The use of explosives to excavate rock in open-cast mining induces vibrations in the surrounding area, which may impact nearby structures. As early as the 1960s, time-delayed firing of successive EM charges was introduced, which dramatically improved both the quality of excavation (fragmentation and shape of the dump) and reduced the intensity of vibrations propagated to the environment. Through the use of increasingly new developments in millisecond firing (nonelectrical and electronic systems), a wide range of possibilities for controlling the seismic effect has been achieved. A very important parameter of the induced vibrations is the structure of their frequency, achange of which can decisively influence the mechanism of vibration transmission from the ground to the structures and the impact assessment. As the seismic effect depends significantly on the geological conditions of both the deposit and the surrounding area, the analysis of vibrations induced from the detonation of single EM charges (signature hole (SH) method) best characterises these conditions. This paper presents the results of a study on the control of the structure of vibrations induced by the firing of EM charges using an electronic initiation system and the influence of the structure of these vibrations on the interaction of the building-ground system. The application of millisecond delay selection procedures to the design of blasting operations for the firing of EM charges, allows inducing vibrations with a favourable structure, resulting in strong attenuation during the transition from the ground to the objects.
PL
Użycie materiałów wybuchowych do urabiania skał w górnictwie odkrywkowym wzbudza w otoczeniu drgania, które mogą oddziaływać na zlokalizowane w pobliżu obiekty budowlane. Już w latach 60. ubiegłego stulecia wprowadzono odpalanie kolejnych ładunków MW z opóźnieniem czasowym, co w zdecydowany sposób poprawiło zarówno, jakość urabiania (rozdrobnienie i kształt usypu) jak i obniżyło intensywność drgań propagowanych do otoczenia. Przez zastosowanie coraz nowszych rozwiązań w zakresie milisekundowego odpalania (systemy nieelektryczne i elektroniczne) uzyskano szerokie możliwości sterowania efektem sejsmicznym. Bardzo ważnym parametrem wzbudzanych drgań jest ich struktura częstotliwościowa, której zmiana może w zdecydowany sposób wpływać na mechanizm przenoszenia drgań z podłoża do obiektów budowlanych i ocenę oddziaływania. Ponieważ efekt sejsmiczny w istotny sposób zależy od warunków geologicznych zarówno złoża jak i otoczenia, analiza drgań wzbudzanych od detonacji pojedynczych ładunków MW (metoda signature hole (SH)) najlepiej charakteryzuje te warunki. W artykule przedstawiono wyniki badań nad sterowaniem strukturą drgań wzbudzanych w czasie odpalania ładunków MW z zastosowaniem elektronicznego systemu inicjowania oraz wpływem struktury drgań na interakcję układu budynek-podłoże. Zastosowanie do projektowania robót strzałowych procedur związanych z doborem opóźnienia milisekundowego do odpalania ładunków MW, pozwala na wzbudzanie drgań o korzystnej strukturze, dzięki czemu uzyskuje się silne tłumienie przy przejściu z podłoża do obiektów.
PL
Wprowadzenie do stosowania w polskim górnictwie elektronicznego systemu inicjowania ładunków MW, zdecydowanie zwiększyło możliwości doboru optymalnego opóźnienia milisekundowego. Korzystnie wpłynęło również na poszerzenie zakresu projektowania wielootworowych siatek strzałowych, z użyciem programów komputerowych. Kilkuletnie doświadczenie uzyskane w oparciu o prace badawcze prowadzone wspólnie przez Laboratorium Robót Strzałowych i Ochrony Środowiska KGO AGH oraz firmy Austin Powder Polska Sp. z o.o., pozwoliło na wypracowanie procedury doboru optymalnego opóźnienia milisekundowego poprzez wybór właściwego rozwiązania (wariantu) symulowanego przez program komputerowy. W oparciu o wypracowaną procedurę, w artykule przedstawiono wyniki badań uzyskanych w kopalni margli podczas odpalania ładunków MW ułożonych w jednym szeregu. Dla tych warunków oraz mając na uwadze skomplikowaną strukturę drgań, głównym celem badań było zaprojektowanie optymalnych opóźnień milisekundowych, których zastosowanie umożliwi osiągnięcie jak najniższej intensywności drgań przy jednoczesnym modulowaniu częstotliwości tych drgań, w kierunku uzyskania korzystnej struktury w aspekcie oceny oddziaływania na budynki zgodnie z normą PN-B-02170:2016-12. Na podstawie przeprowadzonych badań udało się uzyskać pozytywne efekty, ale również wskazać dalsze możliwości wprowadzenia zmian w technice wykonywania robót strzałowych.
