EN
Maintenance issues in mines are particularly important due to the type and complexity of equipment in operation or working in hostile (even extreme) conditions. In this context, the need to ensure continuous/regular maintenance of machinery, identify potential hazards and ensure operational safety seems to be a challenge. Moreover, selecting an appropriate maintenance method is crucial for a mine, both economically and in technical/organizational terms. This study aims to present the preliminary results of diagnostic tests for pumps performing operational tasks in a mine shaft dewatering system. In addition, this study focused on a detailed discussion of the basic elements of the mine shaft dewatering system and the technical objects studied. A preliminary operational test plan for the investigated pumps operating in the mine shaft dewatering system is also presented. This enabled a discussion of the results obtained from the tests of the first quarter of 2023. The tests used three basic diagnostic methods: vibration analysis, thermal imaging and acoustic testing. Potential directions for further research in the analyzed area were also indicated.
PL
Problematyka utrzymania ruchu w kopalniach jest szczególnie istotna ze względu na typ i złożoność eksploatowanych urządzeń czy pracę w nieprzyjaznych (wręcz ekstremalnych) warunkach operacyjnych. Wyzwaniem w tym kontekście jest konieczność zapewnienia ciągłych/regularnych napraw maszyn, identyfikacji potencjalnych zagrożeń oraz zapewnienia bezpieczeństwa pracy. W tym kontekście, dobór odpowiedniej metody utrzymania ruchu ma kluczowe znaczenie dla kopalni, zarówno w kontekście ekonomicznym jak i techniczno-organizacyjnym. Celem pracy jest więc przedstawienie wstępnych wyników badań diagnostycznych przeprowadzonych dla pomp realizujących zadania operacyjne w systemie odwodnienia szybu kopalni. W ramach realizacji celu pracy skupiono się na szczegółowym omówieniu podstawowych elementów systemu odwodnienia szybu kopalni oraz badanych obiektów technicznych. Przedstawiono również wstępny plan badań eksploatacyjnych dla badanych pomp, funkcjonujących w systemie odwodnienia szybu kopalni. Pozwoliło to na omówienie uzyskanych wyników badań, przeprowadzonych w pierwszym kwartale 2023 roku. Badania zostały opracowane z wykorzystaniem trzech podstawowych metod diagnostycznych: analizy drgań, termowizji oraz badań akustycznych. Wskazano również potencjalne kierunki dalszych prac badawczych w analizowanym obszarze.
EN
The article concerns the planned modernization of the power supply system for special transport equipment in the Regis shaft in the scope of building the electricity processing and storage system. In order to improve the safety of people in the underground excavations, the mine plans to install a system enabling emergency power supply for the lifts in the event of a power outage. At the same time, the mine started works related to the development of a photovoltaic power plant, which in the future will make it possible to store energy in periods when the costs of electricity from the power supply network are high and to draw energy stored in this way when electricity costs are low. Energy storage is a key factor in integrating renewable energy into the power generation system and optimizing electricity consumption.
PL
Artykuł przedstawia planowaną modernizację urządzeń transportu specjalnego w szybie Regis w zakresie zabudowy systemu przetwarzania i magazynowania energii elektrycznej.
EN
Due to rheological properties of salt rock mass, maintenance of mine excavations, including shafts may be very challenging, especially in the long term. Many different ideas and approaches to a subject of sinking and maintaining a shaft in salt rock mass have emerged over the years, of which the main directions include two opposite ideas, such as an application of high-strength lining and an approach based on flexible lining. The article presents a shaft reaming machine designed for maintenance of mine shafts located in salt rock mass designed with a flexible shaft lining approach.
PL
Artykuł omawia modernizację stacji wentylatorów głównych szybu Wilson w KS „Wieliczka” S.A., która objęła: budynek stacji, wentylatory główne, silniki elektryczne o mocy 110 kW do napędu wentylatorów, transformatory 3/0,4 kV, rozdzielnię 3 kV „Wilson”, rozdzielnię główną 0,4 kV oraz systemy komunikacyjne do sterowania stacją.
