The paper evaluates the relationship between the selection of the probability density function and the construction price, and the price of the building's life cycle, in relation to the deterministic cost estimate in terms of the minimum, mean, and maximum. The deterministic cost estimates were made based on the minimum, mean, and maximum prices: labor rates, indirect costs, profit, and the cost of equipment and materials. The net construction prices received were given different probability density distributions based on the minimum, mean, and maximum values. Twelve kinds of probability distributions were used: triangular, normal, lognormal, beta pert, gamma, beta, exponential, Laplace, Cauchy, Gumbel, Rayleigh, and uniform. The results of calculations with the event probability from 5 to 95% were subjected to the statistical comparative analysis. The dependencies between the results of calculations were determined, for which different probability density distributions of price factors were assumed. A certain price level was assigned to specific distributions in 6 groups based on the t-test. It was shown that each of the distributions analyzed is suitable for use, however, it has consequences in the form of a final result. The lowest final price is obtained using the gamma distribution, the highest is obtained by the beta distribution, beta pert, normal, and uniform.
PL
W artykule wykazano związek pomiędzy wyborem funkcji gęstości prawdopodobieństwa a ceną budowy i ceną cyklu życia budynku, w odniesieniu do posiadanego deterministycznego kosztorysu w ujęciu minimalnym, średnim i maksymalnym. Wykonano kosztorysy deterministyczne realizacji inwestycji bazując na cenach minimalnych, średnich i maksymalnych: stawki robocizny, kosztów pośrednich, zysku oraz ceny pracy sprzętu i materiałów. Otrzymanym cenom netto budowy nadawano różne rozkłady gęstości prawdopodobieństwa bazując na wartości minimalnej, średniej i maksymalnej. Wykorzystano 12 rodzajów rozkładów prawdopodobieństwa: trójkątny, normalny, lognormalny, beta pert, gamma, beta, exponential, Laplaca, Cauchy, Gumbel, Rayleigh, uniform. Wyniki obliczeń przy prawdopodobieństwach zdarzenia od 5 do 95 % poddano statystycznej analizie porównawczej. Określono zależności pomiędzy wynikami obliczeń dla których przyjęto rożne rozkłady gęstości prawdopodobieństwa czynników cenotwórczych. Przypisano określonym rozkładom poziom wysokości cen w 6 grupach na podstawie przeprowadzonego testu t-Studenta. Wykazano, że każdy z analizowanych rozkładów nadaje się do stosowania, powoduje to jednak konsekwencje w postaci wyniku końcowego. Najniższą cenę końcową uzyskamy stosując rozkład Gama, najwyższą rozkład Beta, Betapert, Normalny i Uniform.
PL
W artykule przeprowadzono analizę formalną i techniczną wykonania nadbudowy budynków zamieszkania zbiorowego i indywidualnego w aspekcie regulacji zawartych w projekcie Kodeksu Urbanistyczno-Budowlanego. Analiza uwzględnia ustalenia zapisów planu miejscowego, warunków technicznych wykonania i odbioru robót, ograniczeń wynikających z ustaw o ochronie zabytków i środowiskowych. Przedstawiono zapisy wspierające oraz ograniczające wykonywanie nadbudów zawarte w projekcie Kodeksu Urbanistyczno-Budowlanego.
EN
In the article, formal and technical analysis of the construction of the superstructure of the collective and individual residence buildings was carried out in the aspect of regulations included in the draft Urban Planning and Construction Code. An analysis was carried out, taking into account the provisions of the local plan, technical conditions of implementation, restrictions resulting from the acts on the protection of monuments and the environment. The supporting and limiting entries for the superstructures included in the Urban and Construction Code are presented.
3
EN
This paper summarises methods of scheduling construction processes with the use of artificial intelligence methods. Rules used for the calculation are characterised taking into account the implementation of priorities and resource constraints.
PL
W artykule przedstawiono metody harmonogramowanie procesów budowlanych z wykorzystaniem metod sztucznej inteligencji. Scharakteryzowano zasady stosowania obliczeń z uwzględnieniem priorytetów wykonawczych i ograniczeń zasobów.
