Nowa wersja platformy, zawierająca wyłącznie zasoby pełnotekstowe, jest już dostępna.
Przejdź na https://bibliotekanauki.pl
Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 4

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
1
Content available Development dilemmas of water transport of Mazovia
100%
EN
The Polish government conducts program works on the development of the E40 waterway along the Vistula and the Bug in accordance with the European Agreement on the main inland waterways of international importance (AGN). In light of the current investment practice, there is still a long way to go for the implementation of the E40 waterway in Mazovia, while the current findings of these programs and related study plans are at many points controversial. In this situation, this article aims to identify the weaknesses of these findings, indicate other ways to solve the already embarrassing decision-making situations (dilemmas), analyze and evaluate basic decision-making alternatives, and choose optimal solutions for Mazovia. The author has identified the following basic decision dilemmas: (0) Does a waterway network in Mazovia exist or not? (1) Whether to build this network or not? (2) Whether to reject the AGN Agreement or not? (3) Whether to build a network in full or limited spatial extent? (4) Whether to build following AGN or lower waterwaytechnical classes? (5) Whether to build against ecologists or in harmony with them? As a result of detailed analyzes and assessments, the author chose to solve these dilemmas, assuming (0) the lack of the waterway network in its current state, (1) undertaking the investment program for the construction of this network as satisfying the potential undisclosed demand in the field of water transport, (2) not rejecting the AGN Agreement as consistent with the long-term EU transport policy, (3) building the waterway network in the full spatial scope, (4) constructing a complete network in one step, i.e. at least Vb (2,80 m) class, as well as (5) creatingthis waterway network in agreement with ecologists. When adopting such design assumptions, a positive plan is outlined, which would involve, first of all, resigning from the existing plans to build the Vistula, Narew and Bug cascades as leading to the obtaining the waterways of undervalued classes IV and Va and to the right protests of ecologists, and secondly replacing the cascade with the construction of side shipping canalsof Vb (2,80 m) class or higher located within the broad valleys of the Vistula and the Narew but outside the most valuable natural areas of these valleys. In relation to the Bug waterway, the author prefers the course of the canal beyond the river valley through Wilga and Garwolin.
PL
Polski rząd prowadzi prace programowe dotyczące rozwoju drogi wodnej E40 wzdłuż Wisły i Bugu, których celem jest budowa tej drogi wodnej zgodnie z przyjętym przez Polskę Europejskim porozumieniem ws. głównych śródlądowych dróg wodnych o znaczeniu międzynarodowym (AGN). W świetle dotychczasowej praktyki inwestycyjnej, do realizacji drogi E40 na Mazowszu jest zatem jeszcze daleka droga, a tymczasem dotychczasowe ustalenia tych programów oraz powiązanych z nimi planów studialnych są w wielu punktach kontrowersyjne. W tej sytuacji niniejszy artykuł ma na celu identyfikację słabych stron tych ustaleń, wskazanie innych sposobów rozwiązania ujawnionych już kłopotliwych sytuacji decyzyjnych (dylematów), analizę i ocenę podstawowych alternatyw decyzyjnych oraz wybór rozwiązań optymalnych w odniesieniu do kluczowego obszaru Mazowsza. Autor zidentyfikował następujące podstawowe dylematy decyzyjne: (0) Istnieje czy nie istnieje sieć dróg wodnych na Mazowszu? (1) Budować czy nie budować tę sieć? (2) Odrzucić Porozumienie AGN czy nie odrzucać? (3) Budować sieć w pełnym czy ograniczonym zakresie przestrzennym? (4) Budować zgodnie z AGN czy zaniżyć klasy techniczne dróg? (5) Budować wbrew ekologom czy w zgodzie z nimi? W wyniku analiz i ocen szczegółowych autor wybrał rozwiązanie tych dylematów, zakładające (0) brak sieci dróg wodnych w stanie istniejącym, (1) podjęcie programu inwestycyjnego budowy tej sieci jako zaspokajającego potencjalny nieujawniony popyt w zakresie transportu wodnego, (2) nieodrzucanie Porozumienia AGN jako zgodnego z długofalową polityką transportową UE, (3) budowę sieci dróg docelowo w pełnym zakresie przestrzennym, (4) budowę pełnowartościowej sieci jednoetapowo, tj. od razu na klasę co najmniej Vb (2,80 m), a także (5) budowę tej sieci docelowej w zgodzie z ekologami. Przy przyjęciu takich założeń projektowych zarysowuje się plan pozytywny, który polegałby po pierwsze na rezygnacji z dotychczasowych planów budowy kaskady Wisły, Narwi i Bugu jako prowadzących do uzyskania drogi wodnej zaniżonych klas IV i Va oraz budzących słuszny sprzeciw ekologów oraz, po drugie, zastąpienie kaskady budową bocznych kanałów żeglugowych klasy Vb (2,80 m) lub wyższej w obrębie szerokich dolin Wisły i Narwi, ale poza najcenniejszymi przyrodniczo obszarami tych dolin. W stosunku do drogi wodnej Bugu autor preferuje przebieg kanału poza doliną tej rzeki przez Wilgę i Garwolin.