EN
The article concerns the modernization of the main ventilators station of the „Wilson" shaft at „Wieliczka" Salt Mine. The modernization included: the station building, main ventilators, 110 kW electric motors for the operation of ventilators, 3/0.4 kV transformers, 3 kV „Wilson" switching station, 0.4 kV main switching station and communication systems to control the station. The modernization of the Wilson shaft ventilators station has provided a modern facility that improves the safety of tourist and sanatorium traffic as well as employees staying in the underground workings of the mine. Thanks to the development of modern devices, the mine meets the requirements of restrictive environmental standards in terms of the permissible noise level. As regards the modernization of the main ventilators stations, devices with Iower electricity consumption were used -which translates into limitations in the amount of electricity bills. Another aspect that reduces costs is the use of automated devices, which in the long run will completely eliminate the station of the device service.
EN
A level of mine safety is related directly to the condition of its shafts. Thus regular monitoring and maintenance of shaft lining and equipment is vital. However such works are always hard and dangerous, as they are conducted from conveyances. Working platforms are a significant improvement in case of emergency shaft works. However, they need some extremely precious time for assembly. An idea of pull out working platform combines safety and convenience of typical working platform with short time of its installation. Following work presents the idea and construction of the mobile working platform unit, which is a solution for improvement of shaft works conducted from the compartment of the conveyance, as the platform uses cage for transport and operation.
EN
High values of salt rock mass convergence might cause serious problems with maintenance of shaft lining located in salt rock sections. The most efficient existing method of negative convergence influence prevention is periodic removal of creeping salt from shaft walls. However, the process of salt removal is problematic in terms of shaft and hoisting system typical operation. A new shaft lining idea allows removal of creeping salt by leaching without the need for stopping the shaft operation. Following paper presents a software, developed in LabVIEW environment and applied in the framework of test facility, designed for purpose of verification of theoretical assumptions of new construction of shaft lining. Developed software consists of applications for data acquisition, based on Event-Driven Queued State Machine pattern, and data processing, designed as Producer-Consumer pattern.
EN
This article discusses the modernization of the “Wilson” shaft’s main fan station in KS “Wieliczka” S.A., which included: the station building, main fans, the 110 kW electric motors to drive the fans, 3/0.4 kV transformers, 3 kV “Wilson” switchgear, 0.4 kV main switchgear and the communication systems used to control the station.
PL
Artykuł omawia modernizację stacji wentylatorów głównych szybu „Wilson” w KS „Wieliczka” S.A., która objęła: budynek stacji, wentylatory główne, silniki elektryczne o mocy 110 kW do napędu wentylatorów, transformatory 3/0,4 kV, rozdzielnię 3 kV „Wilson”, rozdzielnię główną 0,4 kV oraz systemy komunikacyjne do sterowania stacją.
PL
Artykuł omawia modernizację stacji wentylatorów głównych szybu „Wilson” w KS „Wieliczka” S.A., która objęła: budynek stacji, wentylatory główne, silniki elektryczne o mocy 110 kW do napędu wentylatorów, transformatory 3/0,4 kV, rozdzielnię 3 kV „Wilson”, rozdzielnię główną 0,4 kV oraz systemy komunikacyjne do sterowania stacją.
EN
This article discusses the modernization of the “Wilson” shaft’s main fan station in KS “Wieliczka” S.A., which included: the station building, main fans, the 110 kW electric motors to drive the fans, 3/0.4 kV transformers, 3 kV “Wilson” switchgear, 0.4 kV main switchgear and the communication systems used to control the station.
PL
W artykule przedstawiono nowatorskie rozwiązania obejmujące transport osób i materiałów oraz możliwości zastosowania platform szybowych do prac w wyrobisku pionowym – szybie. Istotą zagadnienia jest zastosowanie urządzeń transportowych specjalnych – urządzeń dźwignicowych pozwalających na realizację układu transportu i prac szybowych. Dokonano oceny innowacyjności stosowanych rozwiązań. Przedstawione rozwiązania przyczyniły się do zmniejszenia energochłonności procesu, poprawy bezpieczeństwa oraz komfortu pracy załogi.
EN
The paper presents innovative solutions for the transportation of people and materials, as well as the possibility of using shaft platforms for vertical works at a mining shaft. The essence of the issue is the use of special transportation equipment – lifting devices which allow for the completion of the transportation system and shaft works. An assessment of the innovativeness of the solutions being applied is presented. These solutions contributed to reducing the energy consumption of the process, as well as improving safety and comfort of the crew.