4
Content available An analysis of the efficiency of design methods
EN
The objective of the paper is to analyze the efficiency of design methods proposed in different codes according to the load carrying capacity of concrete structures. In particular, three standard recommendations have been considered: the ACI 318 shear design model, the equation by Eurocode 2 and a new design procedure from Model Code 2010. In the paper the flexural concrete members, which are reinforced longitudinally but without transverse reinforcement, are considered. The design values of the load carrying capacity of such members obtained from these three codes were compared with experimental results. An advanced statistical analysis has been applied to predict of dependent variable (load carrying capacity of tested beams) and to perform a comparative analysis. On the basis of the analysis conclusions have been drawn according to the fit between the design methods and the test data.
5
PL
W artykule omówiono wyznaczenie wzoru regresyjnego do obliczania współczynnika przewodzenia ciepła λ betonu komórkowego z uwzględnieniem gęstości pozornej, temperatury i wilgotności powietrza otoczenia. Prognozowano, wykorzystując metody regresji wielorakiej i automatycznych sieci neuronowych. Wykonano test Shapiro-Wilka sprawdzający normalność rozkładów. Weryfikację prawidłowości wyznaczonych równań regresji wykonano, obliczając błąd MAPE prognozy oraz analizując szereg resztowy, wyznaczając funkcje autokorelacji i autokorelacji cząstkowych reszt. W celu uzyskania danych przeprowadzono badania laboratoryjne pięciu różnych gęstości betonu komórkowego od 100 do 570 kg/m3 oraz oznaczono wartość współczynnika λ przy zmieniających się warunkach cieplno-wilgotnościowych. Badania wpływu temperatury na wartości współczynnika przewodzenia ciepła wykonano dla czterech zakresów od 0 do 42,5 ºC. Wpływ wilgotności powietrza na wartość współczynnika oznaczono w przypadku pięciu wilgotności od 0 do 90%.
EN
The aim of the study was to determine the regression formula for calculating the thermal conductivity λ cellular concrete with regard to apparent density, temperature and humidity of the ambient air. Methods of automated regression and neural networks were used. Shapiro-Wilk normality checking distributions were made. Verification of the correctness set of regression equations was performed by calculating an error MAPE forecasts and analysis of the residual series, setting the autocorrelation function and partial autocorrelation of residuals. A series of laboratory tests were performed. For five different λ cellular concrete densities of 100 to 570 kg/m3 determined ratio when the changing conditions of the thermo-humidity. Investigation of the effect of temperature on the thermal conductivity was performed for four ranges of 0 to 42.5 °C. Effect of humidity on the coefficient determined for the five humidity of 0 to 90%.
PL
W artykule przedstawiono wyniki pracy, której celem było wyznaczenie wzoru regresyjnego do obliczania rzeczywistego zużycia mieszanki betonowej podczas wykonania ścianek szczelinowych. Zużycie prognozowano, wykorzystując metodę uogólnionych modeli addytywnych z logarytmiczną funkcją wiążącą. Wykonano test Shapiro-Wilka sprawdzający normalność rozkładów, weryfikację prawidłowości wyznaczonego równania regresji wykonano, obliczając błąd MAPE prognozy oraz analizując szereg resztowy, wyznaczając funkcje autokorelacji i autokorelacji cząstkowych reszt. W wyniku obliczeń otrzymano wzór regresyjny pozwalający wyznaczać rzeczywiste zużycie mieszanki betonowej podczas wykonywania ścianek szczelinowych. Na przykładzie realizacji analizowanego obiektu obliczono koszt nieuwzględnienia rzeczywistego zużycia mieszanki betonowej.
EN
In article are presented the results of the work, which has the aim to determine the regression formula for calculating the actual consumption of the concrete mix during the execution of diaphgram walls. Consumption of concrete mix was predicted using the method of generalized additive models with a logarithmic function of binding. Shapiro-Wilk test for normality distributions are made, the verification of the correctness of a designated regression equations were made calculating the forecast MAPE mistake and analyzing a number of the residual, setting the autocorrelation function and partial autocorrelation of residuals. The calculations were obtained regressive formula enabling determination of the actual consumption of the concrete mix during the performance of diaphgram walls. Calculated cost does not take into account the actual consumption of the concrete mix to the embodiment of the analyzed object.
