Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 3

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  works technology
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
PL
Budowany w Mozambiku drogowy most Maputo, łączący brzegi Zatoki Maputo, będzie miał najdłuższe przęsło w Afryce. Budowlami towarzyszącymi są estakady dojazdowe, a także drogi i mniejsze mosty południowego regionu tego kraju. Podano dane techniczne oraz opisano najważniejsze problemy projektowe i wykonawcze związane z tym zadaniem.
EN
New road Maputo bridge in Mozambique will connect the banks of Maputo Bay and it will be the bridge with the longest span in this continent. The north and south links, as well new roads and several minor bridges of the southern regions will be associated to the main bridge. The chosen design and construction problems due to this contract are also discussed.
PL
W artykule przedstawiono wyniki pracy, której celem było ustalenie ekonomicznej zasadności stosowania oraz wpływu na żywotność drzew dwóch metod wykonania instalacji podziemnych: wykopów otwartych i przecisków sterowanych. Porównano koszt zastosowania tych metod w przypadku budowy podziemnej kanalizacji sanitarnej w miejscowości Rybno. Wykazano, że realizacja inwestycji metodą tradycyjnych wykopów otwartych obniża wartość drzew. Nie zauważono takiego wpływu w przypadku metody horyzontalnych przewiertów sterowanych. Porównanie symulacji kosztów inwestycji i kosztów pośrednich (dodatkowo towarzyszących danej metodzie) wykazało, że rzeczywisty, rynkowy koszt realizacji metodą bezwykopową (horyzontalnych przewiertów sterowanych) jest o 62 – 68% mniejszy niż metodą wykopów otwartych.
EN
In this paper are presented the results of research in which was compared the economical justification of the traditional methods of excavation and horizontal directional drilling, concerning the value of trees. The evaluation was performed by comparing the costs of engineering infrastructure construction of the two methods in one construction site. It was demonstrated that, when compared to the cost of investment and indirect costs (also accompanying themethod), the actual cost of the excavation method (horizontal directional drilling) is lower about 62 – 68% than the cost of the excavation method. It was also found that the implementation of the investment by traditional open excavation reduces the value of trees. The application of the method of horizontal directional drilling to minimize the negative impact of construction works on the value of trees.
PL
Most zbudowany w 1871 r. ma cztery sklepienia łukowe ceglano-kamienne. Oceniono stan techniczny mostu. Podano sposób jego remontu oraz zakres i technologię wykonanych robót.
EN
The subject of paper is an arch railway bridge located over lławka River in lława. It is four spans vault system about the brick-stone structure. The object was built in 1871. The basic aim of conducted bridge inspection was examine and determine of technical state of particular its elements i. e. load-carrying system, abutments and piers, railway track (pavement), as well as its equipments (handrail, drainage of cornices, etc.) and slopes, accesses to bridge and other devices. The final conclusions concerned the first of all possibility to allowed this bridge to the normal (or limited) service on load of rolling stock.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.