The losses in the power transmission network may increase due to contingency conditions, i.e., contingency analysis is flattering a crucial task for power system scheduling and operation. It is required to forecast the outcome of outages in power system. Contingency may be occurred due to failure of equipment or transmission lines. Single line outage also overloads the other lines, and abrupt voltage drop may cause the outage of other lines. Hence, the contingency analysis plays vital role to handle different system operating conditions. In this paper, n-1 contingency condition is considered to find the impact of shunt capacitor for improvement in voltage profile, where Mi Power package has been used for the conduction of simulation on the considered test network. Voltage Collapse Prediction Index is the method used for finding the optimal placement of shunt capacitor under n-1 contingency. The highest VCPI value indicates the weak bus, therefore, that is the best place for placement of shunt capacitor to improve the voltage profile and reduce the losses. The value of bus voltages, real power losses and real power generation before and after the n-1 transmission line contingency have been examined, where the improvement of voltage profile through optimal location of shunt capacitor has been studied. The usefulness of the shunt capacitor has been verified on 5 bus test system under n-1 contingency condition using MiPower software.
PL
W artykule przestawiono problematykę łagodzenia skutków stanów awaryjnych w systemach przesyłu energii elektrycznej. W przypadku stanów awaryjnych w systemach przesyłowych występują przeciążenia oraz straty mocy w innych częściach systemu. Dlatego bardzo ważna jest analiza awarii które mogą wystąpić podczas eksploatacji systemu przesyłu energii. Często osoby zarządzające systemem przeprowadzają prognozę skutków wyłączenia poszczególnych linii przesyłowych tworzących system przesyłowy. Stan awaryjny w jednej linii wywołuje spadki napięć w innych punktach systemu przesyłowego. W celu łagodzenia skutków awarii, autorzy zaproponowali zastosowanie kondensatora bocznikującego. W celu wyznaczenia najlepszego miejsca podłączenia kondensatora bocznikującego analizowano wskaźnik zapadów napięcia. Obliczenia symulacyjne zostały wykonane w systemie MiPower. Analizowano system złożony z pięciu linii przesyłowych. Przedstawiono i omówiono wybrane wyniki obliczeń symulacyjnych.
Niezawodność czyli prawdopodobieństwo, że akcelerator może pełnić swoje funkcje w określonym czasie w wyznaczonych warunkach, oraz dostępność czyli czas, w którym akcelerator wypełnia swoje zadania to parametry, które w zastosowaniach przemysłowych nabierają podstawowego znaczenia. Wyroby modyfikowane radiacyjnie muszą spełniać wszystkie kryteria przydatności zgodnie z oczekiwaniami rynku, a jednocześnie technologie radiacyjne muszą wykazać się lepszymi wskaźnikami techniczno-ekonomicznymi w porównaniu do konwencjonalnych technologii aktualnie istniejących. Stąd konieczność optymalizacji decyzji inwestycyjnych głównie z uwagi na wysokość kosztów związanych z zakupem akceleratora i jego eksploatacją. Konieczne jest prowadzenie nieustannych wysiłków dla zwiększenia zrozumienia przydatności technologii radiacyjnych, co może być ważnym czynnikiem wzrostu tego przemysłu. W obecnych warunkach współpraca z przemysłem staje się niezbędnym warunkiem inicjowania i rozwijania badań aplikacyjnych niezbędnych przy opracowaniu nowych technologii radiacyjnych.
EN
Reliability that is the probability, that the accelerator can function in the definite time in appointed conditions. Accessibility is the time, in which the accelerator functions properly. Both parameters arę becoming important for industrial facilities exploitation. Products modified by radiation have to fulfill all criteria of usefulness according to market expectations. Radiation technologies have to simultaneously be characterized by better technical and economic ratings in comparison with conventional technologies. Hence the necessity of the optimization of investment decisions related to costs connected with the accelerator purchase and exploitation. The efforts arę necessary for enlargement of the understanding of the radiation processing usefulness what can be the important factor of this industry growth in future. The co-operation with the industry becomes the indispensable condition of initiating and unrolling applied study related to new radiation technologies development.