7
Content available remote Metody sprzężeń czasowych w inżynierii przedsięwzięć budowlanych
PL
Celem artykułu było wskazanie kierunków badawczych w inżynierii przedsięwzięć budowlanych z zastosowaniem metod sprzężeń czasowych. Problem badawczy dotyczy optymalizacji cyklu realizacji przedsięwzięć budowlanych, w szczególności poszukiwania metod obliczeniowych uwzględniających ograniczenia technologiczne i organizacyjne w systemach pracy potokowej (flow shop problem). Jako kryteria optymalizacyjne przyjęto minimalizację czasu, kosztów i zasobów oraz inne funkcje celu.
EN
The aim of the article was to point out directions in research about methodology of scheduling construction project management when is applied time couplings method. Science problem is to optimization cycle of construction process, especially to study calculation method using technology and organization restrictions in flow shop problem. Criteria of the optimization were to minimization time, costs and resources and other.
PL
W pracy podjęto próbę prognozowania emisyjności CO2 przez zestaw maszyn koparka i samochód samowyładowczy. Emisyjność dwutlenku węgla maszyn do wykonania określonego zadania roboczego zależy od wydajności maszyn. W etapie pierwszym pracy prognozowano wydajność koparek. Zebrano dane techniczne i organizacyjne mające hipotetyczny wpływ na wydajność koparek takie jak: pojemność łyżki, rodzaj narzędzia roboczego, kategorię gruntu, ładowność środka transportowego, rodzaj drogi dojazdowej, lata pracy operatora, wilgotność gruntu, odległość wywozu gruntu, temperatura powietrza, awaryjność. Zakodowano zmienne lingwistyczne, przekształcono dane tak by uzyskać najlepsze wyniki. Prognozowano wydajność koparek. Wykorzystano metodę prognozowania regresji wielorakiej. Przeprowadzono analizę autokorelacji i autokorelacji cząstkowej reszt oraz analizę wrażliwości. Obliczono błędy MAPE prognoz. Na podstawie otrzymanego modelu prognostycznego wykonano przykład obliczeniowy doboru maszyn w aspekcie emisyjności dwutlenku węgla. Sformułowano wzór obliczeniowy do kwantyfikacji liczby kilogramów dwutlenku węgla powstającego w czasie wykonywania robót ziemnych. Z przeprowadzonych analiz wynika, że kryterium minimalizacji emisji dwutlenku węgla jest wprost proporcjonalne do pojemności łyżki koparki i ładowności środka transportowego.
EN
The article predicted CO2 emission by a set of machines: excavator and dump trucks. The emissivity of carbon dioxide during the execution of a specific work task depends on the performance of the machines. In the first stage, work performance of excavators was projected. The following technical and organisational data having a hypothetical influence on the performance of excavators were collected: bucket capacity, type of working tool, category of land, load capacity of a mean of transport, type of access road, work experience of an operator, humidity of the soil, distance of the soil disposal, air temperature, failure frequency. The linguistic variables were coded, the data was transformed in a way that ensures that the best results were obtained. The method of multiple regression were used for forecasting. Analysis of the autocorrelation and partial autocorrelation residues and sensitivity analysis was done. MAPE errors forecasts were calculated. On the basis of a predictive model, an example of calculation of selection of machines in terms of carbon dioxide emission was made. The calculation formula to quantify the number of kilograms of carbon dioxide produced during earthworks was formulated. Analyses showed that the criterion of minimizing carbon dioxide emissions are directly proportional to the excavator’s bucket capacity and capacity of means of transport.
PL
W artykule przedstawiono kolejne kroki postępowania w przedsięwzięciu polegającym na budowie domu z wykorzystaniem elementów rozbiórkowych z domów z bali drewnianych. Ustalono 31 elementów procesu inwestycyjnego, opisano wymagania prawne oraz szczegóły związane z realizacją. Przeprowadzono również analizę statystyczną mającą na celu ustalenie cen nabycia starego domu z bali. Analizę przeprowadzono na podstawie danych zebranych z aukcji internetowych. Uwzględniano następujące dane: cenę starego domu, cenę 1 m2 domu, województwo, w którym dom jest posadowiony, materiał z którego wykonano połać dachową.
