Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
1
Content available remote Results of the “DPDT-Auger” research project on screw displacement piles
EN
The main objective of the “DPDT-Auger” research project was to test the prototype DPDT auger for forming screw displacement piles in the ground (patented in Poland in 2020). An additional aim was to develop design methods and rules for the making of such piles. The augers and piles were first tested on a model scale, and then more extensively in the real scale on experimental field plots. The results found the overall functionality of the DPDT auger to be good, and in several aspects better than that of the SDP auger. The load-bearing capacities and Q-s characteristics of piles made with both augers were considered comparable. All the conducted tests and their derived dependencies together with the results of in situ subsoil tests allowed for the development of empirical calculation methods and prognostic procedures, useful for designing and producing piles with DPDT and SDP augers. FEM numerical simulation rules for the considered piles were also developed, verified and calibrated by the results of real pile tests. This article describes only the most important final results of the research project but not the detailed results of the numerous tests and analyses that were carried out. Also omitted are the results of model tests and numerical simulations, as well as the implementation and acceptance recommendations, as they have already been or will be the subject of separate publications.
PL
Przedstawienie prototypowej konstrukcji świdra do wykonywania pali i kolumn przemieszczeniowych wkręcanych. Analiza porównawcza wyników testów terenowych oporów wkręcania świdrów DPDT i SDP. Wnioski na temat efektywności działania i zasadności stosowania nowej konstrukcji świdra w praktyce wykonawczej.
EN
Presentation of the prototype construction of the drill for producing screw displacement piles and columns. Comparative analysis of the field tests results of the screwing resistances of DPDT and SDP drill augers. Conclusions on the effectiveness of operation and the usefulness of the new drilling tool in performance practice.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.