PL
Artykuł omawia funkcjonowanie komputerowego systemu nadzoru nad elektroenergetycznym układem zasilania w KWB „Bełchatów”. Przedstawia wykorzystanie systemu dla poprawy efektywności i bezpieczeństwa eksploatacji stacji oraz sieci elektroenergetycznych zakładu górniczego.
EN
The specificity of the Bełchatów lignite coal mine is determined by a close relationship with the operation of the power plant located nearby. As a result, it is necessary to ensure a stable supply of fuel in order to produce the assumed amounts of energy and, thus, it is required for mining machines and transport lines to operate without interruptions. In this respect, automation and monitoring systems intended for control and supervision of the power network in a mine are of major significance. The SYNDIS RV has been used in the Bełchatów lignite coal mine for several years. Given how useful the system has proven to be so far, it is difficult to overestimate its importance. The most notable effects of its use include improvements to work safety, elimination of incorrect reconnections, and remote control of several hundred objects located in the entire area of the mine. Applications that allow you to analyse network disturbances and correct its configuration are very useful. In addition, work support tools developed made it possible to limit the number of personnel and minimise the number of emergency shutdowns.
2
Content available remote Development planning algorithms of 110 kV/MV substations
EN
This paper presents a mathematical model for the development of the distribution transformer substation 110 kV/MV. Discusses optimization algorithms to solve multi-step task in determining the development strategy of the 110 kV/MV substation in period T. Presents developed a computer program and an example calculation for the study of the development of the 110 kV/MV substation operating in urban areas.
PL
W artykule przedstawia się model matematyczny rozwoju stacji transformatorowo-rozdzielczej 110 kV/SN. Omawia się algorytmy rozwiązywania zadania optymalizacji wieloetapowej przy wyznaczaniu strategii rozwoju stacji 110 kV/SN w okresie T. Przedstawia się opracowany program komputerowy oraz przykład obliczeniowy dotyczący badania rozwoju stacji 110 kV/SN pracującej w warunkach miejskich.
PL
W artykule przedstawiono wyniki badań dotyczących analizy niezawodności stacji transformatorowo-rozdzielczych SN w warunkach eksploatacji. Zaproponowano wprowadzenie nowej metody badawczej, pozwalającej na jednoznaczne określenie skutków awarii stacji elektroenergetycznych. Jednym z istotnych celów pracy była weryfikacja, istniejących, różnych metod obliczeniowych, pod kątem ich przydatności do oceny niezawodności stacji transformatorowo-rozdzielczych SN, a także próba stworzenia nowej metody obliczeniowej, dającej znacznie szerszą informację niezawodnościową. Nie wszystkie bowiem metody pozwalają na uzyskanie wystarczającej informacji. Określenie pewnych parametrów niezawodnościowych, jak: intensywność awarii, czas trwania awarii, czy też współczynnik zawodności, nie daje pełnego obrazu przebiegu awarii. Nie pozwala w związku z tym na określenie wielu cech charakterystycznych urządzenia, czy też całej stacji. Ponadto, pewne parametry i współczynniki służące do oceny niezawodności stacji, można niekiedy uzyskać na drodze łatwiejszych i mniej pracochłonnych obliczeń. Niezawodność pracy stacji elektroenergetycznych średnich napięć ma pierwszorzędne znaczenie w procesie dostawy energii elektrycznej do wielkiej liczby jej odbiorców. Najważniejszym celem oceny niezawodności stacji elektroenergetycznych jest dobór takiej struktury stacji oraz takich parametrów urządzeń, aby zapewnić optymalną w danych warunkach pracy ciągłość zasilania odbiorców. Jednocześnie wyznaczenie wypadkowych parametrów niezawodnościowych stacji, pozwala na jej potraktowanie jako scalonego elementu w systemie elektroenergetycznym, którego awarie oraz właściwości zawodnościowe są bardzo ważne ze względu na skutki techniczne, jakie zawodność stacji niesie dla systemu elektroenergetycznego. Problem niezawodności stacji transformatorowo-rozdzielczych SN nie był dotychczas rozpatrywany w sposób kompleksowy.
EN
The paper deals with the assessment of operational reliability of a MV transformer/distribution station. It was attempted to develop a new computational method that would offer significantly greater insight into operational reliability. One of important objectives of the paper was to verify the different existing computational methods, paying special attention to their usefulness for reliability assessment of MV power substations. It is due to the fact that not all methods allow for obtaining sufficient information. Definition of certain reliability parameters, such as failure rate, failure duration or unreliability factor does not create a complete image of the failure sequence. Thus, it does not allow for determining a number of characteristics of a piece of equipment or a whole station. Operational reliability of MV distribution stations is of utmost significance in the process of supplying power to a great number of end-users. The most important objective of assessing the reliability of power distribution stations is the selection of such a structure of stations and the parameters of installed gear to ensure the best possible power supply continuity in particular circumstances. Concurrently, the determination of resultant reliability parameters of a station allows for considering it as an integrated element in the power system whose failures and reliability parameters are very important on account of technical consequences introduced to the power system by the unreliability of a station. The issue of reliability of MV transformer-distribution stations has not been examined in a comprehensive manner yet.
EN
Non deterministic methods of determining optimal location of 110 kV to medium voltage transformer distribution substations, (called GPZ or RPZ), on the area of urban agglomeration have been presented. Technical and economical criteria regarding selection and replacement of transformers, have been discussed. A survey of existing static and dynamic methods of transformer substation localization on the terrain of a town and in industrial areas has been done. Results of a computational experiment for a 110 kV to medium voltage transformer substation at Warsaw area, obtained with the help of computer program LOKAL, have been presented. This program is a fragment of a computer system for 110 kV to medium voltage urban substations investigation elaborated in the Institute of Electrical Power Engineering, Warsaw University of Technology.
PL
Przedstawiono niedeterministyczne metody wyznaczania optymalnego rozmieszczenia stacji transformatorowo-rozdzielczych 110kV/SN, zwanych GPZ-ami lub RPZ-ami, na terenie aglomeracji miejskiej. Omówiono kryteria techniczne i ekonomiczne doboru i wymiany transformatorów pracujących w stacjach elektroenergetycznych. Dokonano przeglądu istniejących metod statycznych i dynamicznych lokalizacji stacji transformatorowych na terenie miasta i zakładu przemysłowego. Przedstawiono wyniki eksperymentu obliczeniowego dla lokalizacji stacji 110 kV/SN na terenie Warszawy, uzyskane przy zastosowaniu programu komputerowego LOKAL. Program ten stanowi fragment systemu komputerowego badania rozwoju miejskich stacji 110 kV/SN opracowanego w Instytucie Elektroenergetyki Politechniki Warszawskiej.
PL
W artykule omówiono podstawowe wymagania przepisów w zakresie budowy układów elektroenergetycznych zasilających zakłady górnicze, wyposażenie w aparaturę aktualnie eksploatowanych stacji 110/6 kV, kierunki zmian w zakresie budowy i zasad działania wybranych elementów modernizowanych stacji. Na załączonych zdjęciach (1-8) przedstawiono zmodernizowaną stację elektroenergetyczną 110/6 kV w ZG 'Polkowice-Sieroszowice'.
EN
Discussed in the article are the basic requirements of regulations in respect of construction of electric power supply systems for mining units, the fumishing of 110/6 kV stations, that are now in operation, with the related switchgear and other outfit, the trends in changing the design and principles of operation of selected elements of the station that is undergoing modernization. The enclosed photos show a 110/6 kV electric power supply station in ZG 'Polkowice-Sieroszowice'.