EN
The article focuses on issues encountered in the execution of a crosscut in a fault zone with a 120 m drop, and contains a description of the technology used by TAURON Wydobycie S.A. ZG „Sobieski" to seal the rock formations surrounding the excavation. When the crosscut reached a fault, the excavation was buried with loose debris from the neighboring rock formations. Due to simultaneous inflow of large amounts of water, the drainage system was prepared to guarantee water discharge exceeding the projected inflow by 50%. In order to fulfill the assumptions for the developed technology for safe passage through the fault zone, 7 holes were drilled to create drainage and subsequently lower hydrostatic pressure by 0.3 MPa. After that, crosscut drilling proceeded in strictly controlled and interrelated technological phases. These phases included reinforcing the rock mass with mineral binder through pre-drilled holes, and then by completing repeated cycles of excavation drillings in the fault zone, consisting of: drilling, rock mass reinforcement with binder injections and steel rod or self-tapping anchor piloting, building consecutive frames under the existing lining, and pumping mineral binder between individual lining layers.
PL
Na tle charakterystyki warunków geologicznych i opisu podstawowych pojęć dotyczących stateczności wyrobisk przedstawiono w artykule technologię bezpiecznego przejścia przez strefę uskoku o zrzucie 120 m podczas drążenia przekopu II do szybu Grzegorz na poziomie 540 m ZG „Sobieski" w warunkach trzeciego stopnia zagrożenia wodnego. Dokonano też oceny dotychczasowych efektów prowadzenia drenażu górotworu w rejonie tego wyrobiska.
EN
The article presents current mining works improving the safety of the Bochnia Salt Mine. Due to centuries of rock salt mining, intensive actions are required at the mine to protect the historic workings and surface of the area. In recent years, a sealing barrier has been constructed around the 16th-century Wielki Shaft to protect the salt rock mass from the destructive influence of external water. The mine is also carrying out intensive liquidation of redundant post-mining pits, which reduces the convergence of historic chambers and pits, and limits the extent of mining damage to surface facilities. An important task of the ongoing mining work is the protection, maintenance and preservation of the pits under historic protection. All these activities, as well as periodic inspections of the pits, have a significant impact on improving the safety of work and people underground.
PL
W artykule przedstawiono roboty górnicze poprawiające bezpieczeństwo prowadzenia ruchu Kopalni Soli „Bochnia". Ze względu na wielowiekową eksploatację wymaga ona intensywnych działań zabezpieczających, niezbędnych dla ochrony zabytkowych wyrobisk i powierzchni terenu. W ostatnich latach wykonano barierę uszczelniającą wokół XVI-wiecznego szybu Wielki, która zabezpieczyła górotwór solny przed destrukcyjnym wpływem wód pozazłożowych. W kopalni prowadzi się również intensywną likwidację zbędnych wyrobisk poeksploatacyjnych, ograniczającą konwergencję zabytkowych komór i wyrobisk oraz zmniejszającą zasięg szkód górniczych w obiektach powierzchniowych. Ważnym zadaniem prowadzonych prac górniczych jest zabezpieczenie, utrzymanie i konserwacja wyrobisk objętych ochroną zabytkową. Wszystkie te działania oraz cykliczne kontrole wyrobisk mają wpływ na znaczną poprawę bezpieczeństwa prowadzenia ruchu zakładu i ludzi w nim przebywających.
EN
A threat to the „Wieliczka" Salt Mine is posed by extra-deposit waters in the Chodenice beds - espe cially at the northern border of the deposit, repeatedly affected by mining works (e.g. the Mina corridor). Zones of cracks and caverns can lead from them to the mine significant amounts of water undersaturated with NaCI. The uncontrolled inflow of such waters to the „Mina" corridor from 1992 indirectly contributed to the end of salt explo itation and the focus on tourist services and the liquidation of excavations. The outflow reached its maximum in the autumn of 1992, when the surface of the land in the outskirts of the corridor was also destroyed. Securing the Mina was first carried out by lowering the hydrostatic pressure in the rock mass by taking in the inflowing brine. In 2007, a decision was made to close the corridor tightly, which carried the risk of pressure increase behind the dam, migration of undersaturated brine to other mine excavations and leaching of the rock mass. Therefore, in 2008, the President of the State Mining Authority appointed a Committee for issuing opinions on the state of water and collapse hazards in KS „Wieliczka", which formulated a number of recommendations. Experiences related to the elimination of the threat in the Mina corridor were extended to other excavations at risk. The risk reduction began with the liquidation of the Gussmann and Kosocice drifts in the area of W VI-6 and W VI-32 leaks in Z-28 and Z-32 chambers. Monitoring of the water table in the area of these leaks, as well as in the area of W VII-16 leak (i.e. the three largest inflows to the mine) showed the existence of two aquifers in the Chodenice beds: upper, well-permeable (piezometers PZ-1 and PZ-2), and lower, poorly permeable (PZ-3 hole). As part of the fight against natural hazards, approx. 83% of the chambers indicated by the Commission at the northern boundary of the de posit have been backfilled to date. At the same time, observations of delamination of roof and sidewall rocks and convergence measurements are carried out. In a number of excavations, the rock mass is anchored and cribs are built. Measurement results and observations in excavations do not show significant changes. Convergence measu rements showed its low intensity in most of the excavations of the lump deposit, and its increased intensity only in the bedded deposit. No significant changes were found in the condition of the chambers which could potentially collapse. In B-3 and W-l wells, the water table in the northern outskirts of the deposit is also recovering. Thus, the actions indicated by the State Mining Authority's Commission led to the reduction of the water hazard and the related collapse hazard in the „Wieliczka" Salt Mine.
