PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Life cycle cost estimation and environmental valuation of coal mine tailings management

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Sustainable mining management is increasingly seen as an important issue in achieving a social license to operate for mining companies. This study describes the life cycle cost (LCC) analysis and environmental valuation for several coal mine tailings management scenarios. The economic feasibility of six different options was assessed using the Net Present Value (NPV) and Benefit-Cost Analysis (BCA) methods. These options were belt press (OPT 1), tailings paste (OPT 2), thickened tailings (OPT 3), and OPT 1 with technology improvement and renewable energy sources (OPT 1A-C). The results revealed that OPT 1A (belt press technology with stack cell flotation) was the first preference in terms of LCC while OPT 1C (belt press technology with stack cell flotation and 10% wind energy) generated the highest benefits value (BCA) compared to the other options. The LCC and BCA components and the volume of GHG emissions were used to determine the best option. Normalization of these three elements resulted in the selection of Option 1C as being the most cost-effective option.
Rocznik
Strony
114--125
Opis fizyczny
Bibliogr. 68 poz.
Twórcy
  • Curtin University, School of Civil and Mechanical Engineering, Sustainable Engineering Group, Perth, Australia
autor
  • Curtin University, School of Civil and Mechanical Engineering, Sustainable Engineering Group, Perth, Australia
  • Universitas Muhammadiyah Mataram, Department of Mining Engineering, West Nusa Tenggara, Indonesia
autor
  • Curtin University, School of Civil and Mechanical Engineering, Sustainable Engineering Group, Perth, Australia
autor
  • CSIRO Mineral Resources, Private Bag 10, Clayton South, VIC 3169, Australia
Bibliografia
  • 1. Adiansyah, J. S., Haque, N., Rosano, M., & Biswas, W. (2017). Application of life cycle assessment to compare environmental performance in coal mine tailings management. Journal of Environmental Management, 199, 181-191.
  • 2. Adiansyah, J. S., Rosano, M., Vink, S., & Keir, G. (2015). A framework for a sustainable approach to mine tailings management: Disposal strategies. Journal of Cleaner Production, 108, 1050-1062.
  • 3. Adiansyah, J. S., Rosano, M., Vink, S., Keir, G., & Stokes, J. R. (2016). Synergising water and energy requirements to improve sustainability performance in mine tailings management. Journal of Cleaner Production, 133, 5-17.
  • 4. Ahlroth, S., Nilsson, M., Finnveden, G., Hjelm, O., & Hochschorner, E. (2011). Weighting and valuation in selected environmental system analysis tools - suggestions for further developments. Journal of Cleaner Production, 19(2), 145-156.
  • 5. AS/NZS. (2014). Life cycle costing e an application guide.
  • 6. Australian Energy Market Operator. (2016). Average price tables. Retrieved August 1, 2017 from http://www.aemo.com.au/Electricity/Data/Price-and-Demand/Average-Price-Tables.
  • 7. Australian Government. (2014). Research Report: Environmental valuation and uncertainty (report). Canberra: Australian Government, Department of the Prime Minister and Cabinet.
  • 8. Australian Government. (2016). Guidance note: Cost-benefit analysis. Canberra: Australian Government, Department of the Prime Minister and Cabinet.
  • 9. Azapagic, A. (1999). Life cycle assessment and its application to process selection, design and optimisation. Chemical Engineering Journal, 73(1), 1-21.
  • 10. Bell, F. G., Bullock, S. E. T., Hälbich, T. F. J., & Lindsay, P. (2001). Environmental impacts associated with an abandoned mine in the Witbank Coalfield, South Africa. International Journal of Coal Geology, 45(2), 195-216.
  • 11. Bian, Z., Dong, J., Lei, S., Leng, H., Mu, S., & Wang, H. (2009). The impact of disposal and treatment of coal mining wastes on environment and farmland. Environmental Geology, 58(3), 625-634.
  • 12. Bickert, G. (2004). Review of tailings dewatering technologies for Australian coal processing plants. Project number 14012. Brisbane: ACARP.
  • 13. Brealey, R. A., Myers, S. C., Allen, F., & Mohanty, P. (2012). Principles of corporate finance. New York: Tata McGraw-Hill Education.
  • 14. Burton, M., Zahedi, S. J., & White, B. (2012). Public preferences for timeliness and quality of mine site rehabilitation. The case of bauxite mining in Western Australia. Resources Policy, 37(1), 1-9.
  • 15. Callan, S. J., & Thomas, J. M. (2013). Environmental economics and management: Theory, policy, and applications. Boston: Cengage Learning.
  • 16. Commonwealth of Australia. (2014). Environmental management plan guidelines. Canberra: Department of the Environment.
  • 17. Damigos, D. (2006). An overview of environmental valuation methods for the mining industry. Journal of Cleaner Production, 14, 234-247.
  • 18. Damigos, D., Menegaki, M., & Kaliampakos, D. (2016). Monetizing the social benefits of landfill mining: Evidence from a Contingent Valuation survey in a rural area in Greece. Waste Management, 51, 119-129.
  • 19. Danthurebandara, M., Van Passel, S., Machiels, L., & Van Acker, K. (2015). Valorization of thermal treatment residues in enhanced landfill mining: Environmental and economic evaluation. Journal of Cleaner Production, 99, 275-285.
  • 20. De Groot, R. S., Wilson, M. A., & Boumans, R. M. J. (2002). A typology for the classification, description and valuation of ecosystem functions, goods and services. Ecological Economics, 41(3), 393-408.
  • 21. Dlamini, C. S. (2012). Types of values and valuation methods for environmental resources: Highlights of key aspects, concepts and approaches in the economic valuation of forest goods and services. Journal of Horticulture and Forestry, 4(12), 181-189.
  • 22. Economics, G. (2008). Managing the impacts of a mine in the southern coalfield: A survey of community attitudes. Sydney: Helensburgh Coal Pty Ltd.
  • 23. Eggert, R. G. (2001). Mining and economic sustainability: National economies and local communities. London: IIED.
  • 24. EMGA Mitchell McLennan. (2012). Cobbora Coal: Project description (report). St Leonards: EMGA Mitchell McLennan.
  • 25. Energy Information Administration. (2016). International energy Outlook 2016 (report). Washington, DC: U.S. Energy Information Administration.
  • 26. Epstein, P. R., Buonocore, J. J., Eckerle, K., Hendryx, M., Stout Iii, B. M., Heinberg, R., et al. (2011). Full cost accounting for the life cycle of coal. Annals of the New York Academy of Sciences, 1219(1), 73-98.
  • 27. Erkayaoğlu, M., & Demirel, N. (2016). A comparative life cycle assessment of material handling systems for sustainable mining. Journal of Environmental Management, 174, 1-6.
  • 28. Fawell, P., Adkins, S., & Costine, A. (2015). Reagents. In R. J. Jewell, & A. B. Fourie (Eds.), Paste and thickened tailings e a guide (pp. 87-108). Crawley: Australian Centre for Geomechanics.
  • 29. Fenzel, M. S. (2012). Belt filter press in coal tailings dewatering e a comprehensive economic, design, and process analysis. In M. S. Klima, B. J. Arnold, & P. J. Bethell (Eds.), Challenges in fine Coal: Processing, dewatering, and disposal (pp. 309-327). Colorado, USA: SME.
  • 30. Finnveden, G., & Moberg, Å. (2005). Environmental systems analysis tools – an overview. Journal of Cleaner Production, 13, 1165-1173.
  • 31. Franks, D. M., Brereton, D., & Moran, C. J. (2010). Managing the cumulative impacts of coal mining on regional communities and environments in Australia. Impact Assessment and Project Appraisal, 28(4), 299-312.
  • 32. GHD. (2013). Report for mine waste management Strategy: Carmichael coal mine and rail project SEIS (report). Brisbane: GHD Pty Ltd.
  • 33. Gillespie, E. (2012). Cobbora coal Project: Appendix r e economic assessment (report). Melbourne: Economists at Large Pty Ltd.
