PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Causes of delays in construction works resulting from the provisions of the contract in Poland and Slovakia

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Any construction project, even one that is excellently planned and organized, is prone to the risk of unforeseen events and problems, which in effect can cause late completion of works. The paper presents the results of the research conducted among Polish and Slovakian building contractors. One attempt was to identify and assess the potential causes of delays in the construction works resulting from the provisions of the contract. The knowledge of these factors can help contractors to take protective measures, reducing the risk of delays during the implementation of construction works.
Rocznik
Strony
71--81
Opis fizyczny
Bibliogr. 21 poz., rys., tab., wykr.
Twórcy
autor
  • Politechnika Krakowska, Wydział Inżynierii Lądowej, 31-155 Kraków, ul. Warszawska 24, Poland
autor
  • PhD student of Cracow University of Technology
  • Faculty of Civil Engineering, Technical University of Kosice Causes of delays in construction works resul
autor
  • Faculty of Civil Engineering, Technical University of Kosice Causes of delays in construction works resul
Bibliografia
  • Al-Kharashi, A. & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), 3-23.
  • Anysz, H. & Zbiciak, A. (2013). Przyczyny powstawania opóźnień w realizacji kontraktów budowlanych – analiza wstępnych wyników badania ankietowego. Autobusy: Technika, Eksploatacja, Systemy Transportowe, 3, 963-972.
  • Baldwin, J.R. & Manthei, J.M. (1971). Causes of delays in the construction industry. ASCE Journal of the Construction Division, 97(2), 177-187.
  • Czarnigowska, A. & Sobotka, A. (2013). Time–cost relationship for predicting construction duration. Archives of Civil and Mechanical Engineering, 13(4), 518-526.
  • Dytczak, M., Ginda, G. & Wojtkiewicz, T. (2011). Identyfikacja roli czynników opóźnień realizacji złożonych przedsięwzięć budowlanych. Budownictwo i Inżynieria Środowiska, 2, 481-485.
  • Faridi, A.S. & El-Sayegh, S.M. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), 1167-1176.
  • Głuszak, M. & Leśniak, A. (2015). Construction delays in clients opinion – multivariate statistical analysis. Procedia Engineering, 123, 182-189.
  • Ibadov, N. & Kulejewski, J. (2015). Evaluation of the project timeliness with fuzzy constraints, International Conference of Numerical Analysis and Applied Mathematics (ICNAAM-2015). AIP Conference Proceedings, 1648(1), 600002.
  • Jaśkowski, P. & Biruk, S. (2010). Analiza czynników ryzyka czasu realizacji przedsięwzięć budowlanych. Czasopismo Techniczne, Budownictwo, 1-B(2), 157-166.
  • Kazaz, A., Ulubeyli, S. & Tuncbilekli, N.A. (2012). Causes of delays in construction projects in Turkey. Journal of Civil Engineering and Management, 3, 426-435.
  • Krzemiński, M. (2016). KASS v.2.2. Scheduling Software for Construction with Optimization Criteria Description. Acta Physica Polonica A, 309(6), 1439-1442.
  • Leśniak, A. (2012). Przyczyny opóźnień budowy w opiniach wykonawców. Czasopismo Techniczne, Budownictwo, 1-B(2), 57-68.
  • Leśniak, A. & Piskorz, G. (2017). Potential reasons for works delays resulting from the provisions of the agreement. Technical Transactions, 6, 135-143.
  • Lim, C.S. & Mohamed, M.Z. (2000). An exploratory study into recurring construction problems. International Journal of Project Managemen, 18(3), 267-273.
  • Lo, T.Y., Fung, I.W.H. & Tung, K.C.F. (2006). Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), 636-649.
  • Mackova, M., Kozlovska, M., Baskova, R., Spisakova, M. & Krajnikova, K. (2017). Construction-duration prediction model for residential buildings in Slovak Republic based on computer simulation. International Journal of Applied Engineering Research, 12(13), 3590-3599.
  • Połoński, M. & Pruszyński, K. (2013). Impact of baseline terms on the course of critical paths and time buffers in the modified Goldratt’s method. Archives of Civil Engineering, 59 (3), 313-320.
  • Sambasivan, M. & Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517-526.
  • Skorupka, D. (2008). Identification and initial risk assessment of construction projects in Poland. Journal of Management In Engineering ASCE, 24(3), 120-127.
  • Toor, S. & Ogunlana, S.O. (2008). Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), 395-408.
  • Zima, K. (2017). Index cost estimate based BIM method – Computational example for sports fields. AIP Conference Proceedings, 1863, 230015.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2021).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-58a8eba0-9ac5-4e07-82ab-db55c4218f17
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.