There has been presented an analysis of filtration stability of the slope of embankment of the approach flume of the power plant in Dychów which had been built in 1930' of insufficiently compacted non-cohesive soil. The results of that analysis which has been based on action of the run-off pressure are considerably lower than results gained by the methods of circular paths of shear.
2
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW