Article deals with a fractional and chemical composition of sediments from the sediment reservoir in Ilyash village, Ferghana region, Uzbekistan (Syr Darya river basin) and analyses their feasibility. As a key factor in the study of this process was considered the fractional and agrochemical composition of sediments moving with water in the sediment reservoir, and the change of their share in the water along the length of the reservoir. The main composition of the sediments in reservoir consists of fractions >0.25 and 0.25–0.01 mm, with the average fraction of 69% in the inlet and 60% in the outlet. The river sediments are rich in minerals important for the irrigated cropland. Based on the results we conclude that it is possible to regulate the number of chemical compounds in the water by controlling the exploitation regime of reservoir and the sedimentation process in it.
When taking water from pre-mountain rivers, for transferring of large amounts of river sediments, rich in mineral fertilizers, along with water to crop fields through irrigation networks requires high sediment transport capacity and deformation resistance from irrigation networks. The projecting and construction of irrigation canals with these features in the foothills requires concreting the canal. The high content of river sediments in the Sokh River (5 kg∙m-3) and the low efficiency of the Right Bank Irrigation Reservoir (10-15%) require high hydraulic efficiency of water intake canals from this system. The main challenge is to reduce costs in concreted canals and ultimately ensure technical superiority. In the research were used generally accepted research methods in hydraulics, in particular field research and consequently, mathematical analysis. Kokandsay, Kartan and Bachkir irrigation canals were accepted as the object of research, the canals were designed on the basis of the best hydraulic section, the canal side slope was taken as a variable parameter and the technical and economic efficiency was checked using computer software. As a result, it was found that the consumption of concrete raw material for 1 running meter can save 0.2-0.3 m3, depending on the adoption of the canal side slope, the acceptance of the slope of the canal wall at values 1-1.5 will increase up to sedimentation 10%.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.