Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!
  • Sesja wygasła!
  • Sesja wygasła!
  • Sesja wygasła!

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  water pipe system design
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The environmental state of rice irrigation systems (RIS) is determined by many factors, including natural ones (soil, topographical, hydrogeological, and climatic factors) and technological ones (irrigation norm, design, and parameters of irrigation and drainage networks, etc). The most significant influence on the ecological reclamation state of the RIS carries is effected by its drainage network (DN). The need to maintain a flushing water regime with specific filtration rates to prevent secondary salinization in the Danube Delta’s rice systems is a crucial aspect of managing these agricultural areas. In the saline areas of rice systems located in the Danube Delta, the DN must ensure the maintenance of the flushing water regime with the rates of filtration ranging between 10 to 12 mm/day. This is a prerequisite for preventing secondary salinization of irrigated lands of these rice systems. According to the results of studies, the filtration from the surface of the irrigation checks of the Danube Delta RIS has been established, and its values in the area of the rice check vary significantly. Different intensity of filtration in the area of rice checks causes the difference in mineralization of groundwater and in the content of salts in the soil. This leads to the fact that the same rice check created various natural reclamation conditions and different productivity of cultivated crops.
EN
The provision of a reliable water-supply system is essential for the development and well-being of urban communities. Samdrupjongkhar Thromde, located in Bhutan, has been facing water supply challenges despite the presence of a water treatment plant. The non-perennial nature of the current water source coupled with malfunctions in water pumps has led to acute water shortages in the municipality. To address this issue, this study carried out a feasibility investigation and designed a gravity water supply system by conducting an EPANET (Environment Protection Agency Network Evaluation Tool) analysis. The study involved field visits to identify potential water sources, and a topographic survey using RTK (Real Time Kinematics) technology to determine the optimal pipeline route. The EPANET analysis was then conducted to evaluate the hydraulic performance of the initial route. Based on these findings, a finalwater pipeline routewas selected considering factors such as terrain characteristics, construction feasibility, avoidance of negative water pressure, and minimum encroachment of private land. The results showed that the maximum pressure head within the pipeline system reached 296 m with a maximum water flow velocity of 5 m/s. However, at the outlet, the pressure head decreased to 70 m and the velocity decreased to 2 m/s. Two Break Pressure Tanks (BPT) were strategically placed to achieve this pressure reduction. The chosen pipe materials and their placement ensure the long-term reliability and functionality of the water supply system, while considering maintenance convenience and terrain characteristics.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.