Czasopismo
2015
|
Vol. 15, no. 2
|
516--524
Tytuł artykułu
Autorzy
Wybrane pełne teksty z tego czasopisma
Warianty tytułu
Języki publikacji
Abstrakty
The paper presents the attempts at determining the reasons for the hazardous incidents which threaten the safety of people working on scaffolds, as well as in their vicinity. The article is divided into two parts, the former referring to the information on the accident rate involving scaffoldings as well as the research on the likelihood of the occurrence of perilous situations, the inspection of their technical state and the breaches of the OSH Regulations included. The latter part is devoted to the thorough analysis on the particular stages of the scaffold operation life, the special attention being paid to the practices, errors and failures while designing scaffolding. Moreover, it concerns the selection of the scaffold elements, the assembly and disassembly of scaffolding as well as their usage which can result in an accident or a building collapse. The range of activities that contribute to the decrease in or even the avoidance of risky situations involving scaffolds is hereby presented in conclusions.
Czasopismo
Rocznik
Tom
Strony
516--524
Opis fizyczny
Bibliogr. 25 poz., rys., wykr.
Twórcy
autor
- Lublin University of Technology, Department of Structural Mechanics, Nadbystrzycka 40 str., 20-618 Lublin, Poland, e.blazik@pollub.pl
autor
- Lódź University of Technology, Department of Building Physics and Building Materials, Politechniki 6 str., 90-924 Łódź, Poland, jacek.szer@p.lodz.pl
Bibliografia
- [1] A. Robak, E. Błazik-Borowa, The examples of nontypical scaffolding used for the renovation of historic buildings, Materiały Budowlane 9 (2012) 60–62 (in Polish).
- [2] M. Pieńko, E. Błazik-Borowa, Scaffoldings used to work at height during repairs of industrial facilities, Materiały Budowlane 10 (2012) 58–60 (in Polish).
- [3] S.M. Whitaker, R.J. Graves, M. James, P. McCann, Safety with access scaffolds: development of a prototype decision aid based on accident analysis, Journal of Safety Research 34 (2003) 249–261.
- [4] K.M. Halperin, M. McCann, An evaluation of scaffold safety at construction sites, Journal of Safety Research 35 (2004) 141–150.
- [5] D. Fang, Q. Shenb, S. Wu, G. Liu, A comprehensive framework for assessing and selecting appropriate, scaffolding based on analytic hierarchy process, Journal of Safety Research 34 (2003) 589–596.
- [6] H. Laitinen, M. Marjamäki, K. Päivärinta, The validity of the TR safety observation method on building construction, Accident Analysis and Prevention 31 (1999) 463–472.
- [7] B. Borys-Szopa, Executive Summary of the Chief Labour Inspector's Report on the National Labour Inspectorate's Activity in 2007, 2008 Available from: http://www.pip.gov.pl/ html/en/html/01050007.htm.
- [8] J. Zając, Executive Summary of the Chief Labour Inspector's Report on the National Labour Inspectorate's Activity in 2008, 2009 Available from: http://www.pip.gov.pl/html/en/html/ 01050008.htm.
- [9] J. Zając, Executive Summary of the Chief Labour Inspector's Report on the National Labour Inspectorate's Activity in 2009, 2010 Available from: http://www.pip.gov.pl/html/en/html/ 01050009.htm.
- [10] J. Zając, Executive Summary of the Chief Labour Inspector's Report on the National Labour Inspectorate's Activity in 2010, 2011 Available from: http://www.pip.gov.pl/html/en/html/ 01050010.htm.
- [11] A. Tomczyk, Executive Summary of the Chief Labour Inspector's Report on the National Labour Inspectorate's Activity in 2011, 2012 Available from: http://www.pip.gov.pl/ html/en/html/01050011.htm.
- [12] The Report of the General Office of Building Control, Building Disasters in 2008 Year, 2009 Available from: http://www. gunb.gov.pl (in Polish).
- [13] The Report of the General Office of Building Control, Building Disasters in 2009 Year, 2010 Available from: http://www. gunb.gov.pl (in Polish).
- [14] The Report of the General Office of Building Control, Building Disasters in 2010 Year, 2011 Available from: http://www. gunb.gov.pl (in Polish).
- [15] The Report of the General Office of Building Control, Building Disasters in 2011 Year, 2012 Available from: http://www. gunb.gov.pl (in Polish).
- [16] The Report of the General Office of Building Control, Building Disasters in 2012 Year, 2013 Available from the Internet: http://www.gunb.gov.pl (in Polish).
- [17] The Report of the General Office of Building Control, Building Disasters in 2013 Year, 2014 Available from: http://www. gunb.gov.pl (in Polish).
- [18] Yearbooks of Labour Statistics 2010, Central Statistical Office, Warsaw, 2011, Available from: http://www.stat.gov.pl/gus/ 5840_2175_ENG_HTML.htm.
- [19] Statistical Yearbook of the Regions – Poland 2011, Central Statistical Office, Warsaw, 2011, Available from: http://www. stat.gov.pl/gus/5840_2176_ENG_HTML.htm.
- [20] Regulation of the Minister of Infrastructure of 6.02.2003 on Health and Safety During Construction Work (Dz. U. 2003, Nr 47, Item 401), 2003 (in Polish).
- [21] EN 12810-1 Façade Made of Prefabricated Components – Part 1: Products Specifications, European Committee for Standardization, 2003.
- [22] EN 12810-2 Façade Made of Prefabricated Components – Part 2: Particular Methods of Structural Design, European Committee for Standardization, 2003.
- [23] EN 18211-1 Temporary Works Equipment – Part 1: Scaffolds – Performance Requirements and General Design, European Committee for Standardization, 2003.
- [24] EN 1991-1-4 Eurocode 1: Actions on Structures – Parts 1–4: General Actions – Wind Actions, European Committee for Standardization, 2005.
- [25] D. Gawęcka, P. Kmiecik, The supervision of construction and exploitation of scaffolds as safety guarantor, Przegląd Budowlany 10 (2011) 16–18 (in Polish).
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.baztech-90b8b617-01b7-4198-8d9f-66c169da2e98