EN
The article shows the next steps to be taken in the project consisting in building a new home using elements of demolition of houses built of wooden beams. It was established 31 elements of the investment process, described legal requirements and details of implementation. Statistical analysis was performed with a view to determine the purchase price of the old log house. The analysis was based on data collected from an online auction. Taken into account the following data: the price of the old house, the price of 1 m2 of the house, state in which the house is built, the material from which made the roof surface.
PL
W artykule przedstawiono metodykę harmonogramowania przedsięwzięć budowlanych realizowanych w systemie potokowym, z zastosowaniem modelu czasowo przestrzennego. Zaproponowano model obliczeniowy czasów realizacji procesów budowlanych z uwzględnieniem zjawiska niepewności danych i ich skutku na przebieg procesu oraz na termin zakończenia zadania inwestycyjnego. Wykorzystuje on pojęcia perspektywy zdarzeń oraz horyzontu czasowego. Podjęto próbę adaptacji modelu matematyczno-fizycznego do szacowania terminów zakończenia budowy.
EN
The paper presents the methods of scheduling construction projects realized according to the pipelined workflow system and with the use of the space-time model. A model of calculating the time of realization of construction projects has been proposed taking into consideration the data uncertainty and its effects on the progress of the process and the date of completion of the investment. It makes use of the concepts of the perspective of events and the time horizon. It also attempts to adapt the mathematic and physical model to the assessment of the time of construction completion.
PL
W artykule podjęto próbę opracowania metodologii obliczeń, na podstawie której będzie można oszacować cenę zakupu powierzchni 1m2 mieszkania na terenie Warszawy z uwzględnieniem preferencji inwestora. Najlepsze rezultaty obliczeniowe osiągnięto stosując metodę uogólnionych modeli addytywnych (GAM). Uzyskano błąd MAPE 2,19%. Analizę wykonano w programie STATISTICA,na podstawie 161 transakcji sprzedaży mieszkań o powierzchni od 26 m2 do 99 m2. Otrzymano wzór regresyjny wyznaczający cenę 1m2mieszkania. Predyktorami równania są : dzielnica, liczba m 2, piętro, dodatkowa powierzchnia, wielkość kuchni, liczba pięter w budynku, cena parkingu podziemnego, cena parkingu naziemnego, odległość od centrum [km], czas dojazdu do centrum komunikacją miejską [min]. Sporządzono arkusz kalkulacyjny w programie EXCEL. Wykonano przykładowe studium przypadku. Przedstawiony wzór regresyjny oraz aplikacja w programie EXCEL mogą ułatwić wybór mieszkania. Proponowany sposób obliczeń pozwala rozważyć wiele alternatywnych rozwiązań i wybrać najbardziej korzystne.
EN
This article attempts to develop a methodology of calculations on the basis of which it will be possible to estimate the purchase price of 1m2of flat in Warsaw, with the preference of the investor. The best results were achieved using the method of computing Generalized Additive Models (GAM). MAPEerror 2,19% was received . The analysis was performed in STATISTICA, on the basis of 161 sales transactions of apartments ranging in size from 26 m2 to 99 m2. Obtained regression model defining the price of 1m2of flat. Predictors of equations are: district, the number of m2, floor, additional space, the size of the kitchen, the number of floors in the building, underground parking price, the price of parking ground, distance from the center [km],the time of journey to the center by public transport [min]. Spreadsheet in EXCEL has been done. Case study has been taken. The presented model regression and application in EXCEL can make the choice of housing easier. The proposed method has the ability to consider many alternatives and choose the most beneficial.
PL
W artykule podjęto próbę znalezienia takiego miernika stanu pogody, który obliczeniowo wykazywałby bardzo wysoką skuteczność prognozowania. Analizowano możliwość wykorzystania wielu danych pogodowych jako zmiennych niezależnych. W wyniku przeprowadzonych obliczeń ogólną metodą drzew klasyfikacyjnych i regresyjnych, metodą uogólnionych modeli addytywnych i regresji wielorakiej, metodą dekompozycji sezonowej, opóźniania szeregów czasowych wytypowano jako najlepszą zmienną temperaturę potencjalną. Dana ta charakteryzuje się tym, że jest wielkością zachowawczą przy zmianach adiabatycznych atmosfery, posiada wyraźnie widoczny trend wielomianowy oraz okresowość danych. Wykazano możliwość prognozowania jej wartości przyszłych z bardzo niewielkim błędem MAPE 0,41%.