  • 34. Gordon, I. (2014). Updated capital cost estimate for PIOP. Washington: U. S. department of Energy.
  • 35. Haque, N., & Norgate, T. (2015). Life cycle assessment of iron ore mining and processing. In L. Lu (Ed.), Iron Ore: Mineralogy, processing and environmental sustainability (pp. 615-630). Amsterdam: Elsevier.
  • 36. Harrison, M. (2010). Valuing the future: The social discount rate in cost-benefit analysis. Canberra: Productivity Commission.
  • 37. Höjer, M., Ahlroth, S., Dreborg, K.-H., Ekvall, T., Finnveden, G., Hjelm, O., et al. (2008). Scenarios in selected tools for environmental systems analysis. Journal of Cleaner Production, 16, 1958-1970.
  • 38. Honaker, R., Kohmuench, J., & Luttrell, G. (2013). Cleaning of fine and ultrafine coal. In D. Osborne (Ed.), The coal Handbook: Toward cleaner production. Oxford, Cambridge, Philadelphia, New Delhi: Woodhead Publishing.
  • 39. Huppes, G., & Ishikawa, M. (2005). A framework for quantified eco-efficiency analysis. Journal of Industrial Ecology, 9(4), 25-41.
  • 40. Index, M. (2016). Coal: Australian thermal coal monthly price. Retrieved August 1, 2017 from http://www.indexmundi.com/commodities/?commodityĽcoalaustralian&monthsĽ60&currencyĽaud.
  • 41. Islam, H., Jollands, M., Setunge, S., Ahmed, I., & Haque, N. (2014). Life cycle assessment and life cycle cost implications of wall assemblages designs. Energy and Buildings, 84, 33-45.
  • 42. Jacobson, N., Wayder, J., & Franslin, S. (2013). Solar farm feasibility study (report). Turner: IT Power (Australia) Pty Limited.
  • 43. Jones, H., & Watkins, R. (2015). Closure considerations. In R. J. Jewell, & A. B. Fourie (Eds.), Paste and thickened tailings e a guide (pp. 259-279). Crawley: Australian Centre for Geomechanics.
  • 44. Kohmuench, J. N., Yan, E. S., & Christodoulou, L. (2012). Column and nonconventional flotation for coal recovery: Circuitry, methods, and considerations. In M. S. Klima, A. J. Barbara, & P. J. Bethell (Eds.), Challenges in fine Coal: Processing, dewatering, and disposal (pp. 187-209). Colorado, USA: SME.
  • 45. Kossoff, D., Dubbin, W. E., Alfredsson, M., Edwards, S. J., Macklin, M. G., & Hudson-Edwards, K. A. (2014). Mine tailings dams: Characteristics, failure, environmental impacts, and remediation. Applied Geochemistry, 51, 229-245.
  • 46. Kumar, S., Bhattacharya, S., Mandre, N. R., & Venugopal, R. (2014). Present challenges in the performance of coal fines dewatering circuit. International Journal of Engineering Research and Science & Technology, 3(2), 172-179.
  • 47. Mangan, S. D., & Oral, G. K. (2016). Assessment of residential building performances for the different climate zones of Turkey in terms of life cycle energy and cost efficiency. Energy and Buildings, 110, 362-376.
  • 48. Marre, J.-B., Thébaud, O., Pascoe, S., Jennings, S., Boncoeur, J., & Coglan, L. (2016). Is economic valuation of ecosystem services useful to decision-makers? Lessons learned from Australian coastal and marine management. Journal of Environmental Management, 178, 52-62.
  • 49. Mazzotta, M., Wainger, L., Sifleet, S., Petty, J. T., & Rashleigh, B. (2015). Benefit transfer with limited data: An application to recreational fishing losses from surface mining. Ecological Economics, 119, 384-398.
  • 50. McLellan, B. C., Corder, G. D., Giurco, D., & Green, S. (2009). Incorporating sustainable development in the design of mineral processing operations e review and analysis of current approaches. Journal of Cleaner Production, 17(16), 1414-1425.