PL
W referacie zaprezentowano przewoźną maszynę wyciągową B-1200/M/AC-2m/s, produkcji MWM Elektro Sp. z o. o., umożliwiającą szybkie i swobodne jej przemieszczanie między obsługiwanymi szybami. Przedstawiono opis techniczny maszyny wyciągowej, jak i wymagania przepisów ruchu drogowego, z którymi musieli się zmierzyć konstruktorzy przewoźnej maszyny wyciągowej podczas jej projektowania.
EN
This elaboration presents a mobile hoisting machine B-1200/M/AC-2m/s produced by MWM Elektro Sp. with o. o. allowing quick and free movement between serviced shafts. There are presents the technical description of hoisting machine and the restrictions required by the traffic rules with which the constructors of the mobile winding machine had to face.
PL
W artykule przedstawiono nowatorskie rozwiązania obejmujące transport osób i materiałów oraz możliwości zastosowania platform szybowych do prac w wyrobisku pionowym – szybie. Istotą zagadnienia jest zastosowanie urządzeń transportowych specjalnych – urządzeń dźwignicowych pozwalających na realizację układu transportu i prac szybowych. Dokonano oceny innowacyjności stosowanych rozwiązań. Przedstawione rozwiązania przyczyniły się do zmniejszenia energochłonności procesu, poprawy bezpieczeństwa oraz komfortu pracy załogi.
EN
The paper presents innovative solutions for the transportation of people and materials, as well as the possibility of using shaft platforms for vertical works at a mining shaft. The essence of the issue is the use of special transportation equipment – lifting devices which allow for the completion of the transportation system and shaft works. An assessment of the innovativeness of the solutions being applied is presented. These solutions contributed to reducing the energy consumption of the process, as well as improving safety and comfort of the crew.
PL
Przepisy zawarte w Rozporządzeniu Ministra Spraw Wewnętrznych i Administracji z dnia 14 czerwca 2002 r. w sprawie zagrożeń naturalnych w zakładach górniczych wraz z późniejszymi zmianami nie uwzględniają specyficznej konstrukcji szybów. Odpowiednia klasyfikacja szybów jest niezbędna ze względu na występowanie w nich potencjalnych inicjałów, które mogą spowodować wybuch pyłu węglowego. Rozporządzenie Ministra Środowiska z dnia 29 stycznia 2013 r. w sprawie zagrożeń naturalnych w zakładach górniczych wprowadza kryteria klasyfikacji zagrożenia wybuchem pyłu węglowego w wyrobiskach pionowych oraz w wyrobiskach pochyłych o nachyleniu powyżej 45°, w tym w szybach i szybikach. Klasyfikację ww. wyrobisk będzie się dokonywać w oparciu o: –zawartość części niepalnych stałych w zalegającym pyle kopalnianym, – średnią ilość pyłu węglowego zalegającego w danym wyrobisku w przeliczeniu na 1 m3 wyrobiska, – klasyfikacje pod względem zagrożenia wybuchem pyłu węglowego oraz wielkość intensywności osiadania pyłu w wyrobiskach mających bezpośredni kontakt z rozpatrywanym wyrobiskiem, – ocenę zagrożenia wybuchem pyłów w budynku nadszybia – w przypadku klasyfikacji szybów.
EN
The rules included in the Regulation of the Minister for Internal Affairs and Administration dated 14 June 2012 on Natural Hazards in Mining with later changes do not take into account the specific construction of mineshafts. The proper classification of shafts is necessary because of the occurrence of potential initials in the shafts which can cause explosion of coal dust. Regulation of the Minister for Environment dated 29 January 2013 on Natural Hazards in Mining introduces the criteria of the evaluation of danger of coal dust explosion in vertical excavations and in sloped excavations of the gradient of 45 degrees including mineshafts and winze. The division of the above mentioned excavations will be made on the basis of: - content of the fixed non-flammable parts in the residual mine dust, - the average amount of the residual coal dust in the particular excavation calculated per one cubic meter of this excavation, - classification in terms of the danger of coal dust explosion and the size of intensity of dust subsidence in excavations which have direct contact with the considered excavation, - the evaluation of the danger of dust explosion in the building of the headroom - in case of excavations’ classification. The new Regulation of the Minister for Environment dated 29 January 2013 will create the division of vertical excavations and sloped excavations of the gradient of 45 degrees, including mineshafts and winze, into those which are and those which are not at risk of coal dust explosion if at least one of the three conditions specified in the above mentioned Regulation, will be fulfilled. For many years the problem of danger of coal dust explosion in mineshafts is dealt by the Department of Anti-Aerosol Threats of the Experimental Mine “Barbara” owned by the Central Mining Institute which conducted the necessary research, developed and described the methods of charging mining dust samples into mineshafts.
