Rynek oprogramowań dla górnictwa rozwija się w szybkim tempie. Automatyzowanie procesów planowania, wydobywania i produkcji wpływa zwiększenie wydajności, zysku, uproszczenie procesów inżynieryjnych czy obniżenie kosztów wydobycia, co w konsekwencji prowadzi do coraz to większego ułatwienia inżynierom górnictwa ich - i tak już wystarczająco ciężkiej - pracy.
EN
Owned by KGHM International Ltd (KGHM), the Victoria Project is an undeveloped copper-nickel resource located in the Sudbury Igneous Complex. This region has been historically mined for over 110 years for its sulphide nickel, copper, cobalt, and precious metal ores. Due to the anticipated high stress environment, stiff rock mass and significant depth of the resource (>1800 m below surface), severe mining-induced micro-seismicity, strain bursting and stress induced damage is expected. In order to manage hazard and mitigate the associated risk to personnel and production associated with this mining in this environment, appropriate geomechanics strategies will applied at the design stage of the Victoria Project (including micro-seismic monitoring, dynamic ground control systems, re-entry protocols, production extraction sequencing, and strategic location of LOM and development excavations). This paper describes the expected benefit to the Victoria Project by applying lessons learned from comparable mines currently operating within the Sudbury Basin, including KGHM’s Morrison Mine which seismically-active and developing strategies to manage micro-seismic risk.
PL
Projekt Victoria, będący własnością spółki KGHM, jest to aktywo górnicze rozwijane na bazie złoża miedziowo-niklowego wykształconego w obrębie kompleksu skał magmowych Sudbury. Region ten jest przedmiotem historycznej eksploatacji od ponad 110 lat z uwagi na bogate mineralizacje zawierające nikiel, miedź, kobalt oraz metale szlachetne. Z powodu oczekiwanych wysokich stanów naprężeniowych, mocnych skał oraz znacznych głębokości zalegania zasobów (przekraczającej 1800 m), w przypadku Projektu Victoria należy się spodziewać występowania indukowanych zjawisk sejsmicznych, odprężeń oraz zniszczenia górotworu. W celu zarządzania ryzykiem, a także minimalizacji jego wpływu na bezpieczeństwo pracującej załogi oraz osiągane wyniki produkcyjne, odpowiednie metody monitoringu i prewencji muszą być przewidziane już na etapie projektowania przyszłej kopalni (włączając w to monitoring aktywności sejsmicznej górotworu, obudowę podatną, protokoły dotyczące czasu wyczekiwania, właściwą sekwencję wybierania złoża oraz właściwą lokalizację wyrobisk o znaczeniu kapitalnym). W niniejszym artykule opisano szereg spodziewanych korzyści płynących z wykorzystania doświadczenia innych kopalń prowadzących eksploatację w Zagłębiu Sudbury, włączając w to należącą do KGHM kopalnię Morrison.
PL
Nowoczesne narzędzia informatyczne są dziś powszechnie wykorzystywane w pracy projektanta górniczego. Umożliwiają one numeryczne modelowanie poszczególnych elementów kopalni — począwszy od modelu złoża przez model górotworu, model wyrobiska górniczego, modele układów technologicznych. Specjalistyczny software bardzo ułatwia pracę, umożliwiając analizę różnych rozwiązań i wariantów przy stosunkowo niewielkim nakładzie pracy. Trudno dzisiaj wyobrazić sobie projektowanie kopalni węgla bez korzystania z możliwości oferowanych przez nowoczesne narzędzia z rodziny CAD czy specjalistyczne programy dedykowane specjalnie dla górnictwa. W artykule omówiono wykorzystanie nowoczesnych narzędzi informatycznych w projektowaniu kopalni węgla brunatnego Gubin. Realizowana przez spółkę PGE Gubin inwestycja znajduje się obecnie na etapie tworzenia Projektu Zagospodarowania Złoża, którego opracowaniem zajmuje się interdyscyplinarny zespół specjalistów z Akademii Górniczo-Hutniczej, Instytutu Gospodarki Surowcami Mineralnymi i Energią PAN, Politechniki Wrocławskiej i innych ośrodków naukowo-technicznych. W trakcie prac projektowych realizowanych w ramach opracowywanego dokumentu wykorzystywano szereg programów komputerowych, służących m.in. określeniu konturów wyrobiska docelowego, parametrów skarp i zboczy, obliczaniu zasobów złoża, określaniu postępów frontów węglowych i nadkładowych w poszczególnych okresach eksploatacji czy obliczaniu powierzchni i objętości planowanego po zakończeniu eksploatacji zbiornika wodnego. Do analizy wpływu projektowanej kopalni na środowisko wykorzystano model hydrogeologiczny, który pozwolił określić zasięg leja depresyjnego. Omówiono wykorzystanie tzw. programów projektowania wspomaganego komputerowo (Computer Aided Design, CAD). W przypadku kopalni Gubin podstawowym narzędziem służącym do kreślenia i obróbki map cyfrowych był pakiet MicroStation firmy Bentley Systems.
