Ograniczanie wyników
Czasopisma help
Autorzy help
Lata help
Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 41

Liczba wyników na stronie
first rewind previous Strona / 3 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  tunel kolejowy
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 3 next fast forward last
EN
The running speed of high-speed trains in the tunnel is as high as 350 km, which is very sensitive to the construction disturbance of the new shield tunnel. Therefore, it is of positive significance to study the influence of shield tunneling on existing high-speed railway lines and tunnel structures and control standards. Combined with centrifuge test and three-dimensional numerical simulation, the dynamic response of shield tunnel undercrossing existing high-speed railway tunnel is studied, and the influence of settlement joint and steel pipe pile reinforcement on existing tunnel is analyzed. Studies have shown that the existence of existing tunnels will reduce the surface settlement caused by tunnel excavation, but this shielding effect will be reduced if the influence of construction joints is considered. Therefore, if the construction joint is not considered in the numerical calculation, the ground deformation will be underestimated and the mechanical performance of the existing tunnel structure will be overestimated. In addition, steel pipe piles can effectively control the settlement of existing tunnels.
PL
Ogłoszony przez ZDiM Miasta Lublin w 2017 r. przetarg na budowę nowego odcinka drogi łączącej ul. Kunickiego z ul. Wrotkowską w Lublinie zakładał również budowę bezkolizyjnego skrzyżowania z bocznicą kolejową. Przedmiotem artykułu jest właśnie ten to bardzo interesujący z punktu widzenia inżynierskiego obiekt.
EN
The optimization process of design parameters for composite lining of heavy haul railway tunnel is a key problem to be solved in tunnel engineering design. In order to put forward a better design scheme of composite lining for heavy haul railway tunnel, combined with field measurement and numerical simulation, the optimal working condition design is carried out by changing the thickness of shotcrete layer, the type of grid steel frame and the thickness of secondary lining. The influence of the above design parameters on the stress state of the composite lining is analyzed to obtain the optimal design parameters. Finally, the safety performance of the optimized lining is evaluated by the ultimate bearing capacity curve of the secondary lining section. The research shows that: 1) The optimal design parameters of the composite lining of the tunnel are the thickness of the shotcrete layer of 25 cm, the type of the grid steel frame of H180, the thickness of the secondary lining arch waist and the side wall of 40 cm and 35 cm respectively; 2) Different from the single-track heavy haul railway tunnel, the displacement value of the vault settlement of the double-track heavy haul railway tunnel is significantly greater than that of the inner convergence. Increasing the thickness of the shotcrete layer and changing the type of the grid steel frame have better effects on reducing the vault settlement, and have little effect on the inner convergence.
EN
This paper presents a method for modeling the ground vibrations from a railway tunnel in layered unsaturated soil, considering the uncertainty and spatial variability of soil parameters. A deterministic ground vibration prediction model, which is an improved Euler beam model, is developed to evaluate the vibrations for a tunnel in layered unsaturated soil. Furthermore, the spatial variability of soil parameters is simulated by random fields using the Monte Carlo theory and the middle point method of Cholesky decomposition. By coupling the random fields of soil parameters to the deterministic vibration prediction model, the effect of uncertainty and spatial variability of soil on the ground vibrations is demonstrated through a case study. It is found that the variability of soil parameters has little influence on the spatial distribution regularities of ground vibrations, but it has a significant effect on the dynamic response amplitude and the critical velocity of the system.
