Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 11

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
Studying the impact of renewable energy sources planned to be connected to the grid, requires the preparation of expert opinions. The task of this opinion is to verify that there are possibilities enabling the connection of the considered source to the network. Each opinion is required to take into account other facilities and those sources which were previously connected to the grid or connection agreement were signed with them. The need to take into account such a large number of sources contributes to potential thermal overloads of high-voltage lines. Sometimes these overloads are insignificant, but in certain situations it turns out that their occurrence may be a reason for refusing to sign connection agreements for new sources. According to network operators, their presence may constitute a threat to the operational security of the grid. The article presents the use of the method of tracking active power flows and the DC method of determining power flows to estimate the impact of these sources on thermal overloading of lines. Using of the IEEE-118 test network, selected nodes were analysed where connecting sources might significantly worsen overloads previously observed or would cause new overloads. The proposed approach will enable potential investors to make proper decisions regarding selection of source connection points. Combining the results obtained by both methods at the same time will allow for the indication of appropriate connection nodes for sources from the point of view of minimising the number of overloaded lines and prospective costs of their uprating.
PL
Artykuł przedstawia wybrane problemy związane z pracą sieci dystrybucyjnych przy dużym nasyceniu instalacjami generacji rozproszonej. Identyfikując problemy napięciowe w sieciach SN oraz przeciążeniowe w sieciach 110 kV wskazano sposoby ich rozwiązania uwzgledniające możliwości współczesnych systemów zbierania i przetwarzania danych pomiarowych opisujących stan sieci oraz ich wykorzystanie przez układy automatyki regulacyjnej i systemowej.
EN
The article presents selected problems related to the operation of distribution networks with high saturation with distributed generation. By identifying voltage problems in MV networks and overload problems in 110 kV networks, ways of solving them were indicated, taking into account the capabilities of modern systems for collecting and processing measurement data describing the state of the network and their use by control and protection systems.
3
EN
The risk of emergencies in power grids may result in the need to repeatedly curtail the power generated from renewable energy sources (RES). The frequency of network emergency states occurring during the year can be determined based on available failure rate statistics. The power redispatch signal (this term means reducing generation in a renewable energy source and correspondingly increasing it in a centrally controlled source) may be issued by the appropriate network operator. The article presents the results of analyses, the aim of which was to assess the probable effects of annual generation reduction in a selected wind and photovoltaic power plant connected at the same grid node. An original method was proposed using Monte Carlo simulation, taking into account the generation technology and its annual distribution, and an external computational "engine" implementing sequences of flow calculations.
PL
Ryzyko wystąpienia stanów awaryjnych w sieciach elektroenergetycznych może spowodować konieczność wielokrotnego ograniczania mocy generowanej w odnawialnych źródłach energii (OZE). Częstość występowania stanów awaryjnych sieci w ciągu roku, można określić na podstawie dostępnych statystyk. Sygnał do redysponowania mocy (termin ten oznacza zmniejszenia generacji w źródle OZE i odpowiednie zwiększenie jej w źródle centralnie sterowanym) może wydać właściwy operator sieci. W artykule przedstawiono wyniki analiz, których celem była ocena prawdopodobnych skutków rocznego ograniczania generacji w wybranej elektrowni wiatrowej i fotowoltaicznej, przyłączonych w tym samym węźle sieci. Zaproponowano oryginalną metodę wykorzystującą symulację Monte Carlo uwzględniającą technologię generacji i jej roczny rozkład oraz zewnętrzny „silnik” obliczeniowy realizujący sekwencje obliczeń rozpływowych.
PL
Ryzyko wystąpienia stanów awaryjnych w sieciach elektroenergetycznych może spowodować konieczność wielokrotnego ograniczania mocy generowanej w odnawialnych źródłach energii (OZE). Częstość występowania stanów awaryjnych sieci w ciągu roku, można określić na podstawie dostępnych statystyk. Sygnał do redysponowania mocy (termin ten oznacza zmniejszenia generacji w źródle OZE i odpowiednie zwiększenie jej w źródle centralnie sterowanym) może wydać właściwy operator sieci. W artykule przedstawiono wyniki analiz, których celem była ocena prawdopodobnych skutków rocznego ograniczania generacji w wybranej elektrowni wiatrowej i fotowoltaicznej, przyłączonych w tym samym węźle sieci. Zaproponowano oryginalną metodę wykorzystującą symulację Monte Carlo uwzględniającą technologię generacji i jej roczny rozkład oraz zewnętrzny „silnik” obliczeniowy realizujący sekwencje obliczeń rozpływowych.