Jednym z głównych działań eksploatacyjnych przedsiębiorstw wodociągowo-kanalizacyjnych jest ograniczenie do minimum wskaźnika awaryjności. Wysoka liczba awarii sieci przekłada się na wymierne koszty usuwania uszkodzeń czy strat wody, ale również na straty wizerunkowe firmy. Dlatego sporo wysiłku wkładane jest w prace zapobiegające występowaniu awarii.
6
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W jaki sposób zapewnić jak najmniejszą awaryjność systemów zbiorowego zaopatrzenia w wodę, zaliczanych do infrastruktury krytycznej? Problem analizowano w Głubczycach, zwracając uwagę na materiały, z których wykonano rurociągi oraz na technologię robót.
W artykule przedstawiono ocenę ryzyka uszkodzenia napowietrznych linii elektroenergetycznych SN na skutek oddziaływania na te urządzenia wiatru o zmiennych prędkościach. Przedstawiono statystyczną metodę oceny niezawodności obiektów elektroenergetycznych w warunkach zmiennej wytrzymałości obiektu oraz przy zmiennych wartościach narażeń. Na podstawie wieloletnich obserwacji prędkości wiatru oraz awaryjności linii SN wykazano, że wiatr jest czynnikiem powodującym uszkodzenia lub też czynnikiem współodpowiedzialnym za uszkodzenia w co dziesiątej awarii tych urządzeń.
Każdego dnia w wielu gałęziach przemysłu różnego rodzaju procesy produkcyjne wykonywane są przez maszyny i urządzenia wielu typów i rodzajów. Niektóre z nich realizują działania krytyczne z punktu widzenia realizacji strategicznych celów przedsiębiorstw czy nawet państw. Koszty związane z wystąpieniem awarii tego typu maszyn nie są mierzone jedynie kosztem ich naprawy, ale również stratami wywołanymi przestojem produkcji. Predykcja przyszłego stanu maszyn staje się w takim wypadku ważnym elementem strategii eksploatacji.
10
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Zaopatrzenie ludności w wodę przeznaczoną do spożycia przez ludzi stanowi podstawowy element funkcjonowania gminy, będąc jednocześnie jej zadaniem własnym, które w omawianym przypadku jest realizowane przez przedsiębiorstwo wodociągowe. System zbiorowego zaopatrzenia w wodę, zgodnie z ustawą o zarządzaniu kryzysowym, należy do infrastruktury krytycznej państwa. Najważniejszym elementem tego systemu jest sieć wodociągowa stanowiąca newralgiczny punkt całej infrastruktury krytycznej. Niezbędnym warunkiem dla dostaw wody do odbiorców, zgodnym z polskimi wymogami ustawowymi, jest utrzymanie sprawności i prawidłowe działanie sieci wodociągowej wraz z infrastrukturą towarzyszącą, przy czym sieć wodociągowa musi pracować niezawodnie, zarówno przy minimalnych rozbiorach, jak i w okresach wzmożonego zapotrzebowania na wodę. Prawidłowo, bezawaryjnie funkcjonujący system zapatrzenia w wodę, w tym sieć wodociągowa jest kluczowym elementem budowania systemu bezpieczeństwa zdrowotnego mieszkańców. W artykule przedstawiono analizę czasów eksploatacyjnych (czas pracy bezuszkodzeniowej i czas odnowy) sieci wodociągowej w gminie Głubczyce w aspekcie bezpieczeństwa funkcjonowania infrastruktury krytycznej.
EN
Management of delivering water intendent for human consumption is essential element of the functioning of the municipality as an independent territorial unit, being at the same time its own task, which in the discussed case is carried out by the water supply company. The collective water supply system, according to the Act on crisis management, belongs to the belong to the country's critical infrastructure. The most important element of the water supply system is the water pipe network, which is crucial point of the completely critical infrastructure. A necessary condition for supplying drinking water to consumers, in accordance with Polish law requirements, is maintaining the efficiency and proper operation of the water pipe network together with the accompanying infrastructure, and the water pipe network must operate reliably both at minimum consumption and during periods of increased water demand. Properly, failure-free functioning of water pipelines is a key element of building a health safety system for residents. The article presents an analysis of operating times (time between failure and downtime) of the water supply network in the municipality of Glubczyce in the aspect of security of critical infrastructure functioning.
