W artykule przedstawiono wnioski z analiz zagrożeń, awarii i katastrof konstrukcji budowlanych, które wystąpiły w latach 1962-2020 oraz rolę rzeczoznawców budowlanych w ich usuwaniu. Skuteczne zapobieganie zagrożeniom, awariom i katastrofom budowlanym jest możliwe wtedy, gdy znane są pełne dane o obiektach, w których one wystąpiły oraz gdy znane są ich przyczyny. W tym celu praktycznie we wszystkich państwach gromadzone są i analizowane informacje o zagrożeniach, awariach i katastrofach budowlanych.
EN
The article presents conclusions from the analysis of hazards, failures and catastrophes of building structures that occurred in the years 1962-2020 and the role of construction experts in their removal. Effective prevention of threats, failures and construction disasters is possible when full data about the facilities where they have occurred and their causes are known. For this purpose, information on hazards, failures and construction disasters is collected and analyzed in practically all countries.
2
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Wykonywanie kolumn sztywnych w gruntach o małej wytrzymałości na ścinanie wymaga zachowania wysokich standardów począwszy od badań geologicznych (w tym badań in situ), przez projektowanie i kontrolę wykonawstwa. Kluczowa jest również interpretacja wyników badań, m.in. FVT i CPTU, ponieważ obie metody zakładają korzystanie ze współczynników korelacyjnych szacowanych na podstawie lokalnych doświadczeń. W artykule omówiono poszczególne działania, jakie należy podjąć przy projektowaniu i kontroli wykonywania robót ziemnych, wzmocnienia podłoża oraz późniejszych robót budowlanych.
EN
Execution of rigid inclusions in soils with low shear strength requires keeping high standards, starting from soil investigation (including in-situ testing), design and excecution control. The interpretation of soil investigation i.e. FVT and CPTU tests is also crucial, because both methods consists of using coefficients estimated on the basis of local experience. The article presents the steps that should be taken in proper designing and supervision of earthworks, the execution of rigid inclusions and execution of following construction works.
4
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule przedstawiono analizę przyczyn uszkodzeń żelbetowej płyty stropodachu, wykonanej na zabytkowej baterii pieców koksowniczych. Wskutek rażących błędów projektowych i wykonawczych płyta zarysowała się na całej powierzchni. Przyjęte na etapie projektowania założenia nie spełniały podstawowych zasad i wymagań norm dotyczących tego typu konstrukcji. Błędy projektowe w trakcie budowy zostały spotęgowane wadami wykonawczymi. Próby iniekcji rys, jako docelowa naprawa płyty stropodachu, nie zostały zaakceptowane przez inwestora.
EN
In the paper there is presented the analysis for causes of defects occurred for the reinforced concrete flat roof slab constructed on a historic battery of coke ovens. Due to glaring design and executional mistakes the slab was subjected to cracking over the entire surface. The assumptions made at the design stage did not satisfy the basic codes requirements and rules for design of such type of structure. Design errors were intensified by execution defects made while constructing the object. Attempts to inject cracks were not accepted by the investor as the ultimate repair method for the flat roof slab.
5
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule podjęto temat awarii i katastrof budowlanych powstałych w trakcie prowadzenia robót remontowych oraz związanych z przebudową obiektów budowlanych. Opisano dwa przypadki awarii i katastrofy budowlanej, z powodu wadliwej technologii i organizacji robót budowlanych. Pierwszy przypadek dotyczy katastrofy podczas robót budowlanych związanych z przebudową budynku typu LIPSK. Drugi przypadek to pożar poszycia dachowego wywołany wadliwą organizacją remontu dachu, użytkowanego wielorodzinnego budynku mieszkalnego. Opisano sytuacje i okoliczności powstania zdarzeń, skrócone wyniki prowadzonych badań oraz zalecone postępowania naprawcze. Celem publikacji jest przedstawienie znaczenia planowania i organizacji robót przy ich późniejszej realizacji oraz wskazanie realnych konsekwencji ignorancji tego, często niedocenianego, aspektu wykonawstwa budowlanego w obszarze robót remontowych.