PL
W artykule omówiono działania podjęte dla zminimalizowania zagrożenia wodnego i zawałowego w Kopalni Soli „Wieliczka" w latach 1992-2021, po niekontrolowanym dopływie wód pozazłożowych do poprzeczni Mina. Szczegółowo przedstawiono realizację postanowień komisji powołanej przez prezesa WUG w 2009 r., która na podstawie zebranych doświadczeń zaproponowała kierunki likwidacji nieudostępnionych turystom wyrobisk górniczych.
PL
W artykule przedstawiono metodykę prowadzenia laboratoryjnych oznaczeń przepuszczalności i współczynnika filtracji na próbkach piaskowców karbońskich, pobranych z otworów wiertniczych odwierconych w przykładowym obszarze badań, i analiz warunków krążenia wód w strefie rozdzielającej zroby kopalni zlikwidowanej i czynne wyrobiska kopalni chronionej. Na podstawie uzyskanych wyników badań oszacowano natężenie przepływu wody przez caliznę skalną w strefie oddzielającej występowanie zrobów obydwu kopalń. Ponadto omówiono znaczenie metod i wielkości tych parametrów hydrogeologicznych w ocenie procesów i oszacowaniach natężenia przepływu wody między kopalniami oraz w prognozowaniu zagrożenia wodnego z uwagi na wydajność systemów odwadniania kopalń.
EN
Water damming up in the goafs of the abandoned mine may result in uncontrolled flows from the water reservoir to the workings of the neighboring mines. This flow increases the water hazard. The assessment of the water hazard of an active mine located in the vicinity of the abandoned mine includes primarily the analysis of safety pillars and drainage systems. The safety pillars are assessed for their tightness (permeability) and strength. The evaluation of drainage systems is based on determining the maximum capacity and reserve of the system drainage. The reliability of water filtration calculations in the pillar zone is strictly dependent on the accuracy of the recognition of the per meability (filtration coefficient) of the safety pillar rock mass. The highest values of filtration coefficient are usually assumed during assessing water filtration through safety pillars. This allows to estimate the filtration intensity with an excess and to obtain a certain safety margin essential for the functioning of the drainage systems of protected mines. The simulation calculations of the water flow through the safety pillar presented in the article should allow to determine the safety condition of the protected mine. The results of the permeability studies of the safety pillars rocks, with sufficient accuracy, can be obtained using the PDPK 400 permeameter.
PL
Likwidacja kopalń i restrukturyzacja górnictwa węgla kamiennego w obszarze Górnośląskiego Zagłębia Węglowego (GZW) – ze względu na obecność i konieczność ochrony czynnych kopalń – nie rozwiązuje problemu odwadniania kopalń z/likwidowanych. W zlikwidowanych kopalniach stosowane są 3 systemy odwadniania: głębinowy (GSO) (wykorzystujący 1 szyb, z 1 lub kilkoma pompami głębinowymi), stacjonarny (SSO) (wymagający utrzymywania złożonej dołowej i powierzchniowej infrastruktury technicznej) oraz odwadnianie grawitacyjne (OG)(samoczynny spływ wody z zatopionej kopalni, do cieku powierzchniowego lub sąsiedniej kopalni lub pompowni). Najtańszym, najbezpieczniejszym i najprostszym pod względem technicznym, jest wdrożony przez SRK S.A. Oddział Centralny Zakład Odwadniania Kopalń (CZOK) – głębinowy system odwadniania. Koszt GSO jest o ok. 75% niższy niż odwadniania stacjonarnego. Zmiana systemu odwadniania, wymaga wnikliwej analizy zagrożenia wodnego dla sąsiednich kopalń. Wdrożony w latach 90. model odwadniania zlikwidowanych kopalń oparty został na istnieniu połączeń hydraulicznych pomiędzy czynnymi i zlikwidowanymi kopalniami. Sposób odwadniania likwidowanej kopalni projektowany był z poziomem zatopienia wyrobisk, poniżej najniższego kontaktu hydraulicznego z czynną kopalnią. W żadnej kopalni nie próbowano zlikwidować, niekiedy pojedynczego bezpośredniego połączenia hydraulicznego. Skutkiem tego jest utrzymywanie od kilkunastu lat pompowni, z „głębokim”, czyli kosztownym odwadnianiem. Dynamiczna sytuacja górnicza w obszarze GZW oraz dwudziestoletnie doświadczenia SRK S.A. Oddziału CZOK dowiodły, że przyjęty model wymaga weryfikacji. SRK S.A. Oddział CZOK na bieżąco dostosowuje i upraszcza odwadnianie byłych kopalń, nie zapominając o ochronie czynnych. Skutkiem tego jest zmniejszenie ilości pompowanej wody ze zlikwidowanych kopalń z ponad 99 mln m3 do ok. 66 mln m3 rocznie i retencja ok. 110 mln m3 wody