EN
The introduction to the use in the Polish mining of an electronic system for initiating explosive charges significantly increased the possibilities of selecting the optimal millisecond delay. It was also beneficial for expanding the design possibilities of multi-hole blasting patterns, using computer programs. Several years of experience gained by research carried out jointly by the Research Laboratory of Blasting Works and Environmental Protection AGH, and Austin Powder Polska LLC has allowed to work out the procedure of selecting the optimal millisecond delay by choosing the right solution (variant) simulated by the software. Based on the developed procedure, the article presents the results of field tests obtained in the marl mine using a single row blasting. For these conditions and having in mind the complex vibration structure, the primary goal of the research was to design optimal millisecond delays, application of which will allow achieving the lowest vibration intensity while modulating the frequency of these vibrations, in order to obtain a favorable structure in the aspect of impact assessment on buildings in accordance with PN-B-02170:2016-12. Based on the test results, positive effects were obtained, but also further possibilities of introducing changes in the technique of blasting works were indicated.
3
Content available remote Control of the vibration structure induced during works with the use of explosives
EN
This article presents the results of research on controlling the structure of vibrations induced during the firing of explosives with the use of non-electrical and electronic systems and the influence of the vibration structure during a transition from the ground to the building. The use of procedures associated with the selection of millisecond delay for firing explosive charges during blasting allows to get the excitation of favourable structure vibrations, thanks to a strong damping which is obtained at the transition from the ground to the structure. This means that optimally designed blasting works do not have to limit the mass of the explosives in the borehole as well as their number.
PL
W artykule przedstawiono wyniki badań nad sterowaniem strukturą drgań wzbudzanych w czasie odpalania ładunków MW z zastosowaniem systemów nieelektrycznych i elektronicznych oraz wpływem struktury drgań na interakcję układu budynek-podłoże. Zastosowanie do projektowania robót strzałowych procedur związanych z doborem opóźnienia milisekundowego do odpalania ładunków MW pozwala na wzbudzanie drgań o korzystnej strukturze, dzięki czemu uzyskuje się silne tłumienie przy przejściu z podłoża do obiektów. Oznacza to, że optymalnie zaprojektowane roboty strzałowe nie muszą ograniczać masy ładunków MW w otworze oraz ich liczby.
4
Content available remote Control of the vibration structure induced during works with the use of explosives
EN
This article presents the results of research on controlling the structure of vibrations induced during the firing of explosives with the use of non-electrical and electronic systems and the influence of the vibration structure during a transition from the ground to the building. The use of procedures associated with the selection of millisecond delay for firing explosive charges during blasting allows to get the excitation of favourable structure vibrations, thanks to a strong damping which is obtained at the transition from the ground to the structure. This means that optimally designed blasting works do not have to limit the mass of the explosives in the borehole as well as their number.
PL
W artykule przedstawiono wyniki badań nad sterowaniem strukturą drgań wzbudzanych w czasie odpalania ładunków MW z zastosowaniem systemów nieelektrycznych i elektronicznych oraz wpływem struktury drgań na interakcję układu budynek–podłoże. Zastosowanie do projektowania robót strzałowych procedur związanych z doborem opóźnienia milisekundowego do odpalania ładunków MW, pozwala na wzbudzanie drgań o korzystnej strukturze, dzięki czemu uzyskuje się silne tłumienie przy przejściu z podłoża do obiektów. Oznacza to, że optymalnie zaprojektowane roboty strzałowe nie muszą ograniczać masy ładunków MW w otworze oraz ich liczby.
PL
W artykule przedstawiono procedurę komputerowej optymalizacji opóźnień milisekundowych, przy obecnie stosowanych nowoczesnych, elektronicznych systemach inicjowania w firmie Austin Powder, w oparciu o dane pozyskiwane z odpalania pojedynczych ładunków materiału wybuchowego. Taki tok postępowania daje możliwość weryfikacji, poprzez pomiary rzeczywiste, przyjętego przez projektanta modelu symulacji wieloszeregowych siatek strzałowych.