EN
The article deals with the subject of construction failure and disaster arising during the course of renovation and reconstruction works of construction facilities. Two cases of failure and building catastrophe arising from faulty technology and organisation of construction works are described. The first case concerns a construction disaster occurring during construction works related to the reconstruction of a LIPSK-type building. The second case is a roof sheathing fire caused by faulty organisation of roof repairs, of a multi-family residential building in use. The study of both cases describes the situation and circumstances of the incident, the summary results of the investigations carried out and the remedial procedures recommended. The aim of the publication is to present the importance of planning and organisation of works in their subsequent execution and to point out the real consequences of ignoring this, often underestimated, aspect of construction workmanship in the area of repair works.
6
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule przedstawiono wybrane rodzaje błędów realizacyjnych występujących w stalowych konstrukcjach prętowych oraz wskazano metody ich naprawy. Pracę wykonano na podstawie materiałów zebranych w trakcie przeglądów technicznych użytkowanych budynków, których konstrukcje nie wykazywały żadnych oznak awarii. Na wstępie przedstawiono krótki zarys historii budowy obiektów użyteczności publicznej o stalowych konstrukcjach nośnych, w szczególności o ustrojach strukturalnych. Następnie na przykładach omówiono wybrane błędy i nieprawidłowości występujące w konstrukcjach tego typu obiektów oraz przedstawiono możliwe rozwiązania naprawcze. W podsumowaniu sformułowano wnioski z poczynionych obserwacji, wskazano na generalne przyczyny i skutki występowania tego typu nieprawidłowości i błędów w konstrukcjach, a także konsekwencje takiego stanu rzeczy dla użytkownika obiektu.
EN
The article presents selected types of implementation errors occurring in steel bar structures and indicates the methods of their repair. This work is based on materials collected during technical inspections of the facilities which did now show any signs of failure. At the beginning, a brief outline of the history of the construction of public utility buildings with steel load-bearing structures, in particular structural systems, is presented. Then, on the basis of examples, selected errors and irregularities occurring in the structures of this type of objects were discussed and possible repair solutions were presented. In the summary, conclusions from the observations were formulated, the general causes and effects of this type of irregularities and errors in structures were indicated, as well as the consequences of such a situation for the facility's user.
Istotną rolą inżynierów budownictwa jest diagnostyka i utrzymanie obiektów już istniejących. Szereg problemów pojawiających się w obiektach budowlanych spowodowany jest błędami powstałymi na etapie projektowania i wykonawstwa lub niewłaściwej eksploatacji. Występowanie różnego typu usterek wymaga szczegółowej diagnostyki przyczyn oraz przedstawienia rozwiązań mających na celu ich usunięcie oraz propozycję napraw już występujących uszkodzeń. W niniejszym artykule autorzy przedstawili kilka przykładów usterek występujących w budynkach mieszkalnych, spowodowanych błędami projektowymi lub wykonawczymi. Usterki te dotyczyły zarówno zagadnień związanych z konstrukcją obiektów, jak i niekorzystnymi zjawiskami z zakresu fizyki budowli. Zaprezentowano też zastosowane metody usunięcia usterek i naprawy uszkodzeń.
EN
An important role of civil engineers is diagnostics and maintenance of existing facilities. A number of problems appearing in building structures are caused by errors arising at the stage of design and execution or improper operation. The occurrence of various types of faults requires detailed diagnosis of the causes and presentation of solutions aimed at their removal and a proposal to repair the already existing faults. In this article, the authors present a few examples of failures in residential buildings caused by design or construction errors. These defects concerned both issues related to the construction of objects and unfavorable phenomena in the field of building physics. The methods of removing faults and repairing damages were also presented.
W pracy omówiono przypadki oddziaływania geotechnicznego na zabudowę sąsiednią. Poprzez analizę omówionych przypadków wskazano na konieczność przeprowadzania każdorazowo oceny wpływów powstających obiektów na zabudowę sąsiednią. Wykazano, że konieczność ta wynika bezpośrednio z pakietu norm dotyczących zagadnień związanych z niezawodnością obiektów budowlanych w czasie całego okresu życia, tj. jego przygotowania, realizacji i eksploatacji, aż po jego rozbiórkę włącznie. Wykazano, że konieczne jest różnicowanie poziomu niezbędnej niezawodności obiektu budowlanego, prowadzące do równowagi pomiędzy konsekwencjami zniszczenia obiektu z wysokością koniecznych nakładów finansowych, również tych, które prowadzą do zabezpieczenia interesu i mienia osób trzecich znajdujących się w strefie wpływów (geotechnicznych S, wpływów drgań parasejsmicznych, wpływów oddziaływania akustycznego i innych). Wykazano konieczność prowadzenia monitoringu geodezyjnego, drganiowego i innego. Brak profesjonalizmu i ignorancja wymagań podanych w EC7 [1,2,3] to nadal obraz z naszego rynku budowlanego.