PL
Główne porty w Polsce są położone niefortunnie, wyłącznie przy zachodnim albo wschodnim krańcu polskiego wybrzeża Bałtyku, czyli przy ujściu Odry albo w rejonie ujścia Wisły do morza, i są odległe od siebie o ok. 280–290 km w linii prostej. Warto zatem rozważyć zasadność budowy czwartego portu głębokowodnego, położonego mniej więcej pośrodku między nimi, a więc gdzieś na środkowym Pomorzu, najlepiej na odcinku wybrzeża między głównymi miastami tej części Pomorza, między Kołobrzegiem a Koszalinem. W tym celu w niniejszym opracowaniu przeanalizowano uwarunkowania planistyczne, transportowe, przyrodnicze i hydrograficzne, przedstawiono argumenty za i przeciw takiej inwestycji, a w końcu – po stwierdzeniu celowości inwestycji – podano orientacyjne miejsca lokalizacji inwestycji, oceniono je w sposób wielokryterialny i wskazano lokalizację optymalną. Z wykonanej analizy SWOT wynika, że pozytywne aspekty budowy nowego portu zdecydowanie przeważają nad negatywami, wobec czego wstępnie przyjęto, że realizacja inwestycji jest celowa, przy czym zastrzeżono się, że wnioski te odnoszą się wyłącznie do założonego scenariusza dalszego szybkiego rozwoju gospodarki morskiej w Polsce. Przyjmując celowość budowy nowego portu morskiego jako założenie wstępne, określono generalny program inwestycji, przewidując powstanie w okresie docelowym w ramach portu dwóch baz kontenerowych, po jednym terminalu gazowym i naftowym, a także bazy promowej oraz nabrzeża dla statków pasażerskich. Oznacza to, że po zakończeniu takiej inwestycji teren portu zajmowałby ok. 6 km2 powierzchni, w tym ok. 3 km2 powierzchni przypadałoby na baseny portowe wraz z obrotnicami, a ok. 2 km2 na sztuczny półwysep z nabrzeżami, składowiskami, drogami i bocznicami kolejowymi. Określono wstępnie następujące warianty ogólnych lokalizacji analizowanego przedsięwzięcia: „Kołobrzeg”, „Pleśna”, „Gąski”, „Mielenko” oraz „Jezioro Jamno”, a następnie zebrano podstawowe dane charakteryzujące każdy wariant pod względem hydrologicznym, technicznym, ekonomicznym i środowiskowym. W rezultacie wykonanej analizy wielokryterialnej okazało się, że zdecydowanie najlepszą lokalizacją portu morskiego będzie wariant 5. „Jezioro Jamno”, a pod uwagę można również brać drugą w kolejności najlepszą lokalizację, tj. wariant 4. „Mielenko”. Oba te warianty wzmacniają funkcję osadniczą miasta Koszalin, co jest w pełni zgodne z planem wojewódzkim – planowany biegun wzrostu w Koszalinie.