5
Content available remote Koncepcja kolejowej trasy średnicowej we Wrocławiu w celu uruchomienia sieci SKM
PL
W artykule przedstawiono propozycję budowy kolejowej trasy średnicowej we Wrocławiu w celu utworzenia sieci szybkiej kolei miejskiej. Główną motywacją dla utworzenia sieci SKM jest stale rosnący ruch w kierunku centrum spowodowany coraz bardziej rosnącą liczbą osób zamieszkujących peryferyjne części miasta oraz gmin ościennych tworzących aglomerację wrocławską. Jako przykład sprawnie funkcjonującej sieci szybkiej kolei miejskiej wykorzystującej tunel średnicowy przytoczono sieć S – Bahn w Monachium, w której wykorzystywany tunel kolejowy przebiegający przez centrum miasta determinuje duże potoki pasażerów i jest to w związku z tym jeden z głównym środków transportu na obszarze całej aglomeracji. W dalszej części omówiono pokrótce stan obecny Wrocławskiego Węzła Kolejowego pokazując tym samym duży potencjał miasta do utworzenia sieci SKM. Wskazano miejsca, w których należałoby zapewnić bezpośredni dostęp do sieci kolejowej. Zaproponowano utworzenie dwóch tras średnicowych w całości przebiegających z tunelu. Ich przebieg powinien być podyktowany lokalizacją wskazanych w artykule generatorów ruchu w centrum Wrocławia. W podsumowaniu autor przedstawia korzyści idące za budową nowych tras oraz wspomina o potrzebie rozwoju sieci transportu szynowego wynikającej z Wrocławskiej Polityki Mobilności. Utworzenie nowej trasy przebiegającej przez centrum miasta w znaczący sposób zwiększyłoby atrakcyjność przewozową kolei a co za tym idzie, nowa trasa stanowiłaby kluczowy element dla utworzenia sprawnie funkcjonującej sieci SKM na terenie miasta oraz całej aglomeracji wrocławskiej.
EN
The article presents a proposal for the construction of a cross-city rail route in Wrocław in order to create a LRT system. The main motivation for the creation of the LRT system is the constantly growing traffic towards the center caused by the increasing number of people living in the peripheral parts of the city and neighboring municipalities making up the Wrocław agglomeration. As an example of an efficient LRT system using a cross-city tunel is the S-Bahn system in Munich was cited, in which the railway tunnel running through the city center determines large flows of passengers and is therefore one of the main means of transport in the entire agglomeration. In the next part, the current state of the Wrocław Railway Junction is briefly discussed, thus showing the city's great potential to create the LRT system. Places where direct access to the railway network should be provided have been indicated. It was proposed to create two cross-diameter routes running entirely from the tunnel. Their course should be dictated by the location of the traffic generators indicated in the article in the center of Wrocław. In the summary, the author presents the benefits of building new routes and mentions the need for the development of the rail transport network resulting from the Wrocław Mobility Policy. The creation of a new route running through the city center would significantly increase the transport attractiveness of the railways, and thus, the new route would be a key element for the creation of an efficiently functioning LRT system in the city and the entire Wrocław agglomeration.
Mosty
|
2019
|
nr 5
38--40
PL
W Łodzi powstanie tunel kolejowy biegnący pod centrum miasta – na trasie Łódź Fabryczna – Łódź Kaliska/Łódź Żabieniec. Jest to inwestycja w ramach projektu budowy Łódzkiego Węzła Kolejowego, który ma połączyć główne stacje kolejowe w mieście.
9
Content available remote Budowa tunelu kolejowego pod wiaduktami metodą podstropową
10
Content available remote Ukrainę i Unię Europejską połączy tunel kolejowy
PL
Tunel Beskidzki na Ukrainie, stanowiący połączenie kolejowe pomiędzy Lwowem a miastem Chop, jest usytuowany w pobliżu zbiegu granic Ukrainy, Węgier i Słowacji. Obiekt wymagał jednak szeroko zakrojonej modernizacji, by dalej mógł spełniać swoją funkcję. Innym wyjściem było podjęcie budowy nowego tunelu.
PL
Gdy warunki geologiczne są zmienne, a siatka sondowań czy odwiertów badawczych stosunkowo rzadka, zdarza się, że trzeba korygować zaprojektowane rozwiązanie w zależności od rzeczywistych warunków gruntowych poprzez tzw. aktywne projektowanie. Tak też było na budowie w Norwegii, gdzie wdrożono nieprzewidziane wcześniej działania.