EN
Weather conditions have a significant impact on the way the design, construction and maintenance of buildings in Poland. Selection weather independent variables have a significant impact on the quality of prediction of dependent variables related to construction . The ability to use multiple weather data was analyzed. Calculations were performed using the general method of classification and regression trees, generalized additive models and multiple regression method, seasonal decomposition, delaying the time series. Potential temperature were selected as the best variable for forecasting. The potential temperature is conservative with changes in adiabatic atmosphere, has a clearly visible polynomial trend and the periodicity of the data. It has been shown the possibility of forecasting the future value with very little error MAPE= 0.41%. Although not the most popular measure of the weather conditions, has a very high computational efficiency.
PL
W pracy zaprezentowano stanowisko pomiarowe do wyznaczania charakterystyk transformatorów impulsowych. Stanowisko to umożliwia pomiary zarówno charakterystyk amplitudowych i fazowych transformatora, jak i charakterystyk magnesowania rdzenia, a także wyznaczanie sprawności energetycznej transformatora oraz własnych i wzajemnych rezystancji termicznych między uzwojeniami oraz rdzeniem transformatora. Rozważania teoretyczne zilustrowano wynikami pomiarów.
EN
In the paper the measuring set to measure characteristics of pulse transformers is presented. This set makes possible to measure both frequency characteristics of the transformer, magnetization characteristics of the core existing in this transformer, the watt-hour efficiency of the transformer and own and mutual thermal resistance between windings and the core of the transformer. Theoretical considerations were illustrated with results of measurements.
PL
W pracy przedstawiono komputerowy system wspomagający harmonogramowanie przedsięwzięć budowlanych. Dotyczy on montażu kompozytowych belek obiektu mostowego. Aplikacja komputerowa obejmuje moduły: harmonogramowania prac budowlanych, harmonogramowania transportu belek przy montażu konstrukcji mostowych oraz moduł harmonogramowania w warunkach niepewności.
EN
This article describes a computerized system used to support the scheduling of construction projects. It relates to the construction of composite beams in a bridge structure. The computer application includes modules for scheduling of construction works, scheduling of transportation of beams for construction of the bridge structures, and a module for scheduling in conditions of uncertainty.
PL
Celem opracowania algorytmu obliczeń jest umożliwienie doboru zestawu maszyn do robót ziemnych w aspekcie minimalizacji emisyjności CO2. W pracy prognozowano wydajność koparek oraz emisyjność CO2 zestawów maszyn. Wykorzystano metody prognozowania regresji wielorakiej i sieci neuronowych. Przeprowadzono analizę autokorelacji i autokorelacji cząstkowej reszt oraz analizę wrażliwości. Obliczono błędy MAPE prognoz. Na podstawie otrzymanych modeli prognostycznych wykonano przykład obliczeniowy doboru maszyn w aspekcie emisyjności dwutlenku węgla.
EN
The aim of the calculation is to allow the selection of a set of earthmoving machinery in terms of minimizing the emission of CO2. The capacity of excavators and CO2 emission of set of machines was predicted. The forecasting methods: multiple regression and neural networks were used. The analysis of autocorrelation and partial autocorrelation residuals and sensitivity analysis were performed. The MAPE errors of forecasts were calculated. The calculation example in terms of selection of machines emission of carbon dioxide on the basis of forecasting models was performed.
PL
W artykule przedstawiono analizę cen prac projektowych na przykładzie danych rynkowych i obliczeń prognostycznych, dotyczących opracowania dokumentacji hal stalowych o zróżnicowanych wymiarach. Otrzymane wartości porównywano z kosztami prac projektowych proponowanymi przez Stowarzyszenie Architektów Rzeczpospolitej Polskiej (SARP) i zaleceniami prawnymi. Do obliczeń prognostycznych zastosowano program Statistica firmy StatSoft. Do obliczeń wykorzystano metodę GAM (uogólnionych modeli addytywnych).
EN
The article presents the analysis of designing costs , which was based on the market data and prognostic calculations, concerning the preparation of the documentation for steel halls of various sizes. The obtained values were compared to those proposed by the Polish Architects Association and legal guidelines. The StatSoft’s Statistica programme was used for prognostic calculations. The GAM (Generalized Additive Models) method was used for the calculations. The conclusions were formulated on the basis of analysis of results.