EN
The main seaports in Poland have unfortunate locations, only at the western or eastern end of the Polish Baltic coast, i.e. at the Odra river mouth or at the Vistula river mouth (estuary) and the distance between them is 280 – 290 km (in a straight line). Therefore, the construction of a fourth deepwater port is worth considering. It should be located roughly in the middle, somewhere in central Pomerania. The preferred location is on the coastal section between the major cities of that part of Pomerania, i.e. Kołobrzeg and Koszalin. The article presents an analysis of, transport, natural and hydrographic con-ditions. The arguments for and against such an investment are presented. Finally – after determining the advisability of the investment – investment locations are indicated (assessed using a multi-criteria approach) and the optimal location is chosen. The SWOT analysis shows that the positive aspects of building a new port definitely outweigh the negatives, so it was initially assumed that realizing the project is reasonable. However, these conclusions are only applicable in the assumed scenario of the further rapid development of the maritime economy in Poland. Under the preliminary assumption of the advisability of building a new seaport, the general investment program was defined. Two container bases are planned to be built within the port in the target period – one gas and one oil terminal, as well as a ferry base and quay for passenger ships. This means that after the completion of the project, the port area would cover about 6 km2, including about 3 km2 of port basins (including turntables), and ca. 2 km2 of an artificial peninsula with quays, storage yards, roads and railway sidings. The following locations for the analysed project were initially defined: “Kołobrzeg”, “Pleśna”, “Gąski”, “Mielenko” and “Jamno Lake”. Next, basic data were collected characterising each variant hydrological, technical, economic and environmental terms. As a result of the multi-criteria analysis, the 5th variant – „Jamno Lake” was identified as by far the best location for the seaport. The second best location, i.e. the 4th variant – “Mielenko”, may also be taken into account. Both of these options strengthen the settlement function of the city of Koszalin, which is in line with the regional spatial development plan’s provisions concerning the planned growth pole in Koszalin.
3
Content available Celowość budowy autostrady obwodowej Warszawy
100%
EN
Many large cities have road bypass systems consisting of at least one external ring road, most often implemented in the motorway standard. According to the current Polish National Road Construction Program (PBDK), by the end of 2025 the internal Warsaw bypass (EOW) should be completed, which could be followed by starting the construction of an external motorway bypass along the route preliminarily designated in the National Spatial Development Concept (KPZK 2030). However, many specialists are not convinced of the need to build such a motorway bypass of Warsaw (AOW). The aim of this paper is to investigate whether the construction of the AOW is advisable, i.e. whether it makes sense, taking into account existing and future spatial conditions, in particular those in the fields of transport and the environment. For the purposes of this investigation, it is necessary to clarify the location of the bypass and determine the future road layout within which the AOW could potentially function. With such input data, it is possible to perform a spatial and transport analysis which will allow the key question regarding the advisability of building the AOW to be answered. As a result of the analysis of general spatial and environmental conditions, a shortening of the AOW by about 40 km (c. 15%) was proposed in relation to its course presented in the KPZK 2030, thus reducing the estimated costs of construction from approx. PLN 8.3 billion up to approx. PLN 7.2 billion. As part of the spatial and transport analysis for such a corrected course of the AOW, the time differences were calculated for journeys by this bypass and through the city for basic diametrical transit relations. It turned out that the transit time via the Warsaw road node for these diametrical relations would be shorter by, on average, 11 minutes if the driver chose the AOW instead of the EOW. This means that the construction of the AOW is expedient, and its degree of urgency will increase along with the unavoidable increase in congestion on the EOW. The carried out analyses lead to a general recommendation of adopting the abovementioned shortened course of the AOW in future updates of planning and development documents. In particular, it is necessary to amend the regulation of the Council of Ministers regarding motorways and expressways, replacing the approved fragment of the outer Warsaw bypass (S10 on the Nowy Dwór Mazowiecki – Wołomin section) with the full Warsaw ring motorway (A50).