EN
Underground mining exploitation creates damage in surface building structure and in underground constructions as well. For this reason, many mining companies gave up carrying out excavations in safety pillar shafts. Currently, the situation on the market is changing. The continuous increase in excavation depth combined with an increase in exploitation costs resulted in many mining companies trying to find cheaper solutions. One of the methods is to carry out partial exploitations inside safety pillar shafts. Such exploitation is much cheaper than ordinary, because it decreases the exploitations depth, the length of transportation drifts, etc. The functionality of the shaft and its infrastructure have to be fulfil. The authors present a methodology for calculating the effects of mining on mine shafts using geometric integral methods. The paper presents the assumption of the first method developed by Bals (1939), a method based on the so-called Professor Knothe Theory (1951) and the German method of Ruhrkohle (Ehrhardt and Sauer 1961). Based on these methods, operational planning rules are given for mining in protective pillars during coal bed exploitation; additionally, the dimensioning method for shaft pillars is specified. Presented solutions are illustrated with examples from mining practice, where the continuous miner system was planned in the direct area of the mining shaft.
PL
W artykule przedstawiono metodykę obliczania wpływów eksploatacji górniczej na szyby kopalniane z zastosowaniem metod geometryczno-całkowych. Przedstawiono założenia pierwszej metody opracowanej przez Balsa (1931–1932) oraz szczegółowo metodę opartą na tzw. teorii prof. Knothego (1951), a także niemiecką metodę Ruhrkohle (Ehrhardt i Sauer 1961). Opierając się na tych metodach podano zasady planowania eksploatacji w filarach ochronnych szybów przy eksploatacji złóż pokładowych oraz sposób wymiarowania filarów szybowych. Rozwiązania te zilustrowano przykładem z praktyki górniczej.
EN
Purpose: The aim of the research presented in this paper was to determine the impact of voids behind the lining on shaft stability. Methods: This paper presents an example of extending the FLAC3D with the possibility of the simulation of concrete detachment and separation under specific conditions by means of a developed FISH routine. Results: The appearance of voids and cavities behind the lining has been repeatedly observed in active shafts in Polish coal mines and can lead to the emergence of tensile forces in the lining. The study included 366 models of shafts using the rock mass properties of typical shale stone, coal, and sandstone found in the Upper Silesian Coal. Practical implications: The presented concrete spalling algorithm may be used, especially, for the stability evaluation of locally damaged shaft lining or when there is a suspicion of void behind the lining. Originality/ value: An important limitation of all continuous methods is the inability (except when using some additional tools) to simulate the rotations of predefined elements (blocks) and their separation from the rest of the object. The concrete spalling algo-rithm presented extends the capabilities of FLAC3D with the possibility of simulating the detachment and separation of destroyed lining fragments.
15
Content available remote Metodyka oceny stanu elementów konstrukcji zbrojenia szybowego
PL
Badania zużycia i ocena stanu technicznego zbrojenia szybowego w praktyce opierają się głównie na pomiarach grubości elementów. Ich realizacja generuje szereg problemów, zarówno wykonawczych, jak i informacyjnych, w tym trudną do oszacowania niepewność wyniku rozpoznania. Stąd podjęto poszukiwania nowych rozwiązań diagnostycznych. Istotą proponowanego rozwiązania są badania właściwości dynamicznych konstrukcji z wykorzystaniem testu impulsowego, polegającego na pobudzeniu elementu badanej konstrukcji zbrojenia szybowego do drgań i pomiarze odpowiedzi na wymuszenie. Mając na uwadze trudności, jakie generują uwarunkowania realizacyjne związane z niestacjonarnościami pomiarowymi, autorzy przedstawili nowe ujęcie wykonawcze testu impulsowego. Jest ono związane z algorytmem przetwarzania sygnałów pomiarowych, za pomocą transformaty falkowej Fouriera. Umożliwia on obliczenie widma częstotliwościowego ze zdekomponowanego za pomocą analizy falkowej sygnału pomiarowego. W pracy pokazano jego użyteczność diagnostyczną.