EN
The use of explosives to extract resources in rock material mines is necessarily associated with the use of an appropriate initiation system that allows for the firing of explosive charges with a time delay (millisecond). Such a method of charges detonation gives a wide range of possibilities when designing multi-row blasting patterns, and at the same time, it has a positive effect on the minimization of the blasting impact on buildings in the vicinity of mines. Selecting the right millisecond delay should be based primarily on the seismograms recorded during the firing of singular blasthole and the analysis of the vibrations frequency structure. The article presents the procedure of computer-based optimization of millisecond delay, with today’s modern, electronic initiation systems, based on data derived from firing a singular blasthole. This approach allows to verify, by means of real measurements, the simulation model (predicted values) of the multi-row blasting patterns accepted by a designer.
PL
Używanie materiałów wybuchowych do urabiania złóż w kopalniach surowców skalnych nieodzownie wiąże się z zastosowaniem odpowiedniego systemu inicjowania, umożliwiającego odpalenie ładunków MW z opóźnieniem czasowym (milisekundowym). Taki sposób detonacji ładunków daje szerokie możliwości przy projektowaniu wieloszeregowych siatek strzałowych, a jednocześnie wpływa korzystnie na minimalizację oddziaływania robót strzałowych na zabudowania w otoczeniu kopalń. Dobór właściwego opóźnienia milisekundowego powinien bazować na sejsmogramach drgań wzbudzanych w czasie odpalania pojedynczych ładunków MW i analizie struktury tych drgań. W artykule przedstawiono wyniki z pierwszych prac badawczych opartych na zastosowaniu milisekundowej zapalarki ZT 480t, skonstruowanej na przełomie lat 80. i 90. w Instytucie Górnictwa Odkrywkowego AGH. Spostrzeżenia z przeprowadzonych doświadczeń stały się przyczynkiem do kontynuacji prac wskazujących na konieczność budowy systemów odpalania ładunków MW, które pozwolą na szerszy wybór opóźnień milisekundowych, a tym samym dadzą możliwość modyfikacji struktury wzbudzanych drgań. Wymiernym efektem prowadzonych badań było dopuszczenie, w roku 1994, do stosowania w górnictwie odkrywkowym zapalarki milisekundowej EXPLO-201, również skonstruowanej w Instytucie Górnictwa Odkrywkowego AGH. Komputerowa optymalizacja opóźnień milisekundowych, przy obecnie stosowanych, nowoczesnych, elektronicznych systemach inicjowania, bazuje właśnie na danych pozyskiwanych z odpalania pojedynczych ładunków MW. Jak widać, spostrzeżenia z badań prowadzonych w ubiegłym wieku są nadal aktualne i stanowią mocną podstawę dla obecnie projektowanych robót strzałowych.
EN
The use of explosives to extract resources in rock material mines is necessarily associated with the use of an appropriate initiation system that allows the firing of explosive charges with a time delay (millisecond). Such a method of charges detonation gives a wide range of possibilities when designing multi-row blasting patterns, and at the same time, it has a positive effect on the blasting impact minimization on buildings in the vicinity of mines. The selection of the right millisecond delay should be based on the seismograms recorded during the firing of a singular blasthole and the analysis of the vibrations structure. This paper presents the results of the first research which included the application of millisecond blaster ZT 480t, constructed at the turn of the 80s and 90s, at the Institute of Open Mining AGH. Observations from the experience have contributed to the continuation of the pursue which indicates the need to build firing systems that will allow a wider selection of millisecond delay and thus allow for the possibility of modifying the structure of the induced vibrations. The tangible outcome of the research in 1994 was the authorization of the EXPLO-201 blaster for mining, also constructed at the Open Mining Institute AGH. Computer-based optimization of millisecond delay, with today’s modern, electronic initiation systems, is based on data derived from firing a singular blasthole. As shown, observations from the research conducted in the last century are still valid and provide a strong basis for the currently planned blasting.
PL
W artykule wskazano na konieczność weryfikacji efektu sejsmicznego robót strzałowych prowadzonych w kopalni odkrywkowej. Do odpalania ładunków MW zastosowano system elektroniczny, a w celu doboru optymalnego opóźnienia milisekundowego wykonano symulacje komputerowe w oparciu o przeprowadzone pomiary intensywności drgań wzbudzanych pojedynczymi ładunkami MW. Umożliwiło to zweryfikowanie pomiarem rzeczywistym wartości prognozowanych uzyskanych w procesie projektowania. Analizę intensywności i struktury wzbudzanych drgań przeprowadzono wykorzystując filtrowanie tercjowe. Dokonano również oceny wpływu zarejestrowanych drgań na obiekty budowlane za pomocą skal SWD.