Udział awaryjności kotłów w blokach energetycznych jest największy spośród wszystkich pozostałych urządzeń układu. W przypadku układów gazowo-parowych, kotły odzysknicowe HRSG odznaczają się mniejszą awaryjnością, gdyż są pozbawione wielu dodatkowych instalacji (układy podawania paliwa, odprowadzania produktów spalania itd.), ponadto pracują w środowisku spalin powstałych w wyniku spalania gazu, co również wpływa pozytywnie na ich eksploatację. Pomimo wszystko, z uwagi na swą konstrukcję (wiele połączeń spawanych, duże zagęszczenie powierzchni ogrzewalnych, dwa układy ciśnienia pary) w pierwszym etapie eksploatacji, również ulegają uszkodzeniom charakterystycznym dla kotłów odzysknicowych. W artykule przedstawiono niektóre przykłady dotyczące uszkodzeń powstałych w początkowej fazie eksploatacji, których źródłem głównie były szeroko pojęte błędy montażowo-wykonawcze. Ponadto zaprezentowano analizę przyczyn uszkodzeń (Root Cause Analysis) połączenia komora-króciec, powstałych w pierwszych miesiącach pracy kotła odzysknicowego, wraz z określeniem przyczyny bezpośredniej (mechanizm niszczenia metalu) i pośredniej (warunki i źródło powstawania procesu niszczenia). W wyniku tej analizy zaproponowano zalecenia do wykonania zmian konstrukcyjnych, które spowodowałyby zmniejszenie oddziaływania zidentyfikowanego procesu niszczenia i zwiększenie niezawodności kotła.
EN
Participation of boilers in failures of power units is the biggest one from among all the equipment composing the boiler system. In case of GTCC units, HR boilers are characterized by lower breakdown rate as they are devoid of many additional installations (fuel feeding systems, discharging of combustion produ etc.) and they work in an environment of flue gases resulting from gas combustion that has also a positive influence on their operation. Despite all that, due their construction (many welded joints, high density of heating surfaces, two steam pressure systems) at the first stage of operation they are also susceptible to damages typical for recovery boilers. Presented are here some examples concerning damages arising in the initial phase of operation resulting mainly from the broadly-defined errors made during manufacture and assembly. Moreover, given Is the analysis of damage causes (Root Cause Analysis) of a chamber-connector pipe joint arising in the first months of the recovery boiler operation together with identification of the root cause (metal degradation mechanism) and the indirect one (conditions and sources because of which the degradation process arises). As a aresult of this analysis proposed are recommendations concerning carrying out of design changes which would cause reduction of the impact of the identified degradation process and increase in the boiler reliability.
Transformatory energetyczne SN/nn są podstawowymi elementami systemu dystrybucji energii elektrycznej. Ich właściwości niezawodnościowe w znacznej mierze wpływają na jakość i niezawodność dostaw energii. Ze względu na brak aktualnych badań w tym zakresie autor przeprowadził obszerne badania niezawodnościowe dotyczące awaryjności transformatorów dystrybucyjnych SN/nn na terenie dużej spółki dystrybucyjnej energii elektrycznej w kraju. W artykule przedstawiona została analiza awaryjności transformatorów zainstalowanych w sieci średniego napięcia. Ze względu na odmienne warunki eksploatacyjne analizie poddano niezależnie transformatory eksploatowane w stacjach wnętrzowych oraz w stacjach napowietrznych (słupowych). Wyznaczone zostały modele niezawodnościowe czasu trwania odnowy transformatorów, czasu trwania wyłączeń awaryjnych, czasu przerw w zasilaniu, a także ilości energii elektrycznej niedostarczonej do odbiorców. Przeprowadzona została również, analiza sezonowości oraz przyczyn awarii transformatorów. W sposób szczególny został uwzględniony wpływ temperatury otoczenia na awaryjność tych urządzeń.
