As a result of the power system’s catastrophic failure, thermal power plant units should proceed to the house load operation (HLO). Due to the catastrophic failure process dynamics, many units may be subject to emergency outage. It is therefore necessary to restart these units by powering them from blackstart sources with self-propulsion capability. The applicable Transmission Network Code (IRiESP) provides for periodic screening and system tests for such sources. Each system test before, and after, requires a simulation test to evaluate the capacity to supply power to the blackstarted plant through a starting circuit, as well as to restart the concerned unit’s most powerful auxiliary equipment. This paper presents selected results of the simulation studies of transient phenomena in the starting circuit from Dychów Hydropower Plant to Turów Power Plant, related to the system test conducted in July 2016.
PL
W wyniku awarii katastrofalnej systemu elektroenergetycznego (SE) bloki elektrowni cieplnych powinny przechodzić do pracy na potrzeby własne (PPW). Ze względu na dynamikę procesu awarii katastrofalnej wiele bloków może zostać odstawionych awaryjnie. Istnieje zatem konieczność ponownego uruchomienia tych bloków ze źródeł rozruchowych, posiadających zdolność do samostartu. Obowiązująca Instrukcja Ruchu i Eksploatacji Sieci Przesyłowej (IRiESP) wprowadza dla takich źródeł okresowe testy sprawdzające i próby systemowe. Każda próba systemowa przed, a także po, wymaga przeprowadzenia badań symulacyjnych pozwalających ocenić możliwości podania napięcia do uruchamianej elektrowni torem rozruchowym, a także uruchomienia największych ze względu na moc urządzeń potrzeb własnych uruchamianego bloku. W artykule przedstawiono wybrane wyniki badań symulacyjnych zjawisk przejściowych w torze rozruchowym z EW Dychów do Elektrowni Turów, związanych z przeprowadzoną próbą systemową w lipcu 2016 roku.
EN
The basic scenario of the power system recovery after catastrophic failure is to start the thermal power units that have been shut-down in an emergency by supplying voltage and starting power from self-starting hydroelectric power plants. The consequence of implementing such a plan is the formation of a local island system powered by the hydro plant units in parallel with a turboset of the started thermal power plant. The paper presents the results of measurements recorded in a system test of starting a 264 MW unit at the Turów Power Plant with input from Dychów hydro electric Plant. In particular, the ability to synchronize the unit started at Turów with the hydro sets at Dychów loaded with auxiliaries and pumps was assessed.
PL
Podczas odbudowy systemu elektroenergetycznego, po wystąpieniu awarii katastrofalnej podstawowym scenariuszem jest uruchomienie bloków elektrowni cieplnych, które zostały odstawione awaryjnie, przez podanie napięcia i mocy rozruchowej z samostartujących elektrowni wodnych. Konsekwencją realizacji takiego planu jest tworzenie lokalnego układu wyspowego, w którym źródłem mocy elektrycznej będą równolegle pracujące hydrozespoły elektrowni wodnej i turbozespół uruchomionej elektrowni cieplnej. W referacie przedstawione zostaną wyniki pomiarów zarejestrowane w trakcie próby systemowej uruchomienia bloku energetycznego o mocy 264 MW w Elektrowni Turów z Elektrowni Wodnej Dychów. W szczególności ocenie poddane zostaną możliwości synchronizacji uruchomionego bloku w Elektrowni Turów z hydrogeneratorami EW Dychów, obciążonymi potrzebami własnymi jednostek wytwórczych i pompami w EW Dychów.