EN
The paper discusses cases of geotechnical impact on the neighboring buildings. Through the analysis of the discussed cases, it was indicated that it is necessary to assess the impact of the constructed objects on the neighboring buildings each time. It has been shown that this necessity results directly from the package of standards concerning issues related to the reliability of building objects during the entire life cycle, i.e. its preparation, implementation and operation, up to and including its demolition. It has been shown that it is necessary to differentiate the level of the necessary reliability of a building, leading to a balance between the consequences of the destruction of the structure from the amount of necessary financial outlays, including those that lead to securing the interests and property of third parties located in the zone of influence (geotechnical S, paraseismic, influences of acoustic impact and others). The need for geodetic, vibration and other monitoring was demonstrated. The lack of professionalism and ignorance of the requirements given in EC7 [1,2,3] is still an image from our construction market.
Zaletą stosowania deskowań systemowych jest unifikacja ich podzespołów, przekładająca się na wzrost wydajności pracy. Właściwie dobrane ich rozwiązanie do statyki i masy deskowanego elementu w sposób znaczący wpływa na efektywność realizacji żelbetowych robót monolitycznych. Z kolei błędne decyzje i założenia dotyczące rozwiązania wzmocnienia formy prowadzą zarówno do zwiększenia kosztów ich dzierżawy, jak również do nieplanowanego wydłużenia czasu realizacji żelbetowych robót monolitycznych. W artykule podjęto problematykę błędów przy realizacji robót żelbetowych monolitycznych na etapie konstrukcji deskowań systemowych. Studium przypadku poparto przykładem awarii ustroju szalunkowego w trakcie betonowania belki żelbetowej.
EN
The advantage of using system formwork is the unification of their components, which translates into an increase in work efficiency. Their proper solution to the statics and weight of the boarded element significantly affects the efficiency of monolithic reinforced concrete works. In turn, wrong decisions and assumptions about the solutions to strengthen the form lead to both to increase the cost of their lease, as well as to the unplanned extension of the duration of monolithic reinforced concrete works. The article deals with the problem of errors in the implementation of monolithic reinforced concrete works at the stage of system formwork construction. The case study is supported by an example of a failure of the formwork system during concreting of a reinforced concrete beam.
Materiały budowlane absorbują kapilarnie wilgoć, gdy mają z nią bezpośrednią styczność. W artykule przedstawiono analizę statyczną mocowania zabezpieczających barier w uszkodzonych loggiach budynków 5-kondygnacyjnych, wykonanych w technologii uprzemysłowionej z elementami technologii tradycyjnej, zrealizowanych w latach osiemdziesiątych XX w. Źle wyprofilowane zabezpieczenie połączenia elementów stalowych balustrad z konstrukcją murową wielokrotnie jest głównym transporterem wody w strukturę muru, a co za tym idzie powoduje pogorszenie parametrów wytrzymałościowych i statycznych zaprojektowanych połączeń. W analizie wytrzymałościowej przedstawiono wykorzystanie programów MES oraz role poprawnie przeprowadzonych badań in situ.
EN
Building materials absorb moisture by capillary action when in direct contact with it. The article presents a static analysis of fastening of protective barriers in damaged logs of 5-storey buildings, made in industrialized technology with elements of traditional technology, implemented in the 1980s. Badly profiled protection of the connection of steel railings with the masonry structure, many times it is the main transport of water into the wall structure and thus causes deterioration of the strength and static parameters of the designed connections. The use of MES programs and the roles of correctly conducted In situ tests were presented in the strength analysis.
14
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Pogarszanie izolacyjności cieplnej na skutek zawilgacania i biodegradacji w przypadku fasad ocieplanych ETICS następuje niejednokrotnie już w pierwszych latach eksploatacji. Przekłada się to na zmniejszenie efektywności energetycznej polskiego budownictwa, w którym ETICS jest dominujący. Prowadzone przeze mnie od prawie trzech dekad badania wskazują, że w wielu przypadkach już w momencie przekazywania budynków do użytkowania nie są spełnione wymagania dotyczące ciepłochronności. W artykule przedstawiono powody występowania wad skutkujących postępującym w czasie zwiększaniem zapotrzebowania na ciepło do ogrzewania. Wzorem wielu europejskich krajów wymagania stawiane elewacjom w zakresie trwałości powinny być doprecyzowane i rozszerzone o odporność na biodegradację. Z inspiracji członków Grupy Roboczej ds. krajowych inteligentnych specjalizacji (KIS 5 Inteligentne i energooszczędne budownictwo) przedstawiono propozycję oczekiwanych zmian prawnych, które mogłyby przynieść wymierne korzyści w poprawie efektywności energetycznej budynków.
