The paper concerns an existing flexible manufacturing system containing two dedicated machines with three magazines of raw material and the transportation system in the form of the robot with a linear routing. Firstly, a mathematical model of the system has been developed. In general, there are batches of identical parts to be produced in the system for which the technological routes are defined and which constitute a job-shop environment. Additionally, the set-up times for batches and particular operations are taken into account. For this model a heuristic scheduling algorithm has been constructed. Computational experiments and simulation studies validated the model and the algorithm proposed.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.