EN
The risk of emergencies in power grids may result in the need to repeatedly curtail the power generated from renewable energy sources (RES). The frequency of network emergency states occurring during the year can be determined based on available failure rate statistics. The power redispatch signal (this term means reducing generation in a renewable energy source and correspondingly increasing it in a centrally controlled source) may be issued by the appropriate network operator. The article presents the results of analyses, the aim of which was to assess the probable effects of annual generation reduction in a selected wind and photovoltaic power plant connected at the same grid node. An original method was proposed using Monte Carlo simulation, taking into account the generation technology and its annual distribution, and an external computational "engine" implementing sequences of flow calculations.
PL
Wzrost cen energii elektrycznej, rozwój generacji rozproszonej oraz konieczność ograniczenia emisji CO2 sprawia, że należy rozważać stopniowe instalowanie źródeł fotowoltaicznych (PV) na budynkach użyteczności publicznej. Trend ten obserwowany w Europie Zachodniej zaczyna również być widoczny w Polsce. Jest to spowodowane dostępnością na budynkach i wokół nich powierzchni dostosowanych do montażu instalacji PV oraz bliskością odbiorów energii. Sieci elektroenergetyczne niskiego napięcia w miastach ze względu na ich budowę cechuje duża niezawodność. Struktura tych sieci dostosowana jest do stopnia zurbanizowania danego obszaru. Sieci te, szczególnie w nowobudowanych osiedlach, charakteryzują się dostateczną przepustowością kabli, krótszymi długościami poszczególnych obwodów oraz zapasem mocy w stacjach SN/nn. Artykuł ma za zadanie zaprezentowanie na przykładzie wybranego osiedla mieszkaniowego możliwości rozwoju instalacji PV w warunkach miejskich. Jest również próbą oceny ich wpływu na sieć nn, a także próbą wskazania korzyści i zagrożeń wynikających ze współpracy źródeł fotowoltaicznych z siecią miejską.
EN
Electricity price increase, development of distributed generation and the need to reduce CO2 emission mean that the gradual installation of photovoltaic sources (PVs) on public buildings should be considered. This trend observed in Western Europe can also be seen in Poland. This is facilitated by the availability on buildings and around them of surfaces adapted to the installation of PV sources and the proximity of energy consumers. Low-voltage power networks in urban areas, due to their structure, are characterized by high reliability. The structure of these networks is adapted to the degree of urbanization of the area. These networks, especially in newly built housing estates, are characterized by sufficient capacity of selected cables, shorter lengths of circuits and a reserve of installed power in the MV/LV substations. The article aims to present, on the example of a selected housing estate, the possibility of developing a PV installations in urban conditions. It is also an attempt to assess their impact on the LV network, as well as to indicate the benefits and threats resulting from the cooperation of photovoltaic sources with the urban network.
PL
Aspekt ekonomiczny w branży elektroenergetycznej stanowi jedno z ważniejszych zagadnień. Zauważalne jest ciągłe dążenie do redukcji i optymalizacji kosztów związanych z wytwarzaniem, przesyłem oraz dystrybucją energii elektrycznej. W artykule przedstawiono jeden z możliwych sposobów redukcji kosztów dystrybucji energii elektrycznej, polegający na zastosowaniu optymalizacji konfiguracji sieci dystrybucyjnej. Badania przeprowadzono na zmodyfikowanym fragmencie rzeczywistej sieci dystrybucyjnej współpracującej z odnawialnymi źródłami energii.
EN
The economic aspect in the power industry is one of the most important issues. It is noticeable that there is a constant desire to reduce and optimize the costs associated with the generation, transmission and distribution of electricity. The article presents one of the possible ways of reducing the costs of electricity distribution, consisting in the optimization of the distribution network configuration. The research was carried out on a modified part of the actual distribution network cooperating with renewable energy sources.
