The article presents the results of archaeological excavations in two locations where geophysical surveys were carried out for the first time on Polish excavations in Egypt: Tell Atrib (ancient Athribis in Lower Egypt) and Saqqara (west of the pyramid of Djoser). It emphasizes the interdependence of archaeological and geophysical research. Particularly interesting were the results of three geophysical surveys made in Saqqara in 1987, 1997 and 2012 by three different teams using different methods. All of them helped identifying archaeological structures in two subsequent layers corresponding to two periods: a) Old Kingdom (lower stratum) with rock-hewn tombs of high officials; b) Ptolemaic Period with hundreds of burials found in a layer of sand (upper stratum).
Głównym celem pracy było zbadanie algorytmów rozwiązujących problem kolorowania grafu, kolejno: algorytmów zachłannych LF (ang. Largest First) i SFL (ang. Saturated Largest First), algorytmu genetycznego sekwencyjnego oraz równoległego. Ponadto, zaimplementowana została aplikacja działającej w środowisku przeglądarki internetowej pozwalająca na wizualizacje 3D procesu kolorowania grafu wraz z regulacją parametrów grafu (takich jak liczba wierzchołków i gęstość grafu) oraz obserwację uzyskanych wyników (czasu wykonywania algorytmu i liczby dobranych kolorów).
EN
The main aim of the study was to examine four algorithms concerning the graph colouring problem, respectively: LF (Largest First), SFL (Saturated Largest First), genetic algorithm, both sequential and multithreaded. Additionally, an application in a web browser environment was created to 3D visualisation of the graph colouring process allowing adjustment of graph parameters (such as number of vertices and graph density) and observation of the obtained results (execution time and number of colours).
W artykule dokonano porównania wyników obliczeń obudowy zmecha-nizowanej metodą elementów skończonych z wynikami pomiarów wykonanych w trakcie badań stanowiskowych niezbędnych dla dopusz-czcnia obudowy do stosowania w podziemnych zakładach górniczych. Opisano model sekcji, przyjęte założenia upraszcząjące oraz przedsta-wiono wyniki obliczeń. Porównując je z wynikami pomiarów wykona-nych na stanowisku badawczym przeanalizowano założenia upraszczają-ce przyjmowane w obliczeniach oraz warunki symulacji badań stanowi-skowych obudów zmechanizowanych na modelach sekcji.
EN
The article makes a comparison between the powered supports calcu-lation results, using the finite elements method and the results of measurements performed during on-stand tests necessary to accept the supports for use in underground mining plants. A section model, the accepted simplifying assumptions and calculation results are pre-sented. By comparison between these results and the results of meas-urements made on a testing stand, the simplifying assumptions, ac-cepted for calculation, and the simulation conditions of powered supports on-stand tests have been studied on the section models.
W artykule przedstawiono warunki, przebiegu i wyniki badań eksploatacyjnych nowej generacji zmechanizowanej, bezlemniskatowej ścianowej obudowy podporowo-osłonowej Glinik-13/22-POz, przeprowadzonych w ścianie 32, w pokładzie 334 Kopalni Węgla Kamiennego "Murcki" w Katowicach. W podziemiach kopalni mogą być stosowane obudowy zmechanizowane, które uzyskały odpowiednie dopuszczenie w trybie obowiązujących przepisów. Uzyskane wyniki badań i obserwacji, tak na powierzchni jak i na dole kopalni, pozwoliły na sprawdzenie założeń oraz właściwości konstrukcji obudowy, jak również jej funkcjonalności i działania układu sterowania.
EN
The article precsents conditions, course and results of exploitation investigations on a new generation of powered, lemiscateless, supporting - shield support Glinik 13/22 -POz carried out at longwall 32 in seam 334 at "Murcki" hard coal mines in Katowice. Only the powered supports that reccived admission in conformity with the obeying regulation may be used in underground workings. The results obtained from investigations and observations both on the surface and underground allowed to check the assumptions and construction properties of the support as well as its fimctionality and operation of the control system.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.