w zrobach. Towarzyszy temu likwidacja licznej infrastruktury górniczej, wyrobisk, szybów, pompowni. Na bazie aktualnej sytuacji górniczo-hydrogeologicznej, SRK S.A. Oddział CZOK proponuje do wdrożenia nowy docelowy model odwadniania wszystkich kopalń w GZW (DMO GZW). Jest on oparty na wydzieleniu 9-ciu rejonów odwadniania (RO), z jedną centralną/rejonową pompownią, w każdym rejonie. Prognozuje się, że łączny dopływ do RO wynosić będzie ok. 400 m3/min (ok. 210 mln m3 wody/rok). RO należy widzieć jako odrębny układ górniczo-hydrogeologiczno-odwadniający, z wyznaczoną kopalnią – pompownią rejonową (PR) – do której kierowane będą wody z sąsiednich likwidowanych kopalń. SRK S.A., z sukcesem doprowadził praktycznie do końcowej fazy dwa RO: „Saturn” odwadniający zlikwidowane kopalnie w NE części GZW oraz „Centrum”, przygotowany do odwadniania kopalń niecki bytomskiej. Proponowane przemodelowanie wymaga zaangażowania i współudziału wszystkich przedsiębiorstw górniczych oraz realizacji w likwidowanych kopalniach wyprzedzających przedsięwzięć. DMO GZW zoptymalizuje i zmniejszy koszty ochrony czynnych kopalń przed zagrożeniem wodnym.
EN
The process of liquidation of mines and the restructuring of coal mining in the area of Upper Silesian Coal Basin – due to protecting active mines – not eliminated the problem of dewatering abandoned coal mines. Implemented in the years 90. dewatering model, was based on the existence of hydraulic connections between active and liquidated coal mines. The current situation of mining in the area of Upper Silesian Coal Basin and the experience of SRK S.A. – COAL MINES RESTRUCTURING COMPANY & CZOK Department (Central Plant of Dewatering Mines) SRK CZOK in the field of mine drainage, prove that this model requires verification and improvement. On the basis of the current mining and hydrogeological situation, SRK S.A. proposes to Target Dewatering Model all mines of Upper Silesian Coal Basin, based on separating 9 drainage areas, with one district pumping station for each of them. The success of its implementation, requires the involvement and participation of all mining companies and need to take the proposed measures before the liquidation of the mine. Target Dewatering Model, will optimize and reduce the cost of protecting neighboring active coal mines against the threat of flooding.
PL
Szyb Górsko jest siedemnastowiecznym szybem kopalni wielickiej, który został zasypany w 1954 roku. Na przełomie 2002 i 2003 roku przepływy wód opadowych doprowadziły do naruszenia stateczności budynku nadszybia, tworząc zagrożenie dla trwałości zabytku. Analiza wyników pomiarów niwelacyjnych, prowadzonych od 1 stycznia 2003 roku ujawniła zjawisko narastania przemieszczeń pionowych w bliskim sąsiedztwie szybu o zmiennej prędkości. Początkowo tempo obniżeń osiągało 350 mm/rok, a po likwidacji prawdopodobnych rozluźnień i ewentualnych wymyć w pobliżu ścian i fundamentów szybu prędkość przemieszczeń zmalała do niespełna 20 mm/rok. W 2012 roku, po wykonaniu kompleksowych prac uszczelniających szyb, tempo osiadania spadło do ok. 12 mm/rok, czyli do prędkości przemieszczeń wynikającej z wpływu zaciskania wyrobisk kopalnianych na powierzchnię terenu w sąsiedztwie szybu Górsko. Wyniki pomiarów geodezyjnych wskazują na opanowanie zagrożenia spowodowanego przepływem wód opadowych przez otoczenie szybu do wyrobisk kopalni.
EN
The “Górsko” shaft is a seventeenth-century shaft of the “Wieliczka” Salt Mine, which was filled in 1954. At the turn of 2002 and 2003, rainwater flows led to a violation of the stability of the headroom building, creating a threat to the durability of the monument. Analysis of the results of leveling measurements conducted since January 1, 2003 revealed the phenomenon of increasing vertical displacements in close proximity to the shaft with a variable speed. Initially, the rate of subsidence reached 350 mm/year, and after the elimination of probable loosening and possible wash-outs near the shaft walls and foundations, the speed of displacement decreased to less than 20 mm/year. In 2012, after the comprehensive shaft sealing work, the subsidence rate dropped to approx. 12 mm/year, i.e. to the speed of displacement resulting from the impact of mine workings closing on the surface of the area in the vicinity of the “Górsko” shaft. The results of geodetic measurements indicate control of the threat caused by the flow of rainwater through the surroundings of the shaft to the mining goafs.
