The paper presents the comparison of deterministic and stochastic approach for modeling the set of earthworks machinery. Simulation takes into account the normal distribution of cycle time and efficiency of machines and points out its influence for total construction works time. Results of the simulation indicate the need of identification time and efficiency deviation as a risk factor, which can cause delay whenever earthworks cycle includes the serial work of several machines.
An essay presents the method and tool which can be used to control the mass of aggregates deliveries under construction site conditions. The method based on statistics allows determining the optimal quantity of transports to be inspected, required to estimate the total sum of loose materials deliveries assuming estimation error and confidence level conditions. Inspection based on described method allows to improve the effectiveness of earthworks execution as well as gives the possibility to evaluate the quality of the supplier.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.