. In this work the author presents some considerations, that are howeyer. Limited to the analysis of dynamic phenomena observed in the condition of the emergency braking of the hoist facility. The results were verified by load measurements taken for some elements the analysed real object system.
EN
The paper presents the results of research on the use of highly thickened slurries for closure of abandoned shafts. Two fill slurry compositions were considered, i.e. mixtures of slag, fly ash, cement and water, one of them containing 15 and the other 30% of cement by mass. In the case of closure of a partially flooded shaft, the fill material or mixture of materials should possess the ability to solidify in a water environment, and after solidification must be proof against soaking and secondary liquefaction. The solidified fill material should also remain stable under the loads resulting from subsequent batches of fill material placed in the shaft. The laboratory test results and analyses showed that strength and strain parameters of the fill material depend not only on the composition of the mixture, but also on the way of transport (transport in stagnant water) and the curing environment - water or dry air environment. Numerical calculations of stress and strain state in the shaft plug performing the function of a revetment plug, conducted for increasing strengths of the fill material and increasing loads exerted on the plug by the thickening column of fill material poured in the shaft, allowed to determine the strength requirements and the technology of solidifying backfill utilized for shaft closures.
PL
W artykule przedstawiono wyniki badań nad zastosowaniem mieszanin wysokozagęszczonych do likwidacji nieczynnego szybu. Rozpatrywano dwa rodzaje składów masowych mieszaniny podsadzkowej, a mianowicie mieszaninę żużlowo-popiołowo-wodną, w której zawartość cementu wynosiła 30%, oraz mieszaninę o zawartości cementu równej 15%. W przypadku likwidacji nieczynnego szybu częściowo wypełnionego wodą materiał zasypowy lub mieszanina materiałów powinny wykazywać zdolność do zestalania w ośrodku wodnym, a po zestaleniu posiadać odporność na rozmakanie lub wtórne upłynnienie. Zestalony materiał zasypowy powinien ponadto być stateczny również w warunkach obciążeń kolejnymi porcjami materiału zasypowego wprowadzanego do likwidowanego szybu. Z przeprowadzonych badań laboratoryjnych wynika, że parametry wytrzymałościowe i odkształceniowe zależą nie tylko od składu mieszaniny, ale również od sposobu transportu (transport w wodzie stojącej) oraz środowiska sezonowania - środowisko wodne lub powietrzno-suche. Wykonane obliczenia numeryczne stateczności szybowego korka oporowego, przeprowadzone dla narastającej wytrzymałości materiału podsadzki i zwiększających się obciążeń korka od narastającej kolumny podsadzkowej w szybie, pozwalają określać wymagania wytrzymałościowe i technologię wykonania podsadzki zestalającej w likwidowanym szybie.
11
Content available remote Likwidacja wzmożonego dopływu wody do szybu R-XI w Zakładach Górniczych Rudna
PL
Szyb R-XI dla Zakładów Górniczych jest dwudziestym dziewiątym obiektem tego typu realizowanym na terenie Zagłębia Miedziowego przez Przedsiębiorstwo Budowy Kopalń PeBeKa S.A. w Lubinie. 20.03.2002 r. na zmianie III, po zabudowie ostatnich dwóch żelbetowych pierścieni panelowych i wybraniu urobku dla wykonania wyłomu stopy szybowej na poziomie 632 m, zauważono na dnie szybu niewielki wyciek na kontakcie spąg-ocios, który oceniono na około 3-5 l/min. Woda była czysta, bardzo zimna i lekko słona. Nie byłoby w tym nic dziwnego, gdyby nie fakt, że szyb głębiony dla potrzeb KGHM Polska Miedź S.A. wykonywany był przy pomocy specjalnej technologii zamrażania górotworu, która uniemożliwiała dopływy wody do szybu z warstw wodonośnych do głębokości 635 m. W artykule przedstawiono działania podjęte przez Inwestora i Wykonawcę dla ratowania szybu.
EN
The R-XI shaft for the Mining Company is the 29th structure of this type, realized in the area of the Copper Basin by the PeBeKa S.A. (Mines Construction Company), located in Lubin. On March 20, 2002, during shift III, following installing the last two reinforced concrete panel rings and extracting the diggings in order to make the breakout of the kerb on the level of 632 m, the small leak was seen at the bottom of the shaft, on the contact between the floor and shaft cheek, whose rate was evaluated anywhere between 3 and 5 l per minute. There would be nothing strange in these findings but for the fact that the shaft had been sunk for the purposes of KGHM Polska Miedź SA by means of the special, dedicated technology for rock mass freezing, which prevented the water from accessing the shaft from water bearing beds down to the depth of 635 m. The article presents the actions and corrective measures undertaken by the Investor and Contractor in order to rescue the shaft.
12
Content available remote Likwidacja szybu kopalnianego o dużym dopływie wody
PL
W artykule przedstawiono sposób technicznej likwidacji szybu o dużym dopływie wody w ilości 2,0 m3/min, pochodzącej z drenażu warstw nadkładu, a gromadzonej we wnęce szybowej na głębokości 170,0 metrów. Projekt polega na przejęciu całego dopływu wody odwiertem przez szyb sąsiedni, po czym rurę szybową wypełnia się wodną mieszaniną popiołów lotnych z elektrowni z dodatkiem stabilizującego geosetu. Kontrola skuteczności procesu wypełniania likwidowanego szybu materiałem o gęstej konsystencji realizowana jest cyklicznie opuszczanym urządzeniem audiowizualnym.
EN
The paper presents the method of technical liquidation of the shaft "Barbara II" with high water inflow, amounting to 2.0 m3/min, originating from overburden layer drainage, collected in the shaft cavity on the level of 170.0 meters. An original solution has been given, consisting in taking over the entire water inflow by a borehole through the neighbouring shaft and directing it to an underground fire reservoir; the reclaimed in this manner shaft structure is filled by means of a water mixture of fly ashes from power plants with a stabilizing geoset additive. The control of the efficiency of the process of liquidated shaft filling by use of material with dense consistence is realized serially by means of a lowered audiovisual device.
13
PL
Szyby górnicze, a w szczególności ich obudowa, uzbrojenie i wyposażenie, podlegają przemieszczeniom i deformacjom związanym z ruchami górotworu wywołanymi działalnością górniczą. W pracy przedstawiono propozycję komputerowego systemu rejestracji wyników pomiarów przemieszczeń i deformacji prowadzonych w szybie. Przedstawiono stan prac nad systemem oraz opisano doświadczenia z pierwszego etapu jego wdrożenia.
EN
Mine shafts, especially their casing and equipment are influenced by rock mass deformation caused by underground exploitation. In paper are presented project of computer storage system for recording results from deformation measurements collected in shaft. First working stage of project was implemented in mine and experiences from that stage was described.