EN
Wear tests and technical state assessment of mine shaft reinforcement practically base on element thickness measurement. That generates a number of problems, both practical and informational, including hard to estimate uncertainty of assessment. Hence, new diagnostic solutions are researched. The idea of the proposed solution is construction dynamics measurement by means of impulse test, where the element of the construction under test is excited to vibrate and its response is measured. Concerning practical difficulties related to nonstationarity of the measured signals authors present new approach. It uses image processing algorithm based on wavelet-Fourier transform, which allows frequency spectrum calculation from a measured signal decomposed by a wavelet transform. The paper presents its diagnostic usefulness.
PL
W artykule przedstawiono wybrane techniki i urządzenia pomiarowe wspomagające prace geodezyjne prowadzone na podstawowych obiektach zakładów górniczych. Zaproponowane rozwiązania zostały opracowane w Głównym Instytucie Górnictwa i są obecnie stosowane w górnictwie. Przedstawiono także specjalistyczne urządzenia pomiarowe, w tym laserowe czujniki, wskaźniki i sondy stosowane w nowoczesnych pomiarach i kontroli urządzeń wyciągowych szybów górniczych i innych obiektów zakładów górniczych.
EN
In this paper, chosen techniques and measuring devices were presented supporting geodetic works for essential mine objects. Proposed solutions were developed in Central Mining Institute and are presently applied in mining. Specialist measuring devices were also presented including laser sensors, indicators and probes used in modern measurements and control of hoisting devices of mine shafts and other mine objects.
PL
W artykule dokonano przeglądu stosowanych w Zakładzie Technologii Eksploatacji i Obudów Górniczych Głównego Instytutu Górnictwa sposobów określania wytrzymałości obudowy szybowej, na podstawie badań nieniszczących (metoda sklerometryczna, ultradźwiękowa), półniszczących (metoda "pull-off) oraz niszczących (badanie próbek pobranych bezpośrednio z obudowy szybowej). Bardziej szczegółowo opisano metodę sprzężoną, pozwalającą na dokładniejsze określenie wytrzymałości na ściskanie betonu oraz cegły z użyciem metod nieniszczących (sklerometrycznej, ultradźwiękowej). Wyniki badań wykorzystano do opracowania nowego wzoru na obliczanie wytrzymałości na ściskanie z uwzględnieniem liczby odbić młotka Schmidta oraz prędkości fal ultradźwiękowych. Przedstawiono także metodykę prowadzenia pomiarów wraz z przykładowymi wynikami badań (Bock i in. 2005).
EN
In this paper, a review was done of methods of strength tests of mine shaft support used in the Department of Extraction Technologies and Mining Support of Central Mining Institute on a basis of non-destructive testing (sclerometric method, ultrasonic method), semi-destructive ("pull-off method) and destructive (tests of samples taken directly from a shaft support). An associated method was described more specifically, enabling determining a compression strength of concrete and bricks with higher precision by the non-destructive methods (sclerometric, ultrasonic). The tests results were used for developing a new formula for calculation of compressive strength taking into account a number of Schmidt hammer rebounds and a velocity of ultrasonic waves. The methodology of tests conducting, together with examples of tests results were presented (Bock et al. 2005).