EN
Follo Line Project is one of the greatest currently conducted infrastructural project in Norway; its investor is a state-owned company responsible for the national railway infrastructure, Jernbaneverket. This undertaking includes building 22 kilometres of a new railway tracks between Oslo and Ski - the line will go through the tunnel for 20 kilometres out of 22. The author presents the project, analysing the necessary geotechnical works.
12
Content available Wielofunkcyjny kompleks Forum Gdańsk
PL
W centrum Gdańska w ramach rewitalizacji Targu Siennego i Targu Rakowego na sześciohektarowym obszarze powstaje wielofunkcyjny kompleks z nowoczesną przestrzenią handlowo-usługową, biurową i publiczną – Forum Gdańsk. Łączny koszt tej inwestycji, obejmujący także rozwiązania komunikacyjne, wyniesie ok. 800 mln zł. Główny budynek będzie stanowiła galeria handlowa, w innym gmachu powstanie Centrum Dziedzictwa Historycznego Miasta Gdańsk, nad torami kolejowymi wielopoziomowy parking, a w kolejnym budynku przestrzenie biurowe. W środku inwestycji przepływać będzie kanał Raduni, zabudowany przeszklonym dachem na wysokości 17 m.
EN
In the centre of Gdańsk, a multifunctional complex of Forum Gdańsk with modern retail, office and public space is under construction as part of the revitalization of Targ Sienny and Targ Rakowy. The total cost of the project, including transportation solutions, will be approx. PLN 800 million.
13
Content available Tunel Św. Gotarda otwarty
PL
Mówi się, że Szwajcarzy lubią być punktualni i dlatego uwielbiają drogi na skróty. Abstrahując od motywacji, największy projekt budowlany w historii Szwajcarii – tunel św. Gotarda (niem. Gotthard-Basistunnel, ang. Gotthard Base Tunnel), robi ogromne wrażenie. Tunel leży w samym środku New Rail Link through the Alps (NRLA), czyli nowej linii kolejowej biegnącej przez Alpy i łączącej Włochy ze Szwajcarią.
EN
On 01 June 2016, after 17 years of construction, the longest and deepest railway tunnel in the world was officially opened. The construction of the 57-km colossus cost CHF 12.2 thousand million.
EN
Railway tunnel inspection and monitoring has predominantly been a visual and manual procedure, which is time-consuming and subjective, giving rise to variance in standards and quality. Thus, alternative, novel, automated techniques need to be developed, for more efficient and reliable tunnel examination. The reported research aimed to investigate the application of a laser scanning technique for the inspection of tunnel degradation and structural integrity. The proposed method may either substitute or supplement traditional survey techniques, being more efficient, and contributing thus to the standardisation of tunnel inspections. For the purpose of investigating the applicability and accuracy of laser scanning in tunnels, a set of tunnel lining models was constructed for laboratory tests, with the objective of determining the quality of the imaging. Initial tests were carried out using a performant laser scanner and demonstrated the feasibility of the concept. As a result, refined laboratory models were built, and experiments conducted, to establish the quality and precision of laser scanning imaging, for condition monitoring of tunnels. The experimental results indicate that the laser scanning technique used in this research has high potential for detecting the tunnel condition, monitoring the depth of weathered mortar, spalling bricks etc. with high accuracy in static scanning mode.
PL
Kontrola i monitoring tuneli kolejowych w przeważającej mierze to procedura, która jest czasochłonna i subiektywna, co powoduje zróżnicowanie standardów i jakości badań. Stąd też muszą być opracowane alternatywe, nowoczesne, zautomatyzowane techniki do bardziej skutecznych i rzetelnych badań. Przedstawione badania miały na celu wskazanie zastosowania techniki skanowania laserowego do kontroli degradacji tunelu i integralności strukturalnej. Proponowana metoda może zastąpić, bądź uzupełnienić, tradycyjne techniki pomiarowe. Jest ona bardziej wydajna i może przyczynić się do standaryzacji kontroli tuneli. Aby zbadać przydatności i dokładności skanowania laserowego w tunelach, skonstruowano zestaw modeli do testów labolatoryjnych, w celu określenia jakości obrazów. Wyniki doświadczalne wskazują, że technika skanowania laserowego zastosowana w badaniu ma wysoki potencjał do charakteryzowania stanu tunelu, monitorowania głębokości zwietrzenia zaprawy, odpryskiwania cegieł itp., z dużą dokładnością w trybie statycznym skanowania.
