Czasopismo
Tytuł artykułu
Autorzy
Wybrane pełne teksty z tego czasopisma
Warianty tytułu
Construction of the Marbella outfall near Biarritz (France)
Języki publikacji
Abstrakty
Since June 30th 2003, the program to fight against the sea water pollution near the coast of Biarritz includes the construction of a new 1.6m diameter, 780m long outfall. It was built by Smet-Tunnelling by means of the pipe-jacking method through subsoil conditions varying between sand and rock (marl and limestone). This paper describes the project modification suggested by Smet-Tunnelling combining the civil engineering methods and the offshore techniques (sinkable TBM, drilling platform, underwater construction) to build and complete this outfall within a very short period of time. Smet-Tunnelling succeeded in suppressing the influence of a capricious sea while remaining quasi-transparent for the tourists.
Czasopismo
Rocznik
Tom
Strony
68-71
Opis fizyczny
il., tab.
Twórcy
Bibliografia
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.baztech-article-BWAK-0007-0022