Ten serwis zostanie wyłączony 2025-02-11.
Nowa wersja platformy, zawierająca wyłącznie zasoby pełnotekstowe, jest już dostępna.
Przejdź na https://bibliotekanauki.pl
Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 3

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  model FEMWATER
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
|
|
tom Vol. 53, nr 9
770--775
EN
The numerical modelling of groundwater flow and pollutant transport was performed for the old sanitary landfill surrounded by a vertical bentonite barrier. The recirculation system of leachate applied on the landfill was also included in transport modelling. The simulation, using FEMWATER software, aimed at assessment of the vertical bentonite barrier influence on shaping of groundwater level in subsoil on surroundings, as well as estimating the infiltration time of leachate in the waste body during recirculation. The results of groundwater monitoring were used for verification and calibration of the numerical model.
EN
The construction of cut-off walls is a common solution applied in such disciplines as land reclamation and landfill containment. Most commonly the construction of vertical barriers is based on cut-off wall mono or diphase technology with the use of bentonite-cement mixture as a filling material. The content of the paper is focused on groundwater flow and transport numerical modeling conducted on landfill areas where vertical bentonite barriers were constructed. The modeling process was conducted with the use of FEMWATER software which employs analysis based on finite element method. There are two examples of the software application presented in the paper which concern such case studies, i.e., reclamation of Radiowo and Łubna landfill sites. These examples are provided to prove that the appropriate investigation of ground conditions as well as definition of initial and boundary conditions and correct selection of material parameters to be fed into the software, are crucial for the overall modeling process. Moreover, the comparison of results obtained from the numerical modeling and the groundwater monitoring on site is presented for one of the case studies.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.