EN
Thermophysical properties of frozen soil have a great influence on the quality of cast-in-place concrete piles. In this paper, the embedded concrete temperature monitoring system is used to test the variation law of the concrete temperature during the construction of the bored pile. Thermophysical properties of permafrost around piles are tested. Based on the theory of three-phase unsteady heat conduction of soil, the influence of specific heat capacity, thermal conductivity, thermal diffusivity, and latent heat of phase transformation on the temperature change of a concrete pile is systematically studied. The thermal parameter is obtained which exerts the most significant influence on the temperature field. According to the influence degree of frozen soil on pile temperature, the order from high to low is thermal conductivity, thermal diffusivity, latent heat of phase change, and specific heat capacity. The changes in pile wall temperature caused by the change of these properties range between 2.60–10.97◦C, 1.49– 9.39◦C, 2.16–2.36◦C, and 0.24–3.45◦C, respectively. The change percentages of parameters vary between 35.77–47.12%, 12.22–40.20%, 12.46–32.25%, and 3.83–20.31%, respectively. Therefore, when designing and constructing concrete foundation piles, the influence of the thermal conductivity of frozen soil on concrete pile temperature should be considered first. The differences between the simulated and measured temperature along the concrete pile in the frozen soil varying with the respective thermal properties are: –2.99– 7.98◦C, –1.89–4.99◦C, –1.20–1.99◦C, and –1.76–1.27◦C. Polyurethane foam and other materials with small thermal conductivity can be added around the pile to achieve pile insulation.
2
Content available remote Posadowienie wysokiego budynku na prefabrykowanych palach wbijanych
PL
Wybrany przypadek dotyczy budynku wielokondygnacyjnego, posadowionego bezpośrednio przy erozyjnym brzegu rzeki. Wykonawca fundamentów zrealizował zamienny, własny projekt: posadowienie na 230 wbijanych prefabrykowanych palach żelbetowych. Płytę ułożono na głębokości 0,7 m p.p.t. Po wbiciu 76 pali stwierdzono w trzech rzędach przemieszczenia poziome głowic pali w kierunku rzeki, które początkowo wynosiły ok. 20 cm i zwiększyły się do 50 cm. Przedstawiony przykład posadowienia na palach wbijanych, mimo dobrego geotechnicznego i geologiczno-inżynierskiego rozpoznania podłoża [3, 7], wskazuje, że w złożonych warunkach gruntowych należy analizować ostateczny projekt w zespole profesjonalistów, w tym doświadczonego geotechnika [1].
EN
The many-tiered building is located on the low terrace, directly next to the erosive bank of the river. Nonetheless, the constructor of the foundations realized a different project: deep foundation on prefabricated 230 concrete pales. The plate was placed at the depth of 0,7 m. After driving the first 76 pales, horizontal displacements of the pale head towards the river in first three rows were observed. The shifts increased from initially 20 cm to 50 cm. Geotechnical analysis [3, 7] revealed that the reason for the displacements may be disturbance of steady state, caused by activation of quasi soil wedge and its displacement along with the pales in the direction of the river [1].
3
Content available remote Innowacyjne urządzenie do obróbki głów pali
EN
Work is aimed at designing and implementing the innovative device for pile head trimming. This very first device of this type created in Poland is meant to work with reinforced concrete piles with 300–400 mm diameter and will be mounted on excavator's arm. Studies were set due to high demand of automation of piles heads trimming. The pile head trimming work consists of crushing a concrete part from a pile to required height and the reinforcement bars should remain untreated. These days this work is laborious and consists of many operations. Also huge problem is the hazard of injury of participating workers. Because there are many piles on construction site and each of them need the same treatment, the device, which can handle this job efficiently and safely, is required. Users of the device will be construction companies. Some of them have already notified the demand of using the device.
PL
Doświadczenie z wielu budów, gdzie stopy pali były zagłębione w warstwę gruntu o wysokiej wytrzymałości, wskazuje, że wbicie pali na rzędną założoną w projekcie nie zawsze jest możliwe. Przedstawiono metodę analizy wbijalności pali prefabrykowanych na podstawie wyników sondowań statycznych CPT. Proponowane podejście pozwala zarówno na analizę wbijalności pali pojedynczych, jak i wpływu pali wbitych w grunt na możliwość zagłębienia kolejnego pala.
EN
Experience gathered on many sites shows that if the pile toe is embedded in hard soils, it is often impossible to drive them to the designed level. A method allowing driveability prediction of precast piles based on the results of CPT tests. The method allows prediction of a single pile driveability but also the influence of group of piles can be taken into account.
5
Content available remote Prędkości fali akustycznej w młodym betonie pali fundamentowych
PL
Prezentowane badania stanowią podstawę do oszacowania w warunkach polowych prędkości fali akustycznej w fazie wiązania betonu C20/25 między 5 a 12 dniem od betonowania. W niniejszym artykule przedstawiono wyniki, jakie otrzymano z badań polowych kolumn betonowych z przedziału między 5. a 12. dniem od ich zabetonowania.
EN
Standard procedures of analysing the length and continuity of piles require applying a specifi c method of the pile head preparation and obtaining the ultimate resistance of the piles. However, the pressure exerted by contractors often results in the need to speed up the analyses. Each time it requires the calibration of the elastic wave velocity in the pile depending on the applied concrete. The analyses presented in the work provide the basis for estimating the acoustic wave velocity in in-situ conditions in the phase of C20/25 concrete setting between the 5th and 12th day after concreting.
PL
Wykorzystując program metody elementów skończonych ABAOUS ver. 6.5 do badania pali fundamentowych w gruncie, zweryfikowano modele materiałowe Mohra-Coulomba i Druckera-Pragera oraz modele zmodyfikowane, uwzględniające stowarzyszone prawo płynięcia. Wyniki obliczeń porównano z analitycznym rozwiązaniem normowym stosowanym w praktyce inżynierskiej.
EN
In order to use ABAQUS ver. 6.5 finite element code to analyze the response of the concrete piles in soil, constitutive models verification was carried out. Calculations considered Mohr-Coulomb and Drucker-Prager dilatant and nondilatant models for soil. The results of this computation were compared with analytical engineering solution.
first rewind previous Strona / 1 next fast forward last