An essay presents the method and tool which can be used to control the mass of aggregates deliveries under construction site conditions. The method based on statistics allows determining the optimal quantity of transports to be inspected, required to estimate the total sum of loose materials deliveries assuming estimation error and confidence level conditions. Inspection based on described method allows to improve the effectiveness of earthworks execution as well as gives the possibility to evaluate the quality of the supplier.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.