EN
In the next time, deepening exploitation and increasing capacity in underground mines are extremely necessary to meet the demand of using coal for developing economies. This problem is not only done in underground mines but also in areas that cannot be exploited by open-pit methods such as the open-pit edge. When exploiting deep underground mines, there are many difficulties for tasks such as: controlling ground pressure; ventilation; drainage, transportation etc. When cutting coal in longwall, it will create a goaf, causing a natural imbalance of stress in the ground, leading to the phenomenon of displacement of rock deformation and destruction of roadways, which creates a risk of unsafety labour. The L7 seam at the west wing area of the Mong Duong coal mine has an average thickness of 7m, an average slope angle of 15o, located near the edge of the 790 open pit site. According to the production plan, this mine will exploit this reservoir with blasting-drilling technology, longwall support by the semi-mechanized shield (self-moving hydraulic frame GK/1600/16/24/HTD). The preliminary assessment of hydrogeological conditions of the mine shows that this is a potential area with a high risk of water burst into the longwall. Until now this mine has not yet given a specific solution to this problem. Finding a reasonable mining solution to ensure production safety and reduce resources loss is extremely important problem not only for the Mong Duong coal mine but also for mines that have similar mining conditions of Vietnam National Coal – Mineral Industries Holding Limited (Vinacomin), Vietnam.
PL
W ostatnich latach, w Wietnamie intensywnie prowadzono nie tylko rozbudowę i modernizację istniejących kopalń lecz także zagospodarowano nowe złoża na szeroką skalę. W górnictwie podziemnym istnieje wiele ważnych problemów technicznych, które należy rozwiązać, mianowicie: ciśnienie, wentylacja, trans-port podziemny, odwadnianie itp. Wykonanie wyrobiska powoduje zaburzenie początkowego stanu równowagi w górotworze nienaruszonym, skutkiem czego w otoczeniu wyrobiska zmieniają się naprężenia których wartość jest większa od naprężeń początkowych. Odprężenie górotworu w otoczeniu wyrobiska górniczego powoduje przemieszczanie się skał w kierunku pustej przestrzeni. Pokład L7 w zachodnim skrzydle kopalni Mong Duong ma średnią miąższość 7 m, średni kąt nachylenia 15 ° znajduje się w pobliżu krawędzi odkrywki 790. Zgodnie z planem wydobycia kopalni, zakład górniczy Mong Duong będzie kontynuować eksploatację tego pokładu z technologią wiercenia strzałowego, podparcie ściany za pomocą pół-zmechanizowanej osłony (samojezdna rama hydrauliczna GK / 1600/16/24 / HTD). Wyniki badań warunków hydrogeologicznych kopalni wskazują, że obszar badany jest potencjalny o dużym ryzyku wtargnięcia wody do ściany. W artykule, przedstawiono odpowiednie rozwiązania technologii wydobywczej, które zabezpieczają kopalnię przed zagrożeniem wodnym i ograniczy straty zasobów. Opracowana metoda jest zastosowana nie tylko dla kopalni Mong Duong, ale także i dla kopalń należących do Vinacomin, które mają podobne warunki górniczo-geologiczne.
PL
Artykuł na tle opisu mechanizmu tworzenia się pustek Webera w uwarunkowaniach górniczo-geologicznych KWK „Murcki-Staszic", gdzie wystąpiły one w najbardziej klasycznej postaci, na przykładzie zdarzeń z lat 2007-2009 w polu AB tej kopalni przedstawia ich związek z nagłymi dopływami wody do prowadzonych wyrobisk.
EN
The article describes the mechanism of the creation of Weber's voids in the mining and geological conditions of the „Murcki-Staszic" minę, where they occurred in the most classical form. The seąuential arrangement of layers over the excavation: claystone, mudstone, sandstone, favours the formation of this phenomenon, even in the conditions of poor water accumulation of the rock mass in the deposit area. The claystone in the ceiling above the longwall with caving is crushed, the mudstone, as morę rigid, bends under a thick sandstone complex, creating a huge few-centimetre thick gap into which relic waters from the overlying sandstone are sucked in. The disruption of this arrangement by mining works results in a sudden flow of water into the excavation.
