Warianty tytułu
Języki publikacji
Abstrakty
The fishing shipyard in Banda Aceh City is a privately owned shipyard and is managed in a family manner. The shipyard here is active in carrying out maintenance, repair and construction of new ships when there is demand from consumers. Shipyards in Banda Aceh City generally make ships made of wood. The problem that is currently being faced is that there are many abandoned ships due to lack of finance, natural resources, human resources and the environmental, this is an obstacle to the progress and development of shipyards. The purpose of this study is to determine the inhibiting factors that exist in shipyards in the city of Banda Aceh and find alternative solutions to these problems. The method used in this study is a survey method used to look at existing symptoms and collect data on factors related to research variables and then analyzed using the Fuzzy AHP method. The results of this study indicate that the financial inhibiting factor is the most influential factor in shipyards with a resulting value of 0.4635, the inhibiting factor of Natural Resources is worth 0.35675, the inhibiting factor of Human Resources is worth 0.2865 and the inhibiting factor from the environment is the inhibiting factor which is the lowest or less influential with a value of 0.14325. The alternative solutions to financial problems are capital loans and investments. An alternative for natural resources is the addition of a minimum stock to anticipate stock scarcity and delays in the delivery of materials and tools. The alternative for human resources is the existence of an office, organizational structure, and division of tasks as well as awareness of occupational health and safety. As for the alternatives for the environment, namely the need for buildings or installation of tarpaulins for areas where ships are built, good land management and studies of other natural impacts.
Rocznik
Tom
Strony
409--414
Opis fizyczny
Bibliogr. 21 poz., rys., tab.
Twórcy
autor
- Syiah Kuala University, Darussalam, Banda Aceh, Indonesia
autor
- Syiah Kuala University, Darussalam, Banda Aceh, Indonesia
autor
- Syiah Kuala University, Darussalam, Banda Aceh, Indonesia
autor
- Teuku Umar University, Meulaboh, West Aceh, Indonesia
autor
- Teuku Umar University, Meulaboh, West Aceh, Indonesia
autor
- Syiah Kuala University, Darussalam, Banda Aceh, Indonesia
Bibliografia
- [1] Cebi, S., Akyüz, E., and Sahin, Y. 2017. Developing webbased decision support system for evaluation occupational risks at shipyards. doi: 10.21278/brod68102.
- [2] Demirel, H., Balin, A., Celik, E., and alarçin, F. 2018. A Fuzzy Ahp and Electre Method for Selecting Stabilizing Device in Ship Industry. Brodogradnja, 69: 61–77. doi: 10.21278/brod69304.
- [3] Dharma, A. A. A. 2013. Network planning on ship erection blocks to increase construction time efficiency (Case Study at PT. Dok and Shipping Surabaya). J.Tek. Engine, 42–51.
- [4] Ekoanindiyo, F. A., and Wedana, Y. A. 2012. Warehouse layout planning using the shared storage method at a plastic factory in Semarang City. Din. Tech. ind.
- [5] Farhum, S. A., Paradhita, L., and Ihsan, Y. N. 2020. Utilization of vessel multi aid (VMA) as a smart fishing technology for small scale fisheries. IOP Conf. Ser. Earth Environ. Sci., 564 (1), 012081. doi: 10.1088/1755‐ 1315/564/1/012081.
- [6] Guze, S., Neumann, T. and Wilczynski P. 2017. Multi‐Criteria Optimisation of Liquid Cargo Transport According to Linguistic Approach to the Route Selection Task. Polish Maritime Research 24 (s1) : 89‐96. doi:10.1515/pomr‐2017‐0026.
- [7] Ibrahim, I. M. 2021. The role of financial performance of indonesia’s banking firms in influencing the rate of stock return. 6 (3).
- [8] Kambase, N. N. 2020. Ship maintenance and repair services in the tema drydock and shipbuilding yard in ghana: some challenges, opportunities and prospects. world j. eng. technol., 8 (3) doi: 10.4236/wjet.2020.83024.
- [9] Mishra, P., and Purohit, R. 2018. Material delivery problems in construction projects: A possible solution. Mater. Today Proc., 5 (2): 6497–6501. doi: 10.1016/j.matpr.2018.01.135.
- [10] Putra, R. D., and Koto, J.. 2015. Production process of traditional ship in Bintan‐Indonesia.
- [11] Rizwan, R., Setiawan, I., Rahimi, S. A. E., Dewiyanti, I., Purnama, N. R., and Arif, M. 2017. Design and construction studies of wooden purse seine vessels at the Lampulo ocean fishing port (PPS), ʺPros. Monday. Nas. USM, 1 (1).
- [12] Rizwan, T. 2020. Study of the clustering of the wooden shipbuilding industry based on the size of fishing vessels in Banda Aceh and Aceh Besar using the Analytical Hierarchy Process (AHP) method. Depik, 9 (2). doi: 10.13170/depik.9.2.17356.
- [13] Rizwan, T., Jalil, Z., Akhyar, A., and Husaini, H. 2021. Oceanographic factors as the indicators for shipyard industry development in Kutaraja fishing port: a preliminary study. J. Ecol. Eng., 22 (9): 237–245. doi: 10.12911/22998993/141556.
- [14] Rizwan, T., Hikmah, D., Muhammad, M., Chaliluddin, M. A., Akhyar, A., and Thaib, R. 2022. A study on the development of a fishing shipyard in Peukan Bada District, Aceh Besar using fishbone analysis: A short comunnication. Depik, 11 (2). doi: 10.13170/depik.11.2.27236.
- [15] Rizwan, T., Husaini, H., Husin, H., Akhyar, A., and Jalil, Z. 2023. Identification shipyard model suitable for kutaraja fishing port in aceh, indonesia. pol. j. environ. stud., 32 (2) : 1755–1766. doi: 10.15244/pjoes/157411.
- [16] Septifani, R., Santoso, I., and Pahlevi, Z. 2018. Analisis risiko produksi frestea menggunakan fuzzy failure mode and effect analysis (fuzzy fmea) dan fuzzy analytical hierarchy process (fuzzy ahp) (studi kasus di PT. coca‐cola bottling indonesia bandung plant). Proc. Natl. Colloq. Res. Community Serv., 2. doi: 10.33019/snppm.v2i0.582.
- [17] Sihaloho, T., and Muna, N. 2010. Study of the economic impact of the establishment of special economic zones, Bul. Science. Commerce R & D., 4 (10). doi: 10.30908/bilp.v4i1.150.
- [18] Sitompul, Y. R. M. B., and Simarmata, V. P. A. 2022. Description of work accident and occupational safety and health activities of paint manufacturing industry PTSU, in West Java 2016‐2017. Int. J. Health Sci. Res., 12 (8) : 280–289. doi: 10.52403/ijhsr.20220837.
- [19] Suciadi, Y. 2013. Selection and evaluation of suppliers at p.t. new hope, east java using the fuzzy analytic hierarchy process method. Calyptra, 2(1).
- [20] Syahputra, F., 2022. Identification of Material Needs for Building Traditional Wooden Ships in Kampung Jawa, City of Banda Aceh. MAHSEER J. Aquatic Sciences. Dan Perikan., 4 (2). doi: 10.55542/mahseer.v4i2.230.
- [21] Tukan, M., Camerling, B., Afifudin, M. T. and Hozairi, H. 2019. Regional feasibility analysis for floating dock construction as an alternative dock in the Maluku Islands using FAHP‐TOPSIS. NJCA Nusant. J.Comput. Its Appl., 4: 116. doi: 10.36564/njca. v4i2.167.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.baztech-a6977372-48a6-4f0d-977a-c46a98debe32