Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
Standard time is a key indicator to measure the production efficiency of the sewing department, and it plays a vital role in the production forecast for the apparel industry. In this article, the grey correlation analysis was adopted to identify seven sources as the main influencing factors for determination of the standard time in the sewing process, which are sewing length, stitch density, bending stiffness, fabric weight, production quantity, drape coefficient, and length of service. A novel forecasting model based on support-vector machine (SVM) with particle swarm optimization (PSO) is then proposed to predict the standard time of the sewing process. On the ground of real data from a clothing company, the proposed forecasting model is verified by evaluating the performance with the squared correlation coefficient (R2) and mean square error (MSE). Using the PSO-SVM method, the R2 and MSE are found to be 0.917 and 0.0211, respectively. In conclusion, the high accuracy of the PSO-SVM method presented in this experiment states that the proposed model is a reliable forecasting tool for determination of standard time and can achieve good predicted results in the sewing process.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.