EN
This paper presents the necessity of blasting work effect verification. The analysis was performed on the basis of data gathered from ground born vibration monitoring which was applied in the surroundings of one of the open pit mines. Electronic detonators were applied in blasting works. Delay time optimization was done, based on the computer simulation which uses data obtained from the single borehole blasting. This approach allows to verify the presumptive ground born vibration intensity by a field measurement. Ground born vibration analysis was done on the basis on the Octave analysis. The evaluation of the ground born vibration impact on the concrete structure was included in this paper.
EN
Environmental Protection Law together with Geological and Mining Law impose on a mining plant a duty to protect its surroundings against the effects of mining operations. It also refers to the impact of vibrations on people and buildings induced by blasting works. Effective protection is possible only if the actual level of the impact is known, hence it has to be recorded. It was and still is the keynote idea of the research conducted at the AGH Laboratory of Blasting and Environmental Protection. The effect of many years of research is the development of an original and, in particular, an effective procedure to record the impact of blasting works with periodical measurements of vibration intensity or monitoring the vibrations' impact on buildings in the surrounding area. These assumptions form part of preventive actions taken by open pit mines, which are aimed at minimizing the impact of blast workings on the surroundings and are often recommended by experts. This article presents the course of action concerning control tests of vibration intensity in the surroundings of a mine. It also shows it is necessary to monitor vibrations in buildings as it is a source of knowledge for the mining plant management personnel and engineers who conduct blasting works, thus contributing to an increase in awareness of the responsible management of a mining plant. The Vibration Monitoring Station (KSMD) developed by a research group, after several upgrades, has become a fully automated system for monitoring and recording the impact of blast workings on the surroundings. Moreover, it should be emphasised that without the mine management personnel's cooperation, it would be impossible to work and achieve the common goal, i.e. conducting blasting works in a way that is safe for the surroundings.
PL
Stosowanie materiałów wybuchowych do urabiania złóż w kopalniach surowców skalnych nieodzownie wiąże się z zastosowaniem odpowiedniego systemu inicjowania, umożliwiającego odpalenie ładunków materiału wybuchowego z opóźnieniem czasowym (milisekundowym). Taki sposób detonacji ładunków daje szerokie możliwości przy projektowaniu wieloszeregowych siatek strzałowych, a jednocześnie wpływa korzystnie na minimalizację oddziaływania robót strzałowych na zabudowania w otoczeniu kopalń. Dobór właściwego opóźnienia milisekundowego powinien bazować przede wszystkim na sejsmogramach drgań wzbudzanych w czasie odpalania pojedynczych ładunków materiału wybuchowego i analizie struktury częstotliwościowej tych drgań. W artykule przedstawiono procedurę komputerowej optymalizacji opóźnień milisekundowych, przy obecnie stosowanych, nowoczesnych, elektronicznych systemach inicjowania, w oparciu o dane pozyskiwane z odpalania pojedynczych ładunków materiału wybuchowego. Taki tok postępowania daje możliwość weryfikacji, poprzez pomiary rzeczywiste, przyjętego przez projektanta modelu symulacji (wartości prognozowanych) wieloszeregowych siatek strzałowych. Należy zaznaczyć, że zarówno zmienność warunków geologiczno-górniczych kopalni jak również liczba czynników mających wpływ na efekt wykonywanych robót strzałowych, stwarza konieczność budowania szerokiej bazy informacji dla programu komputerowego. Wskazano również, jako ważny efekt zastosowanej procedury projektowania, możliwość zminimalizowania oddziaływania drgań wzbudzanych w czasie robót strzałowych, do poziomu drgań pomijalnych w ocenie wpływu na budynek. Ponadto możliwość elastycznego projektowania opóźnień milisekundowych w elektronicznych systemach inicjowania, przy wsparciu programów komputerowych stanowi także duży potencjał dla optymalizacji i sterowania efektami robót strzałowych w zakresie uzyskiwania pożądanej granulacji urobku.