PL
Likwidacja kopalni podziemnej pociąga za sobą radykalną zmianę warunków technicznych i ekonomicznych, organizacyjnych, prawnych, geologicznych i górniczych oraz ochronę czynnej kopalni. Znajduje to odzwierciedlenie w opisanych szczegółowo w artykule przepisach prawnych dotyczących likwidacji podziemnych obiektów górniczych, które wymagają przygotowania oddzielnej dokumentacji hydrogeologicznej, planów ruchu i projektów technicznych likwidacji górnictwa. Autorzy artykułu zgromadzili i usystematyzowali aktualny stan prawodawstwa oraz praktyczne rozwiązania niezbędne do spełnienia wymogów likwidacji podziemnych kopalń w Górnośląskim Zagłębiu Węglowym (GZW).
EN
Underground mine liquidation entails a radical change of technical and economic, organizational legal, geological and mining conditions, as well as surface protection in relation to the active mine. This is reflected in the legal provisions regarding the decommissioning of underground mining facilities, described in detail in this paper, which require the preparation of a separate hydrogeological documentation, traffic plans and technical projects for the mining area. The authors collected and systematized the current state of legislation and practical solutions necessary to comply with the liquidation of underground mines in the Upper Silesian Coal Basin.
PL
W artykule, na tle opisu budowy geologicznej, przedstawiono warunki hydrogeologiczne rejonu Olkusza, gdzie prowadzona jest eksploatacja złóż rud Zn-Pb. Scharakteryzowano strukturę i natężenie dopływów wód do każdego ze złóż rud, a także sposób ich ujmowania i odwadniania wyrobisk. Celem pracy jest wskazanie czynników kształtujących wielkość całkowitego natężenia dopływu, który w IV kwartale 2017 r. kształtował się na poziomie blisko 230 m3/min, oraz sposobu wyznaczania granic stopni zagrożenia wodnego.
EN
The deposit of lead and zinc ores of the “Olkusz-Pomorzany” Mine is located in the so-called Muschelkalk (the Middle Triassic), which is present on the strata of the Bunter sandstone. The Muschelkalk is locally covered by deposits of the Keuper and the Upper Jurassic, as well as of the Quaternary. The Quaternary, Upper Jurassic, and Triassic multiaquifer formations are connected to form a single water-bearing horizon. A karstic-fissured aquifer system developed in the Triassic multiaquifer formation. Exploitation is carried out under free groundater flow conditions. The intensity of groundwater inflow to excavations (230 m3/min in Q4 2017) depends on the lithology of carbonate rocks and the presence of numerous connected cavities and channels. Such connections allow groundwater beyond deposit borders to flow to excavations laterally and vertically. Operation of a mine under such conditions is based on the recognition of water conditions using underground holes and the monitoring of pressure in piezometers within the rock mass under mining drainage. The distribution of piezometric pressures in each of the multiaquifer formation makes the predicted inflows to be close to the actual inflows. This leads to decisions of the mine management related to the safety of mine operation under water hazard, including the categorisation of water hazard with the use of the groundwater table elevation of the Triassic multiaquifer formation compared to the elevation of the designed excavation. This categorisation method has been used since the mine was established. According to mine authorities, the method is suitable and effective.
PL
Zagrożenie wodne w Kopalni Soli „Kłodawa” występuje od ponad 65 lat, czyli od rozpoczęcia eksploatacji soli. Jednym z wycieków stanowiących zagrożenie jest zjawisko wodne nr 55 występujące na poziomie 750. W artykule przedstawiono wyniki monitoringu tego zjawiska wodnego. Kopalnia prowadzi systematyczną kontrolę wydajności wycieku i jego składu chemicznego oraz izotopowego. Wyniki tych badań pozwalają na określenie wody pochodzącej z tego zjawiska wodnego jako syngenetycznej solanki pochodzącej z wód uwięzionych w wysadzie.
EN
The water hazard in the “Kłodawa” Salt Mine has been present for more than 65 years, since the beginning of the salt exploitation. The water phenomenon No. 55, occurring at the level 750, is one of the leakages contributing to this threat. The article presents the results of this water phenomenon monitoring conducted by the mine. Systematic control of this leakage consits of efficiency, and also chemical and isotopic composition measurements. Based on the monitoring results, water coming from this phenomenon can be considered as a syngenetic brine, originating from waters trapped in the salt deposit.