15
Content available remote Trwałość i niezawodność systemów masowo – sprężystych w torze kolejowym
PL
Środki ochrony stosowane bezpośrednio u źródła emisji drgań zazwyczaj są łatwiejsze i tańsze w realizacji, szczególnie w przypadku budowy nowego torowiska lub modernizacji torowiska. Doposażenie istniejącego torowiska w elementy izolacji generalnie jest możliwe, ale może okazać się dość skomplikowane i pociąga za sobą dodatkowe koszty. Dlatego najkorzystniej jest planować użycie stosownych zabezpieczeń w torowiskach nowych lub remontowanych. System masowo-sprężysty, w którym stosuje się odpowiednie elementy elastyczne spełniające wysokie standardy, chociaż na wstępie wymaga nakładów fi nansowych, może prowadzić do znacznie lepszych i długotrwałych rezultatów. Potwierdzają to badania przeprowadzone na istniejących obiektach budowlanych, gdzie wbudowane elementy wibroizolacyjne były faktycznie eksploatowane przez okres wielu lat, dzięki czemu można uznać je za najbardziej miarodajne.
EN
With a growing conventional wisdom and requirements concerning protection of human environment of living and increasing a comfort in working and resting space, an aspect of protection against excessive vibroacoustic effects as vibrations and noise becomes more significant. Taking into account an idea of balanced development, which is nowadays promoted in civil engineering, solutions in a field of protection measures against these influences should ensure long-term social and economical benefits. In this paper we bring up a subject of protection against vibrations and secondary structure-borne noise that may affect people in buildings and buildings itselves, which are located in close neighborhood of railway line in tunnel. Special attention is paid to durable and constant effectiveness of applied solution of a railway track vibroisolation using heavy mass-spring system. This isolation efficiency is confirmed by comparative experimental measurements.
EN
The article presents way of fast 3D monitoring of railway tunnels. Safety of railway tunnels requires that the geometry of tacks and surrounding infrastructure will be faultless. Changes in the tunnel shape geometry may by following by laser scanning and infrared method. Laser scanning allows to measure up to 1000000 points per second. Which means it can measure almost everything that is within its range. Thermal pictures represents the radiation in inferred range produced by the measured object. Survey was done in one of the longest railway tunnels in Poland near Tunel station. Also results of measurements in an experimental mine “Sztygarka”, where shape of corridors and its size resemble the conditions found in railway tunnels, are presented.
PL
Artykuł przedstawia sposób szybkiego monitorowania 3D struktury tuneli kolejowych. Bezpieczeństwo w tunelach wymaga zachowania ich dokładnej geometrii i stabilności otoczenia. Zmiany w kształcie geometrii tunelów mogą być śledzone za pomocą takich metod jak skaning laserowy i obrazowanie w podczerwieni. Skanowanie laserowe pozwala na pomiar do 1000000 punktów na sekundę. Oznacza to, że może mierzyć prawie wszystko co jest w jego zasięgu. Zdjęcie termiczne w podczerwieni przedstawia skalę promieniowania emitowanego przez badane obiekty. Przedstawione badania były wykonane w jednym z najdłuższych tuneli kolejowych w Polsce. Zaprezentowane także wyniki pomiarów wykonanych w sztolni „Sztygarka”, która pod względem wymiarów i kształtu jest podobna do tunelu kolejowego.
17
Content available remote Drogowo-kolejowy tunel połączy Niemcy i Danię w 2021 r.
