Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The article considers the issues of applying ground penetrating radar (GPR) technologies for engineering purposes concerning subsurface research. It describes the field of application of GPR research during road construction and operation and the advantages and disadvantages of this type of engineering survey. It presents comparative data on the accuracy (inaccuracy) of existing GPR control methods applied to determine the thickness of the monolithic pavement layers in Europe, CIS, and the USA. The main provisions of the GPR survey procedure are described, including four main stages: the analysis of initial materials of surveyed section and equipment preparation; GPR survey; geological verification; processing and interpreting of radargrams; and the preparation of a report. Geophysical works were performed using the geo-radar of the OKO series as part of the road measuring complex DVK-05 on the section of the Astana-Petropavlovsk A-1 highway with cement concrete pavement and on the section of the R-12 "Kokshetau - Atbasar" with asphalt pavement. The example of a radargram and the core sample of a cement concrete pavement taken during geological verification of the thickness of a monolithic layer is presented. Graphs of variation in the thickness of pavement layers by radargrams of longitudinal passages in the indicated road sections with the assumptions about the nature of the heterogeneity of the obtained values are given. The obtained results on the thickness of monolithic layers (cement concrete and asphalt concrete) were assessed on the criteria of quantitative deviation from the required standard value. Recommendations were provided to address positive deviations in the thickness of monolithic pavement layers at various stages of the road survey.
EN
The design dimensions of the executive hydraulic cylinders of the brake system of heavy-duty mining dump trucks cause high fluid flow during the braking process. Therefore, dimensions of the anti-blocking system modulator spool pair require unique electromagnets or hydraulic amplifiers to control. These solutions do not allow the required modulator performance. Thus, a modulator scheme with a division of the flow of fluid from the source to the brake cylinders was developed. This scheme allows during emergency braking passing, an additional amount of fluid to cylinders through the valve, installed parallel to the main valve upon pressure increase phase and controlled by the pressure difference. The task is to develop a method for calculating the main structural dimensions of a modulator. The calculation of the valve of the second cascade, installed in parallel to the main stage, is carried out for the emergency braking mode with the maximum flow rate to ensure the required performance of the braking system. The balance of fluid flows equations is compiled at the key points. The flow rate of the fluid through each of the valves is determined by the Torricelli formula, and the pressure difference across the valves is assuned equal. The obtained relations allows building a family of Q-p curves, which can be used to select the diameter and stroke of the additional valve depending on the flow rate in the brake system.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.