EN
The use of explosives to extract resources in rock material mines is necessarily associated with the use of an appropriate initiation system that allows the firing of explosive charges with a time delay (millisecond). Such a method of charges detonation gives a wide range of possibilities when designing multi-row blasting patterns, and at the same time, it has a positive effect on the blasting impact minimization on buildings in the vicinity of mines. Selecting the right millisecond delay should be based primarily on the seismograms recorded during the firing of singular blasthole and the analysis of the vibrations frequency structure. The article presents the procedure of computer-based optimization of millisecond delay, with today's modern, electronic initiation systems, is based on data derived from firing a singular blasthole. This approach allows to verify, by means of real measurements, the simulation model (predicted values) of the multi-row blasting patterns accepted by the designer. It should be noted that both the variability of the geological and mining conditions of the mine as well as the number of factors influencing the effect of the blast works make it necessary to build a broad database of information for the computer program. It was also indicated as an important effect of the design procedure, the possibility of minimizing the impact of vibration induced during blasting, to the level of negligible vibrations in the impact assessment on the building. In addition, the ability to flexibly design the millisecond delay in electronic initiation systems with the help of computer programs is also a great potential for optimizing and controlling the effects of blast works to achieve the desired granulation of the output.
PL
Stosowanie, do odpalania ładunków MW, nowoczesnych systemów inicjowania, wiąże się niewątpliwie z poszerzeniem zakresu doboru właściwych opóźnień milisekundowych oraz uzyskania jak największej precyzji zadawania czasu odpalania. Stwarza to szerokie możliwości dla masowego urabiania skał metodą długich otworów. Należy jednak zdawać sobie sprawę z tego, że odpalanie milisekundowe jest źródłem sygnałów sejsmicznych wzbudzanych kolejno w określonych odstępach czasu, co powoduje zmiany przebiegów falowych, wpływając tym samym na strukturę częstotliwościową drgań. Z uwagi na to, że w kopalniach ładunki MW odpalane są bardzo często w kilku surowcach o różnych właściwościach sprężystych, wzbudzany detonacją sygnał sejsmiczny dochodzący do stanowiska pomiarowego (obiektu chronionego) może być modyfikowany w wyniku przechodzenia przez różne warstwy. Tym samym, zmienia się jego intensywność i struktura częstotliwościowa. Dlatego tak ważne jest rozpoznanie charakterystyki drgań podłoża poprzez odpalanie pojedynczych ładunków MW. Wzbudzone w wyniku tego sygnały nie są zakłócone detonacjami innych ładunków, co pozwala na rozpoznanie dominujących w sygnale częstotliwości charakterystycznych dla miejsc odbioru drgań. Dzięki temu, projektując odpalanie milisekundowe siatek wielootworowych, można w znacznym stopniu uniknąć wyboru opóźnienia, które może być przyczyną wzmocnienia intensywności drgań właśnie w zakresie częstotliwości dominujących.
EN
The use of state-of-the-art initiation systems to initiate explosive charges is unmistakably expanding the range of choice of milliseconds delayed and firing times as accurately as possible. This creates wide possibilities for mass-mining of rocks by long holes method. However, it is important to realize that millisecond blasting technique is a source of seismic signals that are triggered sequentially at specific intervals, resulting in changes in waveforms, thereby affecting the frequency structure of vibrations. Due to the fact that in mines explosive loads are detonated very often in several raw materials with different elastic properties, the induced seismic signal coming to the measuring station (protected object) can be modified as a result of passing through different layers. Thus, its intensity and frequency structure changes. It is therefore important to recognize the vibration characteristics of the substrate by firing individual explosive charges. The resulting signals are not disturbed by the detonations of other charges, which allows to recognize the dominant frequences in signals specific to the vibration reception sites. Thus, by designing the millisecond firing of multi-hole patterns, the choice of delay can be largely avoided, which can cause vibration intensities to be just within the dominant frequency range.