EN
For a few years now, thorough preparations have been conducted for the construction of a tunnel between the Danish Lolland island and the German Fehmarn town, in order to make continental Europe more easily accessible for Scandinavia. It is planned that the rail and road link will be made available for traffic in 2021. The embedded tunnel will be 19 km long. The works on this project will be divided into several separate contracts. Currently, the investor is analysing technological solutions proposed by the potential contractors.
PL
Do 2012 r. Danię i Niemcy ma połączyć tunel drogowo-kolejowy. Zatapiany tunel będzie mieć długość około 19 km. Prace w ramach tego projektu zostaną podzielone na kilka osobnych kontraktów. Obecnie inwestor analizuje rozwiązania technologiczne proponowane przez potencjalnych wykonawców.
18
Content available remote Analiza bezpieczeństwa pożarowego w tunelach drogowych i kolejowych
PL
W artykule zamieszczono analizę dokumentów i wymagań krajowych oraz wymagań zawartych w dyrektywach Unii Europejskiej dotyczących zagadnień bezpieczeństwa w tunelach, ze szczególnym uwzględnieniem bezpieczeństwa pożarowego tuneli drogowych oraz tuneli kolejowych. Przepisy polskie określają wymagania dotyczące bezpieczeństwa pożarowego w sposób bardzo ogólny. W artykule analizie poddano również problemy, z jakimi spotykają się projektanci i wykonawcy na etapie projektowania, wykonawstwa i oddania do użytku oraz podstawowe kierunki zmierzające do zapewnienia akceptowalnego poziomu bezpieczeństwa pożarowego użytkowników tuneli drogowych oraz kolejowych.
EN
The article contains the analysis of documents and national requirements and the requirements included in the EU directives on safety issues in the tunnels, with particular emphasis on fire safety of road tunnels and rail tunnels. Polish regulations specify requirements for fire safety in a very general way. The article also analyzed the problems faced by designers and contractors at the stage of designing, construction and putting into operation and the basic directions aimed at ensuring an acceptable level of fire safety of the users of road and rail tunnels.
PL
W artykule przedstawiono koncepcję budowy tuneli kolejowych pod cieśninami Bosfor i Beringa jako elementów światowych korytarzy transportowych. Dokonano klasyfikacji tuneli i opisano metody ich budowy. Szczególnie wiele miejsca poświęcono omówieniu projektu Marmaray, na podstawie którego budowany jest tunel pod cieśniną Bosfor. Zaprezentowano poszczególne etapy budowy i korzyści wynikające z realizacji tej inwestycji.
EN
The article presents the concept railway tunneling under the Bosphorus and Bering straits, and as elements of the global transport corridors. Performed classification of tunnels and describes their construction methods. Especially a lot of space is devoted to the discussion of the Marmaray project, on the basis of which the tunnel under the Strait of Bosphorus is being built. Learn the different stages of construction and the benefits resulting from the implementation of this investment.
PL
Wymagania w zakresie reakcji na ogień i odporności ogniowej stawiane wyrobom budowlanym i elementom stosowanym w tunelach odnoszone są do systemu klasyfikacji stosowanego w budynkach. W przypadku reakcji na ogień to podejście jest właściwe, ponieważ ważny jest tylko poziom spełnienia wymagań. W przypadku odporności ogniowej może to być dyskusyjne, ponieważ w przypadku tuneli należy brać pod uwagę inny poziom oddziaływania termicznego. Winnych krajach Unii Europejskiej do oceny odporności ogniowej elementów konstrukcyjnych tuneli wykorzystywane są inne krzywe czas-temperatura, definiujące ostrzejsze oddziaływania termiczne niż krzywa standardowa.
EN
The requirements of reaction to fire and fire resistance for construction products and elements used in tunnels are related to classification system used in buildings. In case of reaction to fire this approach is relevant, because only the level of the requirements fulfillment is important. In case of fire resistance this may be questionable as in case of tunnels another level of thermal exposure shall be taken into account. In different Member States the different time temperature curves, defining more severe exposure than the standard curve, are used in order to assess fire resistance of tunnel structural elements.
first rewind previous Strona / 3 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.