  • 51. Miranda, M., Burris, P., Bingcang, J. F., Shearman, P., Briones, J. O., La Vina, A., et al. (2003). Mining and critical Ecosystems: Mapping the risks. Washington, DC: World Resources Institute.
  • 52. Moolman, P. L., & Vietti, A. (2012). Tailings Disposal: An approach to optimize water and energy efficiency. In 5th International Platinum Conference, 17-21 September 2012 Sun City (pp. 767-779). Johannesburg: The Southern African Institute of Mining and Metallurgy.
  • 53. New Hope Group. (2014). Appendix J: In-pit tailings storage facility management plan (report). Ipswich: New Hope Group e New Auckland Coal Mine.
  • 54. Newmont. (2016). Operation facts. Retrieved August 1, 2017 from http://www.newmont.com/operations-and-projects/asia/batu-hijau-indonesia/operationfacts/default.aspx.
  • 55. Newmont Nusa Tenggara. (2016). Tentang PT Newmont Nusa Tenggara. Retrieved August 1, 2017 from http://www.ptnnt.co.id/id/sejarah.aspx.
  • 56. NSW Government. (2016). Water management fees and charges. Retrieved August 1, 2017 from http://www.water.nsw.gov.au/water-management/fees-and-charges. Owen, M. J. (1989). Enhancement of mechanical dewatering of fine coal by surfaceactive additives. In G. D. Botsaris (Ed.), Interfacial phenomena coal technology (pp. 157-195). New York: CRC Press.
  • 57. Perusahaan Listrik Negara. (2015). 35.000 MW untuk Indonesia.
  • 58. QCC. (2013). Appendix C: Dewatering options report e comparison of options for tailings dewatering (report). Hexham: QCC Resources Pty Ltd.
  • 59. Qugley, J. (2016). Notices: Bond rate guidelines for the calculation of land reclamation bonds on coal mining operations. Retrieved August 1, 2017 from http://www.pabulletin.com/secure/data/vol46/46-10/374.html.
  • 60. Reserve Bank of Australia. (2016a). Inflation calculator. Retrieved August 1, 2017 from http://www.rba.gov.au/calculator/annualDecimal.html.
  • 61. Reserve Bank of Australia. (2016b). Inflation target. Retrieved August 1, 2017 from http://www.rba.gov.au/monetary-policy/inflation-target.html.
  • 62. Sánchez, A. S., Krzemień, A., Fernández, P. R., Rodríguez, F. J. I., Lasheras, F. S., & de Cos Juez, F. J. (2015). Investment in new tungsten mining projects. Resources Policy, 46, 177-190.
  • 63. Standard. (2016). AS IEC 60300.3.3-2005: Dependability management - Part 3.3: Application guidee Life cycle costing.
  • 64. Thomas, L. P. (2013). Coal resources and reserves. In D. Osborne (Ed.), The coal Handbook: Toward cleaner production. Oxford, Cambridge, Philadelphia, New Delhi: Woodhead Publishing.
  • 65. Wang, L. K., Shammas, N. K., & Hung, Y.-T. (2007). Biosolids treatment processes. Totowa, New Jersey: Humana Press.
  • 66. Windustry. (2012). How much do wind turbines cost?. Retrieved August 1, 2017 from http://www.windustry.org/how_much_do_wind_turbines_cost.
  • 67. World Bank and Ecofys. (2016). Carbon pricing watch 2016. London: Ecofys. World Nuclear Association. (2013). Australia's Electricity. Retrived August 1, 2017 from http://www.world-nuclear.org/info/Country-Profiles/Countries-A-F/Appendices/Australia-s-Electricity/.
  • 68. Zhengfu, B., Hillary, I., John, L. D., Frank, O., & Sue, S. (2010). Environmental issues from coal mining and their solutions. Mining Science and Technology (China), 20(2), 215-223.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-22886d4b-7a9a-42a8-ae6b-d72e4373cc12
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.