The methods of lessening the flood risks by rising the retention basin level, refraining from unco-ordinated buildings in river valleys, renaturalisation of less developed terrain etc. are presented in the paper. The problems of draining off the rain water in urban areas caused by fast urban development and large surface areas being covered with road asphalt and concrete have been outlined.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.