PL
W 1992 roku w Kopalni Soli „Wieliczka” doszło do katastrofy wodnej. Podczas przebudowy ostatnich metrów poprzeczni Mina zlokalizowanej na IV poziomie kopalni zaistniały gwałtowne wypływy wody niosącej duże ilości materiału skalnego. Apogeum wypływów miało miejsce jesienią 1992 roku, kiedy doszło do destrukcji powierzchni terenu na przedpolu poprzeczni. Przyczyny zaistnienia katastrofy są złożone i sięgają początku XX wieku, kiedy kopalnia pod presją krytyki dotyczącej złej jakości wydobywanej soli poszukiwała nowych pól eksploatacji złoża. Do prac rozpoznawczych należało przedłużenie północnych końcówek poprzeczni Strzelecki, Dunajewski i Mina, dokonane w latach 1908-1917. Z uwagi na budowę geologiczną górotworu w przypadku poprzeczni Mina przedsięwzięcie okazało się chybione. Z powodu braku właściwego nadzoru nad prowadzonymi pracami, przekroczono granicę złoża i otrzymano w efekcie dopływ nienasyconej wody pochodzącej z utworów chodenickich. Granicy złoża wówczas nie wychwycono, o czym świadczą archiwalne materiały kartograficzne z lat 20. Wyciek w poprzeczni został zarejestrowany i podlegał systematycznej kontroli. Widnieje on na archiwalnej mapie z lat 30. Po II wojnie światowej dopuszczono do pogorszenia się technicznego stanu poprzeczni i ostatecznie w 1971 roku końcowe kilkadziesiąt metrów chodnika uległo zawałowi. Wyciek w poprzeczni przestał być kontrolowany i ujmowany i w sposób nieopanowany migrował na niższe poziomy kopalni, powodując destrukcję górotworu. W latach 80. postanowiono odbudować poprzecznię w celu ponownego ujęcia wycieku. Obowiązująca w górnictwie solnym instrukcja Zjednoczenia Kopalnictwa Surowców Chemicznych nakazywała ujmowanie wód kopalnianych w miejscu ich dopływu w celu uniemożliwienia migracji nienasyconych wód w solnym górotworze. W drugiej połowie lat 80 zaprojektowano przebudowę chodnika, jednak zbyt forsowną. Realizacja tego projektu na początku lat 90., w warunkach przemian społecznych i gospodarczych zachodzących w Polsce i zmian personalnych w kopalni doprowadziła do zaistnienia katastrofy wodnej w poprzeczni. Katastrofa ta oprócz negatywnych skutków miała jednak także swe pozytywne aspekty w postaci restrukturyzacji kopalni i wypracowania nowoczesnych metod zwalczania zagrożenia wodnego w górnictwie solnym.
EN
Catastrophic water intrusion into the Wieliczka Salt Mine occurred in 1992. When the final section of the Mina Crosscorridor, located at Level IV of the Salt Mine, was under reconstruction, sudden inflow of water carrying large amounts of rock material encroached the workings. The maximum leaks volume occurred in the autumn of 1992, with the destruction of land surface on the foreground of the cross-corridor (phot.1). The causes of the catastrophic events were complex and went back to the beginning of the 20th century when the Salt Mine management started to search for new mining fields under the pressure of criticism relating to the poor quality of extracted salt. Exploration works involved extension of the northern sections of the Strzelecki, Dunajewski, and Mina Cross-corridors conducted in 1908-1917. The last of the three projects failed, owing to the geological structure of the rock mass (fig.1). The salt deposit boundary was penetrated by the cross-corridor, probably due to poor supervision, and, consequently, unsaturated water originating from the Chodenice formation (fig.6), flew into the workings. The salt deposit boundary was not correctly identified, as proved by the archival cartographic materials of the 1920’s (fig.2,3). The leak was registered and put under regular inspections which we can see on the 1930’s maps (fig.4). After World War II, the technical condition of the cross-corridor was neglected and the end section several dozens of metres long collapsed in 1971. The water could not be controlled any longer and it migrated to the lower levels of the Salt Mine, causing rock mass destruction (fig.5). The management decided to reconstruct the cross-corridor in the 1980’s and plug the leak. The salt mining instructions adopted by the Chemical Minerals Corporation ordered plugging water leaks on location to prevent migration of unsaturated water within salt deposit. In the second half of the 1980’s, the reconstruction project was designed, but the works were too extensive (fig.7). The project was conducted in the early 1990’s, the period of social and economic transformations, as well as personnel replacements, occurring in Poland and in the Salt Mine itself. Those also contributed to the developments. Besides the negative effects, the catastrophe resulted in the implementation of a restructuring project and working out modern methods of water hazard control in salt mining.
PL
Kopalnia Soli „Kłodawa” S.A. eksploatuje sól kamienną od ponad 65 lat i na przestrzeni tych lat mierzy się z zagrożeniem wodnym. Spośród zinwentaryzowanych 516 zjawisk wodnych czynnych jest 153, z których 142 zjawiska stanowią zawilgocenia i wycieki kropelkowe, a tylko 11 zjawisk to wypływy solanki. Największe zagrożenie stanowią zjawiska: 106/600, 93/525, 30/619, 55/750, 7/450. Kopalnia prowadzi pełen monitoring tych zjawisk, a dzięki odpowiednio prowadzonej profilaktyce oraz zdobytej wiedzy możliwe jest racjonalne planowanie frontu robót górniczych, z zachowaniem najwyższego stopnia bezpieczeństwa eksploatacji i ochrony infrastruktury.
EN
The „Kłodawa” Salt Mine S.A. has been excavating rock salt for over 65 years, and during all this time it to face with water threat. Among 516 evidenced sites of brine occurrence in the mine, 142 are the sites of rock wettening or droplet leakage and only 11 are actual brine leakage sites. The biggest threat is assumed to relate to leakages registered as 106/600, 93/525, 30/619, 55/750, and 7/450. Continuous monitoring of water hazard sites and adequate prevention enables the mine rational mining and maintaining the highest degree of safety of both excavation and the infrastructure protection.