PL
W pracy rozpatrujemy problem harmonogramowania przedsięwzięć budowlanych realizowanych w systemie potokowym. Są to bardzo ważne zagadnienia praktyki budowlanej, mające znaczący i bezpośredni wpływ na ostateczne koszty realizacji. Przedstawiamy założenia do harmonogramowania robót, algorytm jego rozwiązywania opartego na metodzie przeszukiwania z tabu (ang. tabu search) oraz jego modyfikację dla przypadku, gdy niepewne są czasy wykonywania prac. Porównujemy stabilność rozwiązań w przypadku, gdy niepewne dane są reprezentowane przez zmienne losowe o rozkładzie normalnym lub liczby rozmyte w trzypunktowej reprezentacji.
EN
This paper deals with some problems of synchronizing construction activities differing in their execution times. The methodology of calculating the times of execution of the activities, ensuring that there will be no collisions between them, is presented. The methodology is illustrated with numerical examples showing the successive steps of the algorithm and it is applied to complex works modelled as the flow shop problem. The tabu search algorithm is adapted to solve the problem.
PL
Artykuł jest częścią pierwszą cyklu „Prognozowanie produkcji budowlano montażowej w województwie dolnośląskim”. Założono, że wynagrodzenie pracowników będzie jedną ze zmiennych niezależnych do wyznaczenia wielkości produkcji. Prognozowano wynagrodzenia pracowników w sektorze budowlanym metodami regresji wielorakiej i metodą autoregresji średniej ruchomej SARIMA. Przeprowadzono analizę wyników obliczając błędy ME, MAE, MPE, MAPE oraz współczynniki Theila I, I2, I12, I22, I32. Sformułowano wnioski z obliczeń. Wyznaczono równanie regresji wielorakiej z 12 predyktorami wytypowanymi spośród 53 zmiennych niezależnych. Uzyskano dane prognozowane do predykcji produkcji budowlano montażowej.
EN
The article is the first part of the series „Prediction construction and assembly production in Lower Silesia.” It was assumed that salary of employees will be one of the independent variables to determine the volume of production. Salaries of employees was predicted, using multiple regression and autoregressive moving average SARIMA methods. An analysis of the results was carried out. The errors ME, MAE, MPE, MAPE and Theil coefficients I, I2, I12, I22, I32 were calculated. Multiple regression equation with 12 predictors was set. Predictors were selected from among the 53 independent variables. Forecasted data were obtained for construction and assembly production prediction.
PL
W pracy analizowano możliwość prognozowania produkcji budowlano montażowej województwa dolnośląskiego metodami regresji, sieci neuronowych i ARIMA (Autoregressive Integrated Moving Average - autoregresyjny zintegrowany proces średniej ruchomej). Do prognozowania w metodzie regresji użyto danych pogodowych dziennych województwa dolnośląskiego oraz danych ekonomicznych dotyczących ilości zatrudnionych pracowników w sektorze budownictwo i średnich zarobków pracowników w tym sektorze. Przeprowadzono analizę wyników obliczając błędy ME, MAE, MPE, MAPE oraz współczynniki Theila I, I2,I1 2, I2 2, I3 2. Sformułowano wnioski z obliczeń.
EN
The article analyses the possibilities of forecasting Lower Silesia’s construction production with stepwise regression, neural networks and ARIMA (Autoregressive Integrated Moving Average) methods. For the forecasting with the stepwise regression method the authors use the daily weather data of Lower Silesia and economic data: the number of employees in the construction sector and the average earnings of workers in this sector. The analysis of results by calculating errors ME, MAE, MPE, MAPE and Theil coefficients I, I2,I1 2, I2 2, I3 2 was performed. The authors of the article also propose the scope for further research.
PL
14 października 2010 r. w toruńskim Ratuszu Staromiejskim została podpisana umowa z Generalnym Wykonawcą na realizację inwestycji, jaką jest budowany w tym mieście most. Zakończenie budowy nowej przeprawy zaplanowano na drugą połowę 2013 r. O przebiegu prac i szczegółach technicznych z Andrzejem Żyderem, kierownikiem kontraktu, rozmawia Maria Rogalska.