EN
Many industrial customers are considering investing in photovoltaic installations, which is facilitated by the large roof spaces of the factory halls and the importance of the value of electricity in production costs. Proper use of funds supporting investments in RES and appropriate selection of PV installation capacity allows to maximise the economic effects of invested funds. The paper presents a method of adjusting the power of photovoltaic installations to the needs of industrial plants on the basis of analysis of annual variations in electricity demand.
PL
Wielu odbiorców przemysłowych rozważa inwestycję w instalacje fotowoltaiczne – sprzyjają temu rozległe przestrzenia dachów hal fabrycznych oraz istotne znaczenie wartości energii elektrycznej dla obniżenia kosztów produkcji. Właściwe wykorzystanie środków wspierających inwestycje w OZE oraz odpowiedni dobór mocy instalacji PV pozwala na maksymalizację efektów ekonomicznych zainwestowanych środków. W artykule przedstawiono metodę dopasowania mocy instalacji fotowoltaicznych do potrzeb zakładów przemysłowych na podstawie analizy rocznych przebiegów zmienności zapotrzebowania na energię elektryczną.
EN
An increasing number of connected prosumer installations, mainly photovoltaic ones, can cause problems with the operation of lowvoltage networks such as voltage fluctuations. These problems can be solved by an adequate control of the sources operation within one transformer substation. The article presents a concept of a controller that ensures access to the data that describe the network operating conditions and the energy sources installed there as well as allows control of the micro installations output power.
PL
Coraz większa liczba przyłączanych instalacji prosumenckich, głównie fotowoltaicznych, może być przyczyną występowania problemów w pracy sieci niskiego napięcia, takich jak m.in. wahania napięcia. Problemy te mogą być rozwiązane poprzez odpowiednie sterowanie pracą źródeł w obrębie jednej stacji transformatorowej. W artykule zaprezentowano koncepcję sterownika, który zapewnia dostęp do danych obrazujących warunki pracy sieci i zainstalowanych w niej źródeł energii, jak również umożliwia sterowanie mocą wyjściową mikroinstalacji.
EN
The article presents the consequences of the introduction of EU regulation 2016/631 for power park modules (PPMs), of which wind farms are a typical example. Analysing the yearlong course of changes in the generated power, the possibility of a typical wind farm meeting the requirements for the production and absorption of reactive power was checked. It was shown that in the selected cases it was necessary to introduce additional sources of reactive power on the side of the farm’s MV.
EN
Currently, a dynamic increase can be observed in the number of photovoltaic plants connected to a low voltage grid. The phenomenon of power flow towards a transformer substation may cause the permissible voltage to be exceeded. There are several ways to eliminate the adverse voltage increases. In this article, the authors proposed a method for optimizing the selection of P(U) and Q(U) characteristics of solar plant inverters. The research shows that the use of inverters, for which both characteristics have been activated, allows to master the problem of voltage increase with a small reduction of the micro-plant output.
PL
Obecnie można zaobserwować dynamiczny wzrost liczby instalacji fotowoltaicznych przyłączonych do sieci niskiego napięcia. Zjawisko przepływu mocy w kierunku stacji transformatorowej może spowodować przekroczenie dopuszczalnej wartości napięcia. Wyróżnić można kilka sposobów wyeliminowania niekorzystnych wzrostów napięcia. W artykule autorzy zaproponowali metodę optymalizacji doboru charakterystyk P(U) i Q(U) falowników instalacji fotowoltaicznych. Przeprowadzone badania wskazują, że zastosowanie falowników, dla których uaktywniono obydwie charakterystyki, pozwala na opanowanie problemu wzrostu napięć przy niewielkim ograniczeniu energii produkowanej w mikroinstalacjach.
11
Content available Optimal Control of Wind Power Generation
EN
Power system control is a complex task, which is strongly related to the number and kind of generating units as well as to the applied technologies, such as conventional coal fired power plants or wind and photovoltaic farms. Fast development of wind generation that is considered as unstable generation sets new strong requirements concerning remote control and data hubs cooperating with SCADA systems. Considering specific nature of the wind power generation, the authors analyze the problem of optimal control for wind power generation in farms located over a selected remote-controlled part of the Operator grid under advantageous wind conditions. This article presents an original stepwise method for tracing power flows that makes possible to eliminate current (power) overloading of power grid branches. Its core idea is to consider the discussed problem as an optimization task.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.