Warianty tytułu
The washout of the building site cofferdam of the dam "Wióry" on the Świślina
Języki publikacji
Abstrakty
The destruction of the earth-fill cofferdam on the Wiory dam building site in July 2001 caused by overflowing has been described. The cofferdam was designed in accordance to the obligatory building rules. Its construction slowed down the velocity of its destruction and thanks to it the effects of the freshet downstream the building site have been diminished.
Słowa kluczowe
Twórcy
autor
- Ośrodek Technicznej Kontroli Zapór IMGW, Warszawa
Bibliografia
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.baztech-article-BPP1-0033-0007