18
Content available remote Wpływ sposobu likwidacji szybu na zagrożenie powierzchni w jego otoczeniu
PL
Drugiego stycznia 2000 r. około godziny 9 na osiedlu mieszkaniowym w Bochum (Niemcy) powstało zapadlisko, którego krater szybko się powiększał, osiągając ostateczną szerokość dochodząca do 15 m i głębokość około 20 m. Kolejne zapadlisko podobnych rozmiarów powstało następnej nocy około godziny 3, kilka metrów dalej na wschód, pochłaniając garaż, wysokie drzewa i krzewy ozdobne. W wyniku szybko przeprowadzonych badań i konsultacji ustalono, że zapadliska powstały obok zlikwidowanego szybu IV, zamkniętej w 1906 r. kopalni węgla kamiennego "Vereinigte Maria Anna und Steinbank". Zapadliska zastabilizowano wypełniając je mieszaninami betonopodobnymi. Równolegle do prac zabezpieczających rozpoczęto badania mające na celu wyjaśnienie przyczyn powstania zapadlisk. W badaniach uwzględniono wszystkie naturalne geologiczne i antropogeniczne czynniki, mogące mieć wpływ na stateczność górotworu w otoczeniu zlikwidowanych szybów. Artykuł prezentuje wyniki tych badań.
EN
After finishing mine operations, all galleries and shafts lining cannot be continually controlled by the mining teams. In such cases the problem of mine's long-term stability in condition of the dynamic geological and others processes is very difficult for description. From the land owner point of view surface destruction hazard is very important. The results of some underground process can be observed at the surface even dozens or hundreds of the years. Very interesting results of the observations and protection works around closed down in 1906 year mining shaft "Wattensheid" in Bochum (Germany) has been shown in the paper. In some day of the year 2000 two very large craters were created at the surface near the forgotten shaft even in the years of 1980 some protection injections has been done. Example presented in the paper should be a warning for all designers of shaft liquidation and post-mining land owners.
PL
Na podstawie badań zawartości jonów chlorkowych i siarczanowych oznaczonych w wyciekach Kopalni Soli "Wieliczka" w okresie kilkudziesięciu lat policzono wskaźniki siarczanowości. Analiza zmienności tych trzech cech została przeprowadzona na podstawie współczynników korelacji i ich wzajemnych relacji. Najczęściej obserwowaną zależnością jest spadek wartości wskaźnika siarczanowości, który może być spowodowany malejącą zawartością jonów siarczanowych, a także zawartości jonów chlorkowych. Wśród podzielonych, w zależności od wartości współczynników korelacji, wycieków najliczniejszy zbiór stanowiły dopływy, dla których zmienność rozpuszczania halitu nie ma większego wpływu na rozpuszczalność minerałów siarczanowych. Wartości współczynników korelacji dla wskaźnika siarczanowości i zawartości jonów siarczanowych są prawie równe. Przesłanką zagrożenia wodnego może być większa wartość bezwzględna dla zmienności współczynnika siarczanowości niż dla jonów siarczanowych. Może to nastąpić w sytuacji, gdy strefa siarczanowa została rozługowana i na skutek tego postępuje rozługowanie złoża solnego
EN
The content of Cl- i SO2-/4 in "Wieliczka" Salt Mine leaks from several dozen years were used in the calculation of hydrochemical sulphate indicators. Analysis of chemical changes vs. time of these three elements was based on the value of correlation indexes and their relation to each other. The most often observed dependence is a decrease in the sulphate indicator value. Decrease in sulphate content coinciding with an increase in chloride content may cause these changes. Wieliczka waters were classified based on the hydrochemical index value. In the leaks with the greatest number the changes in dissolution of halite and sulphate minerals were not related to each other. For these leaks the value of the index of the sulphate indicator and value of the sulphate content are almost the same. Larger absolute values of the sulphate indicator changes compared to sulphate content may point to a growing danger to the saline water deposits. This may take place when a sulphate zone has been dissolved and due to this, the dissolution of the salt deposit continues
20
PL
10 czerwca 2005 r., podczas Dni Politechniki Wrocławskiej w KGHM Polska Miedź SA, prezes Zarządu Przedsiębiorstwa Budowy Kopalń PeBeKa SA Jerzy Głód złożył oficjalny meldunek o zakończeniu głębienia szybu R-XI w kopalni KGHM Polska Miedź Oddział ZG Rudna. Budowa tego obiektu z uwagi na złożone warunki geologiczno-górnicze oraz zakres i różnorodność zadań należała do najbardziej skomplikowanych prac inżynieryjnych.