Warianty tytułu
Języki publikacji
Abstrakty
Czasopismo
Rocznik
Tom
Strony
42--44
Opis fizyczny
Bibliogr. 10 poz., il.
Twórcy
Bibliografia
- [1] Cheng M. Y., Yang C. Y.: GIS-Based cost estimate integrated with material layout planing. Journal Construction Engineering and Management 127 (4) 2001, 291-299.
- [2] Sun W., Hasell M. J.: Exploring a GIS prototype to improve management of the architektural design, engineering and construction building process, ESRl, Conference 2002, Available at: www.gis.com/library/userconf/proc02/pap0212.
- [3] Zhong D. Zhu H. Li J.: Geographic information system based visual simulation methodology and its application dam construction processes. Journal Construction Engineering and Management 130(5) 2004, 742-750.
- [4] Varghaese K. O'Connor J.T.: Routing large vechicles on industrial construction site, Jornal Construction Engineering and Management 121 (1) 1995, 1-12.
- [5] Cheng M. Y., Chen J. C.: Integrating barcode and GIS for monitoring construction progress, Automation in Construction 14, 2002, 23-33.
- [6] Chen J. C. Li H., Yong L., Kong S. C. W.: Application of integrated GPS and GIS technology for reducing construction waste and improwing construction efficiency, Automation in Construction (14)2005, 323-331.
- [7] Cheng M. Y., O'Connor J.T., ArcSite: Enhanced GIS for construction site layout, Journal Construction Engineering and Management 122 (4) 1996, 329-336.
- [8] Hejducki Z., Rogalska M.: Metody sprzężeń czasowych TCM, Przegląd budowlany 2/2005, 38-45.
- [9] Hegazy Tarek, Elbeltagi E., EvoSite: Evolution based model for site layout planning, Journal of computing in civil engineering/July 1999.
- [10] ArcView GIS 3.2 Reference manual for Window, Environment Science and Research Institute, Redlands, CA. 1996.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.baztech-39a36971-b492-4b1e-8b11-0a139ef1587a