PL
Wiele dużych miast ma drogowe systemy obwodnicowe, złożone z co najmniej jednej obwodnicy zewnętrznej, najczęściej realizowanej w standardzie autostrady. Zgodnie z aktualnym Programem Budowy Dróg Krajowych (PBDK) do końca 2025 r. powinna zakończyć się budowa wewnętrznej ekspresowej obwodnicy Warszawy (EOW), po czym można byłoby przystąpić do budowy zewnętrznej obwodnicy autostradowej o przebiegu wstępnie wyznaczonym w Koncepcji przestrzennego zagospodarowania kraju (KPZK 2030). Jednak wielu specjalistów nie jest przekonanych o potrzebie budowy takiej autostradowej obwodnicy Warszawy (AOW). Celem niniejszego artykułu jest zbadanie, czy budowa AOW jest celowa, tzn. czy ma sens, jeśli uwzględnić istniejące i przyszłe uwarunkowania przestrzenne, w tym zwłaszcza uwarunkowania transportowe i ekologiczne. Aby ten cel osiągnąć, konieczne jest uprzednie sprecyzowanie lokalizacji tej obwodnicy i określenie przyszłego układu drogowego, z którym AOW mogłaby potencjalnie współpracować. Mając takie dane wejściowe, możliwe będzie wykonanie końcowej analizy przestrzenno-komunikacyjnej, która umożliwi udzielenie odpowiedzi na kluczowe pytanie dotyczące celowości budowy AOW. W wyniku przeprowadzonej analizy ogólnych uwarunkowań przestrzennych i środowiskowych zaproponowano skrócenie długości AOW w stosunku jej przebiegu przedstawionego w KPZK 2030 o około 40 km (czyli o ok. 15%), a tym samym zmniejszenie szacunkowych kosztów budowy AOW z ok. 8,3 mld zł do ok. 7,2 mld zł. W ramach analizy przestrzenno-komunikacyjnej dla tak skorygowanego przebiegu AOW obliczono różnice czasowe w przejazdach tą obwodnicą i trasą przez miasto dla podstawowych średnicowych relacji tranzytowych. Okazało się, że czas przejazdu przez drogowy węzeł warszawski dla tych relacji średnicowych będzie krótszy średnio o 11 minut, jeśli kierowca wybierze AOW zamiast EOW. Oznacza to, że budowa AOW jest celowa, a jej stopień pilności będzie wzrastać w miarę nieuniknionego wzrostu kongestii na EOW. Z przeprowadzonych analiz wynika zatem ogólna rekomendacja o przyjęciu ww. skróconego przebiegu AOW w przyszłych aktualizacjach dokumentów planistycznych i rozwojowych. Konieczna jest zwłaszcza zmiana Rozporządzenia Rady Ministrów w sprawie autostrad i dróg ekspresowych, polegająca na zastąpieniu obecnie zapisanego fragmentu zewnętrznej obwodnicy Warszawy (S10 na odcinku Nowy Dwór Mazowiecki – Wołomin) pełną autostradową obwodnicą Warszawy (A50).
PL
Obecnie już mało kto neguje konieczność dostosowania sieci drogowych do wymagań ochrony środowiska. Jednak zupełnie inna sytuacja była jeszcze 50 lat temu, gdy zdecydowana większość drogowców podchodziła krytycznie do tzw. „nowinek ekologicznych”. Zmianę nastawienia specjalistów drogowych wymusiły z jednej strony wzrost świadomości ekologicznej społeczeństwa europejskiego i polskiego, a z drugiej – wprowadzenie do przepisów prawnych rozbudowanego prawa ekologicznego zarówno na poziomie unijnym, jak i krajowym.
EN
Roads, especially intercity ones, have a negative impact on the surrounding natural environment because their construction means the transformation of the existing, often valuable in terms of nature, land development into an artificial structure, almost completely devoid of natural elements. The high level of negative environmental impact concerns mainly roads of the highest technical classes, especially motorways and expressways. This impact is limited mainly administratively, primarily by detailed provisions in decisions on environmental conditions. These ecological requirements have resulted in permanent modifications in the field of road design in Poland. The article discusses the most important of these modifications, including the expansion of the location variants, excessive extension of some roads as well as the design of numerous wildlife crossings, noise protection, rainwater treatment devices and new types of roadside greenery. The effect of these changes is, on the one hand, the extension of the process of preparing road investments for implementation and an increase in investment outlays and operating costs in road transport, and on the other hand – a high level of the adaptation of the road network to environmental conditions.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.