EN
The deterioration of thermal insulation due to moisture and biodegradation in the case of ETICS insulated facades often occurs in the first years of operation. This transfers into a reduction in the energy efficiency of the Polish constructions, in which ETICS is dominant. The research carried out by the author for almost three decades shows that in many cases the requirements for thermal insulation are not met already at the moment of handing over the buildings to use. The article presents the reasons for the occurrence of defects resulting in the increasing heat demand for heating over time. Following the example of many European countries, the requirements for façades in terms of durability should be specified and extended to include resistance to biodegradation. Inspired by the members of the Working Group for national smart specializations (KIS 5 Smart and energy-efficient construction), the article presents a proposal for the expected legal changes that could bring tangible benefits in improving the energy efficiency of buildings.
16
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule przedstawiono problematykę występowania imperfekcji strukturalnych złożonych systemów ociepleń ścian zewnętrznych. Analiza ilościowa nieprawidłowości, bazująca na badaniach in situ, którą przeprowadziłem, umożliwiła zaproponowanie klasyfikacji imperfekcji cieplnych systemu ETICS w postaci defektów i dyslokacji cieplnych, także z niekontrolowaną infiltracją powietrza. Znajomość charakterystycznych wielkości, które je opisują, pozwala na powiązanie ich z rzeczywistą izolacyjnością termiczną ścian zewnętrznych.
EN
The article dealsn with the issues related to the occurrence of structural imperfections of complex wall insulation systems. The aim of the work is to determine the influence of ETICS imperfections on the thermal protection condition of external walls. Additionally, a classification of thermal defects and dislocations,which constitute an irregularity in the implementation of ETICS systems, along with uncontrolled air infiltration occurring in selected cases, was proposed. The knowledge of the characteristic quantities describing them allows to correlate them with the actual thermal insulation of external walls.
18
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Podczas pionowania energetycznych słupów z betonu wirowanego w linii średniego napięcia doszło do złamania jednego z nich. Komisja badająca przyczyny zdarzenia stwierdziła, że zastosowana żerdź E15/4,3 była wadliwa. Przeanalizowano sposoby posadowienia słupów energetycznych, sprawdzono nośność przedmiotowej żerdzi oraz poddano oględzinom złamany fragment. Na podstawie analiz stwierdzono, że złamanie żerdzi nastąpiło w wyniku zastosowania błędnej „techniki siłowego” pionowania słupów w linii, a nie wad żerdzi.
EN
During the verticalization of spun concrete power poles on a medium voltage line, one of them broke. The committee investigating the cause of the incident found that the pole E15/4.3 which was used was defective. The methods of foundation of power poles were analysed, the bearing capacity of the pole in question was checked, and the broken fragment was inspected. Based on these analyses, it was found that the pole was broken as a result of the incorrect "force technique" of verticalization the poles in line and not defects of the pole.
20
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule poddano analizie aspekty technologiczne związane z nieodpowiednim wyburzeniem ścian wewnętrznych w budynku wielorodzinnym we Wrocławiu. W wyniku przeprowadzonych robót wyburzeniowych i rozbiórkowych na parterze budynku wielorodzinnego wzniesionego w tradycyjnej technologii murowej uszkodzeniu uległy elementy konstrukcyjne na wyższych kondygnacjach. Po opracowaniu ekspertyzy i wykonanych badaniach ustalono przyczyny uszkodzeń i przeanalizowano stan konstrukcji w następstwie wykonanych robót. Opracowano zalecenia dotyczące naprawy konstrukcji.
EN
The article analyses technological aspects related to inadequate demolition of internal walls in amulti-family building in Wrocław. As a result of demolition and demolition works carried out on the ground floor of amulti-family building erected in traditional brick technology, structural elements on the upper floors were damaged. Following an expert opinion and investigations, the causes of the damage were determined and the condition of the structure following the work carried out was analysed. Recommendations were drawn up for repairing the structure.