EN
The paper characterizes selected methods of studying the sources of water hazard and solid rocks properties useful in the assessment of hydrogeological conditions of hard coal mines. Particular attention was paid to the measurement method of rock permeability using the unique PDPK-400 equipment in the assessment of filtration conditions and conditions of water flow in post-exploitation goafs and trough safety pillars. The possibilities of using an oedometer in the evaluation of permeability of post-exploitation goafs have been indicated. The usefulness ofsome investigation methods of the rock environment as sources of input data for numerical modelling of filtration have also been shown.
PL
W artykule omówiono możliwe sposoby poprawy stanu technicznego obudowy szybowej i warunków pracy obudowy w warunkach zagrożenia ze strony słabych zawodnionych warstw górotworu w świetle efektywności tych sposobów. Proces starzenia się materiałów obudowy często przyspieszony wyciekami agresywnych wód, coraz częściej powoduje konieczność napraw obmurza szybowego, a wykorzystywane procedury obliczeniowe oparte są głównie na dotychczasowych zasadach projektowania obudów nowych szybów. Z tych względów w artykule sformułowano podstawowe zasady projektowania sposobów wzmacniania obudowy betonowej ograniczającej zagrożenie wodne dla szybu.
EN
The article discusses possible ways to improve the technical condition of the shaft’s lining and operation conditions of the lining in the presence of a hazard on the side of weak, watered layers of rockmass in the light of the effectiveness of these methods. The process of aging of the lining’s materials, often accelerated by leaks of aggressive waters, more and more often makes it necessary to repair the shaft’s and the applied computational procedures are based mainly on existing rules of designing of new shafts’ lining. For these reasons, the article formulated the basic principles of designing of the ways to reinforce the concrete lining limiting thus the water hazard for the shaft.
PL
W artykule przedstawiono doświadczenia kopalni węgla kamiennego „Murcki-Staszic” w ocenie zagrożenia wodnego dla planowanych i prowadzonych robót górniczych. W ocenie takiej dla robót w pobliżu zbiornika wody w zrobach należy wykorzystywać możliwości, jakie dają badania interdyscyplinarne. Do określenia dopuszczalnego i bezpiecznego ciśnienia wody w źródle zagrożenia wodnego można zastosować metody badań hydrogeologicznych i fizykomechanicznych środowiska skalnego. W artykule wskazano zastosowane metody oceny oraz scharakteryzowano profilaktykę zwalczania, a także sposób monitoringu przejawów zagrożenia wodnego.
EN
The article presents experiences of the “Murcki-Staszic” coal mine in the evaluation of water hazard for planned and conducted mining works. In assessing the conditions for the safe conduct of mining works, an essential element was the analysis of the state of water hazard. It has been found that the best solution for current geological-mining conditions will be effective drainage and lowering of water pressure in the reservoir, with an estimated capacity of about 240000 m3. Determining the safe water pressure in the reservoir, however, required taking into account the actual geomechanical parameters of the rocks, including the index of lowering the tensile strength of rocks due to their destruction (K = 0.6). Based on the calculations, it was found that safe operation of the works is possible in the case of the accumulation of water in the reservoir not higher than 6.5 m with respect to the floor of conducting gallery. It was necessary, however, to carry out ongoing monitoring of the parameters of the reservoir and the rock mass, which allowed to adjust the progress of the works to the stated conditions.
PL
Komora Fryderyk August znajduje się jest na poziomie IIn, na południe od szybu Górsko. W części północnej komory, zlokalizowany jest wyciek nienasyconej solanki i upłynnionego materiału ilasto-pylastego z szczeliny stropowej. Wyciek powoduje systematyczny rozwój zniszczeń płaszcza solnego komory i elementów drewnianej obudowy. Analizując możliwe metody zabezpieczenia komory Fryderyk August wzięto pod uwagę podsadzenie komory podsadzką hydrauliczną albo zabezpieczenie komory poprzez wzmocnienie skał stropowych i ociosowych obudową kotwiową i zabudowę kasztów drewnianych oraz wykonanie zabiegów iniekcyjnych. Trzecim rozważanym rozwiązaniem problemu jest wypełnienie komory mieszaninami iniekcyjnymi. Rozwiązaniem optymalnym okazało się wypełnienie komory mieszaninami iniekcyjnymi z uwagi na uzyskanie pełnego podparcia stropu i zabezpieczenie rejonu wycieku bezpośrednio po wypełnieniu, bez wpływu na obciążenie i stan filarów wyrobisk sąsiednich. Wybrany wariant nie wymaga przebudowy wyrobisk chodnikowych w celu doprowadzenia podsadzki do likwidowanych komór oraz zapewnia bezpieczne prowadzenie robót.