PL
Podstawowym problemem dobrego wykorzystania nowoczesnych systemów odpalania ładunków MW jest świadomy wybór opóźnienia milisekundowego – taką tezę należy postawić, podejmując próbę zaprojektowania robót strzałowych z zapewnieniem oczekiwanej granulacji urobku jak i minimalizacji oddziaływania na zabudowania w otoczeniu. Jako studium przypadku, w artykule przedstawiono wyniki analiz drgań zarejestrowanych w czasie wykonywania robót strzałowych w kopalni wapienia, w roku 1996, z zastosowaniem zapalarki elektronicznej EXPLO 201, skonstruowanej w Instytucie Górnictwa Odkrywkowego AGH. Przeprowadzone badania wykazały zasadność odpalania pojedynczych ładunków MW, jako podstawowego źródła informacji o możliwych zmianach w podłożu, w otoczeniu kopalni, jak również o strukturze częstotliwościowej indukowanych drgań. Ponadto badania te potwierdziły konieczność jednoczesnego wykonywania pomiarów drgań w podłożu i na fundamentach budynków oraz, co należy podkreślić, brak możliwości przeprowadzania oceny oddziaływania drgań wzbudzanych w czasie robót strzałowych, tylko na podstawie wyników pomiarów podłoża.
EN
The basic problem of good use of modern explosive charge firing systems is the deliberate choice of millisecond delay – this is the thesis that should be put forward by attempting to design blasting with the expected granularity of the excavated material and minimizing impact on buildings in the vicinity of mines. As a case study, the paper presents the results of vibration analysis recorded during the execution of blast works in the limestone mine in 1996, using the EXPLO 201 electronic blasting machine, constructed at the Institute of Opencast Mining AGH. The research has shown the relevance of firing individual explosive charges as the primary source of information about possible changes in the ground, in surrounded by mine, as well as the frequency structure of induced vibrations. In addition, these studies have confirmed the need for simultaneous measurements of vibrations in the ground and foundations of buildings and, as should be emphasized, the no ability to assess the impact of vibrations induced during blasting, based only on the results of the ground measurements.
PL
Roboty strzałowe w górnictwie odkrywkowym charakteryzują się stosowaniem dużych mas MW do jednorazowego odpalania. Serie liczą od kilku do kilkudziesięciu, a nawet kilkuset ładunków umieszczonych w długich otworach. Prace te często prowadzone są w bezpośrednim sąsiedztwie zabudowań mieszkalnych i innych obiektów budowlanych, stąd konieczność ograniczenia oddziaływania drgań ma zasadnicze znaczenie dla kopalń odkrywkowych. W artykule przedstawiono możliwości sterowania efektem sejsmicznym, poprzez stosowanie elektronicznych systemów do odpalania ładunków MW, które dają szerokie możliwości doboru opóźnień milisekundowych. Pozwala to na modyfikowanie struktury wzbudzanych drgań i może przyczynić się do minimalizacji oddziaływania robót strzałowych na otoczenie. Zwrócono również uwagę na konieczność prowadzenia badań efektu sejsmicznego, co pozwala na uniknięcie efektów niepożądanych.
EN
Blasting in opencast mining is characterized by the use of large Massem of explosives for single firing. Series count from several to tens or even hundreds of charge placed in long boreholes.These Works are often held in the immediate vicinity of residential buildings and other buildings, hence the need to reduce the impact of vibration is essential for open pit mines. This paper presents the results of seismic control capabilities through the use of electronic systems for blasting explosives which give wide selection of millisecond delays. This allows you to modify the structure induced vibration and can help to minimize the impact of blasting on the environment. Attention was also drawn to the need to research the seismic effect, thus avoiding side effects.
PL
Artykuł dotyczy problematyki minimalizacji oddziaływania robót strzałowych na otoczenie kopalń odkrywkowych. Umiejętne wykorzystanie możliwości, jakie niesie postęp w dziedzinie materiałów wybuchowych i środków strzałowych, pozwala na coraz efektywniejsze prowadzenie robót. Szczególnie systemy nieelektryczne i elektroniczne stwarzają nowe możliwości w zakresie doboru opóźnienia milisekundowego. W referacie przedstawiono zagadnienia związane z możliwością sterowania strukturą drgań wzbudzanych robotami strzałowymi i wpływem na interakcję układu budynek-podłoże.
EN
This paper presents the issue of minimization of the impact of the vibration generated by blasting works on the surrounding environment of open pit mines. Only the skillful usage of the opportunities which appeared thanks to the development in the field of explosive materials and blasting agents allows to perform blasting works more efficiently. In particular, the non-electric and the electronic systems offer new opportunities in the selection of millisecond time delays. The issues which are related to the possibility of vibration structure controlling which had been induced by the blasting works were presented in the paper. The impact of the interaction between the building and the ground was also included.