W artykule przedstawiono metodę dwuparametrowej oceny betonu w posadzce na grubości całej warstwy konstrukcyjnej, co umożliwi eliminowanie wadliwych posadzek przed oddaniem ich do użytkowania i podejmowanie działań zaradczych eliminujących opisaną wadliwość.
W artykule przedstawiono analizę czasów trwania zakłóceń z wyszczególnieniem awarii całkowitych i częściowych a także analizę ograniczeń mocy wynikających z awarii częściowych w bloku energetycznym spalającym biomasę. Analiza obejmuje wszystkie zakłócenia i wyłączenia bloku od początku jego eksploatacji, a więc w okresie ostatnich 6-ciu lat. Obliczenia wykonano na podstawie próby statystycznej obejmującej około 500 zdarzeń. Na podstawie zebranych danych empirycznych przeprowadzono analizę rozkładów statystycznych czasów trwania zakłóceń i ograniczeń mocy a także wyznaczono rozkłady teoretyczne, których poprawność została zweryfikowana testem zgodności λ Kołmogorowa.
EN
The article presents the analysis of failure duration with detailed description of total and partial failures as well as the analysis of power limitations resulting from partial failures in the biomass burning power unit. The analysis covers all failures and shutdowns of the block from the beginning of its operation, ie during the last 6 years. The calculations were based on a statistical sample of approximately 500 failures. Based on the collected empirical data, the analysis of statistical distributions of failure times and power limitations was performed, and theoretical distributions, whose validity was verified by Kolmogorov's λ compatibility test, were determined.
17
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule przedstawiono wyniki statystycznej analizy awaryjności napowietrznych oraz kablowych linii elektroenergetycznych średniego napięcia eksploatowanych w krajowych spółkach dystrybucyjnych. Zaprezentowano statystyki awaryjności linii elektroenergetycznych z 15 lat pracy sieci. Przedstawiono przyczyny awarii oraz sezonową zmienność częstości uszkodzeń. Dokonano analizy czasu trwania odnowy, czasu trwania przerw w zasilaniu odbiorców oraz ilości energii elektrycznej niedostarczonej do odbiorców w wyniku awarii. Wyznaczono niezawodnościowe wskaźniki eksploatacyjne linii, a także podjęto próbę identyfikacji modelu probabilistycznego rozkładu gęstości prawdopodobieństwa analizowanych parametrów. Porównano właściwości linii napowietrznych wykonanych przewodami gołymi, linii niepełnoizolowanych, a także linii kablowych. Przeprowadzona analiza miała na celu wskazanie rozwiązania technicznego linii, które jest najkorzystniejsze z punktu widzenia ciągłości zasilania odbiorców energią elektryczną.
EN
The article presents the results of statistical analysis of the failure of overhead and cable medium voltage power lines operated in domestic distribution companies. The statistics of failure of power lines with 15 years of network operation are presented. The causes of failures and seasonal variability of damage frequency were presented. An analysis was made of the duration of renewal, duration of power supply interruptions and the value of electricity not delivered to customers as a result of a breakdown. Reliable line operation indicators were determined, and an attempt was made to identify the probability density distribution of the analyzed parameters. The properties of overhead lines made with bare wires, noninsulated lines as well as cable lines were compared. The analysis carried out was aimed at indicating the technical solution of the line, which is the most advantageous from the point of view of electricity supply continuity for consumers.
The aim of the study was an cause and effect analysis of water losses in the collective water supply system of the city located in south-eastern Poland. The exploitation data provided by the water supply company from 2012-2016 was used for the analysis. The study uses the recommendations of the IWA (International Water Association) for the water balance making and determination of water loss indicators. The values of water loss indicators were compared to international standards and the technical condition of the network was determined. In addition, failure rate analysis of the water supply network was performed based on the failure rate index λ. Based on the performed analysis, it was found that the water supply company should consider renovation or replacement of the main network pipelines to increase the safety level of water supply, reduce the amount of water losses and the company exploitation costs.
