The article presents the current state of knowledge in the field of estimating preliminary values of storm water subcatchment calibration parameters in the case of using the Storm Water Management Model (SWMM) for building a model of storm water drainage system. The key issue is estimating the runoff width in the case of reducing the network structure and storm water catchments due to the shortening of calculation time and simplification of the model calibration process. Correction of one of the recommended literature methods has been proposed. The assessment was based on the real catchment model with single and multi-family housing. It was found possible to apply the proposed method in the case of reducing systems connected in series.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.