EN
The Frederick Augustus Chamber is located on Level II, south of the Górsko shaft. Unsaturated brine and liquefied fine silt are leaking into the chamber from a fissure in the ceiling located in the northern part of the chamber. Salt water and the liquefied silty material are causing systematic damage to the salt-coat of the chamber as well as to its wooden supporting elements. The following possibilities of implementing alternative solutions were analysed as an outcome of the analysis of methods for securing the Frederick Augustus Chamber: back-filling the chamber by means of hydraulic backfilling; securing the chamber by strengthening ceiling rocks and sidewalls with anchor supports and wooden crib casing as well as performing injection procedures. The optimal solution is a filling-in of the chamber with injection mixtures because it allows to accomplish the total support of the ceiling and secures the leak area immediately upon filling of the chamber, without increasing the load, and without deteriorating the state of the pillars of mine workings located in the work area. This option was selected as it does not require reconstruction of the mine corridors for the purpose of backfill transportation to the chamber guaranteeing long-term safe working conditions.
18
Content available Technologia uszczelniania szybów górniczych
PL
Technologia uszczelniania szybów górniczych została opracowana przez Kopalnię Soli „Wieliczka” S.A. w ramach realizacji projektu „Opracowanie technologii uszczelniania szybów górniczych przez Kopalnię Soli „Wieliczka” dofinansowanego ze środków UE w ramach programu POIG 1.4. i we współpracy z Wydziałem Wiertnictwa Nafty i Gazu Akademii Górniczo-Hutniczej im. Stanisława Staszica. Technologia wykorzystuje najnowocześniejsze metody wiertnicze oraz opatentowane zaczyny uszczelniające, które charakteryzują się większą odpornością na agresywne środowisko, niż standardowe materiały wiążące. Technologia wykorzystuje również mobilny system monitoringu wizyjnego oraz system monitoringu przemieszczeń obudowy szybowej. Całość monitoringu wspomagana jest przez oprogramowanie komputerowe, które pozwala na sprawne i łatwe śledzenie procesu uszczelniania.
EN
The Mine Shafts Sealing Technology was developed by the Wieliczka Salt Mine as part of the project: “Development of the mine shafts sealing technology by the Wieliczka Salt Mine subsidised by EU funds under the Operational Programme Innovative Economy 1.4. and in cooperation with the Faculty of Drilling, Oil and Gas of the AGH University of Science and Technology. This technology takes advantage of the latest drilling methods and patented sealing pastes with increased resistance to aggressive environments compared to standard binding agents. The technology also uses a mobile visual monitoring system and a system for monitoring the displacement of the shaft lining. The entire monitoring installation is supported by computer software, enabling quick and easy tracking of the sealing process.
PL
W artykule zaprezentowano działania KS „Wieliczka” S.A. przeprowadzone w latach 2010– 2014 w celu ograniczenia zagrożenia wodnego. W 2010 r. oddano do ruchu, wybudowany na powierzchni przy szybie Kościuszko, węzeł iniekcyjny, w którym w zautomatyzowany sposób wytwarzane są mieszaniny iniekcyjne, służące do szczelnej likwidacji wyrobisk. W latach 2010–2014, wykorzystując pracę węzła iniekcyjnego oraz technologię iniekcji rurociągowej, wykonano skuteczną likwidację kilku wyrobisk zagrożonych dopływem wód pozazłożowych, w tym północnej końcówki poprzeczni Mina. W ramach działań ograniczających zagrożenie wodne przeprowadzono, także w tym czasie, likwidację otworów podsadzkowych oraz uszczelnianie szybów. Celem realizowanych prac było odzyskanie szczelności górotworu dla zabezpieczenia kopalni przed bezpośrednimi dopływami lub filtracją wód pozazłożowych do przestrzeni wyrobisk.
EN
The article presents operations performed by the “Wieliczka” Salt Mine in the years between 2010 and 2014 targeted at limiting water hazard. An injecting facility constructed on the surface nearby the Kościuszko Shaft was opened in 2010. The facility is fully automatic and produces injection materials used for watertight elimination of mine workings. In the years between 2010 and 214, the successful elimination of several mine workings threatened by water hazard, caused by outside inflows, was performed by means of the injecting facility and pipeline system injection technology. Among the eliminated mine workings was the northern end of the Mina traverse. The elimination of backfilling openings and sealing of shafts were part of the operations, performed at the same time, aimed at limiting water hazard. The objective of the executed works was to recover rock mass tightness for the purpose of protecting the mine from water inflows and water infiltration occurrences from outside the deposit into mine excavations.
PL
Już niebawem, bowiem 1 stycznia 2016 r., w życie wejdzie nowe rozporządzenie ministra środowiska w sprawie zagrożeń naturalnych w zakładach górniczych. Jakie zmiany przyniesie dla branży surowców skalnych, jakie zagrożenia wodne występują w kopalniach odkrywkowych i jak interpretowane są przez prawo?