PL
Celem pracy jest analiza przyczynowo-skutkowa strat wody w systemie zbiorowego zaopatrzenia w wodę na przykładzie miasta położonego w południowo-wschodniej Polsce. Analizę wykonano w oparciu o dane eksploatacyjne udostępnione przez przedsiębiorstwo wodociągowe z lat 2012-2016. W pracy wykorzystano zalecenia IWA (International Water Association) dotyczące określania bilansu wody oraz wyznaczania wskaźników strat wody. Otrzymane wartości wskaźników strat wody poddano ocenie wg kryteriów międzynarodowych i określono stan techniczny sieci. Ponadto przeprowadzono analizę awaryjności sieci wodociągowej w oparciu o wskaźnik intensywności uszkodzeń λ. Na podstawie analizy stwierdzono, że przedsiębiorstwo powinno rozważyć renowację lub wymianę przewodów sieci magistralnej w celu poprawy bezpieczeństwa dostaw wody, ograniczenia strat wody oraz kosztów funkcjonowania przedsiębiorstwa.
One of the basic subsystems of the collective water supply system is the water distribution subsystem which has a direct impact on the reliability and safety of water supply to consumers. Failures of water pipes may cause water losses (leaks), interruptions in the water supply to consumers and can be the cause of secondary water pollution in the water supply network. It was proposed to use Bayesian inference to locate failures on the water supply network and to determine a posteriori probability of water network failure. It was found that the conditional probability of distribution water supply network failure is definitely higher than the conditional probability of home connections failure. The research results should be used by the water supply company during the development of an operational strategy for the renovation and modernization of the water supply network.
PL
Jednym z podstawowych podsystemów systemu zbiorowego zaopatrzenia w wodę jest podsystem dystrybucji wody, który ma bezpośredni wpływ na niezawodność i bezpieczeństwo dostawy wody do odbiorców. Awarie przewodów wodociągowych mogą powodować zarówno straty wody (wycieki), przerwy w jej dostawie do konsumentów oraz mogą być przyczyną wtórnego zanieczyszczenia wody w sieci wodociągowej. W pracy zaproponowano wykorzystanie wnioskowania bayesowskiego do lokalizacji awarii na sieci wodociągowej oraz do wyznaczenia prawdopodobieństwa „a posteriori” uszkodzenia danego rodzaju sieci. Stwierdzono, że prawdopodobieństwo warunkowe uszkodzenia przewodów rozdzielczych jest zdecydowanie wyższe niż prawdopodobieństwo warunkowe uszkodzenia podłączeń domowych. Wyniki badań powinny zostać wykorzystane przez przedsiębiorstwo wodociągowe podczas opracowywania strategii eksploatacyjnej dotyczącej renowacji oraz modernizacji sieci wodociągowej.
20
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Analiza awaryjności sieci wodociągowych oraz strat wody powinna być podstawą do podejmowania przez przedsiębiorstwa wodociągowe działań związanych z modernizacją sieci. Prawidłowo wykonaną analizę wielkości strat wody w sieci wodociągowej należy przeprowadzać dla odrębnych stref opomiarowania, porównując wielkość dopływów i odpływów wody ze strefy z wodą zafakturowaną. W niniejszym artykule przedstawiono przykład oceny stanu eksploatacyjnego wybranej sieci wodociągowej, z uwzględnieniem zarówno kwestii awaryjności, jak i strat wody. Przeprowadzona analiza została wykonana dla sieci wodociągowej traktowanej jako całość, mimo jej funkcjonującego podziału na strefy. W świetle uzyskanych wyników można stwierdzić, że brak rozdzielenia na strefy opomiarowania mógł rzutować na mylną interpretację stanu technicznego sieci, a tym samym utrudnić właściwe zaplanowanie prac modernizacyjnych i remontowych sieci.
EN
Analysis of water distribution network failure and water losses should be a basis for water supply companies to undertake activities related to network modernization. Water losses analysis should be conducted for District Meter Areas (DMAs) by comparing inflows and outflows from the area with billed water. In the paper the water network operating conditions were assessed basing on the case study and taking both failure rate and water losses into consideration. The analysis was conducted for the whole network, even though the network operates as divided into 2 zones. Based on the obtained results, it can be claimed that disregard of existing zones could cause the misinterpretation of the network operating conditions and hence impede the proper planning the network modernization and renovation.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.