EN
Modern IT tools are now commonly used in the work of mine designers. They allow for numerical modeling of particular elements of the mine — from the model of the deposit through the model of the rock-mass, pit, and technological systems. Specialized software greatly facilitates work, allowing for analysis of different solutions and variants with a relatively limited amount of labor. It is hard to imagine a coal mine design without the use of possibilities offered by modern CAD tools or specialist programmes dedicated for use in the mining industry. This article describes the use of modern IT tools in the design of the Gubin lignite mine. This investment, undertaken by PGE Gubin, is currently at the stage of feasibility study. The feasibility document is being developed by an interdisciplinary team of specialists from the AGH University of Science and Technology, the Mineral and Energy Economy Research Institute of the Polish Academy of Sciences, the Wroclaw University of Technology, and other scientific and engineering centres. During the design works, several computer programmes were used for such tasks as determining the borders of the mining area, slope parameters, calculation of the deposit's reserves, determining the mining fronts' progress in particular periods of exploitation, and determining the area and volume of the final pit. Furthermore, a hydrogeological model was used for analyzing the impact of the designed mine on the environment. It allowed for a determination of the range of the depression cone of the mine. The use of Computer Aided Design (CAD) programmes has also been presented. In the case of the Gubin lignite mine, MicroStation by Bentley Systems has been the basic tool for drawing and modifying the digital maps.
PL
Tradycyjne metody pomiarowe w górnictwie wypierane są przez innowacyjne, między innymi przez cyfrową fotogrametrię naziemną, bliskiego zasięgu. Jakie są możliwości zastosowania fotogrametrycznych metod pomiarów przy projektowaniu kopalń, robót strzałowych, prac udostępniających oraz planowaniu postępu eksploatacji? Artykuł opisuje metodę identyfikacji fotogrametrycznych, podaje przykłady aplikacji tych metod w górnictwie odkrywkowym.
PL
W artykule zaprezentowano wybrane zagadnienia dotyczące projektowania nowej kopalni odkrywkowej na złożu węgla brunatnego Gubin w gminie Gubin i Brody w województwie lubuskim. Przedstawiono ważniejsze cechy procesu projektowania oraz szczególne wymagania dla budowy kopalni odkrywkowej wynikające z uwarunkowań górniczych, środowiskowych, społecznych i formalno-prawnych. Zaprezentowano dotychczasowy stan zaawansowania prac i problemy, które wymagają rozwiązania w kolejnych etapach projektowania kopalni na złożu Gubin.
EN
The article presents selected aspects related to the design of a new openpit mine on Gubin lignite deposit, located in Gubin and Brody municipalities in Lubuskie voivodship. The most important characteristics of the design process have been described together with particular requirements for the building of a new openpit mine which result from mining, environmental, social and legal conditions. Hitherto state of work and the problems that need solving in the next phases of design of the Gubin mine have also been presented.
PL
Zagospodarowanie złoża Gubin to przedsięwzięcie, które pod względem skali i znaczenia można porównać do budowy kopalni w Bełchatowie. Złoża Gubin i Bełchatów diametralnie się od siebie różnią jednak porównanie to jest uzasadnione ze względu na znaczenie planowanej inwestycji dla polskiego przemys?u górniczego i energetycznego. W artykule przedstawiono wybrane problemy zwi?zane z górniczym zagospodarowaniem złoża Gubin. Zwrócono uwagę na zmianę otoczenia formalno-prawnego dla inwestycji górniczej jaka się dokona?a po zmianie systemu społeczno-gospodarczego. Podkreślono znaczenie uwarunkowań przestrzennych, środowiskowych i społecznych. Przedstawiono cechy procesu projektowania - długi horyzont czasowy realizacji projektowanej inwestycji, niepewność uwarunkowań zewnętrznych i wynikające stąd trudności w ocenie op?acalno?ci projektu. Zwrócono uwagę na wzajemne powi?zanie poszczególnych elementów projektu oraz zależność czasową w procesie ich opracowania. Wykazano iteracyjny charakter procesu projektowania i wynikającą stąd konieczność weryfikacji przyjętych już rozwiązań. Jako tło do przedstawienia wybranych konkretnych problemów związanych z projektowaniem zagospodarowania złoża Gubin omówiono metody projektowania - metodę wariantów, empiryczną i kolejnych przybliżeń. Omówiono narzędzia i możliwość ich zastosowania do rozwiązywania wybranych problemów z dziedziny projektowania kopalni odkrywkowej. Główną część pracy stanowi rozdział, w którym odniesiono się do konkretnych problemów zagospodarowania złoża Gubin. Przedstawiono założenia, na podstawie których określono wielkość rocznego wydobycia i przewidywaną ilość wydobytego węgla w całym okresie funkcjonowania kopalni. Omówiono proces okonturowania wyrobiska z uwzględnieniem uwarunkowań złożowych, geotechnicznych, przestrzennych, społecznych i środowiskowych. Wymieniono kryteria wyboru lokalizacji miejsca udostępnienia złoża oraz lokalizacji zwałowiska zewnętrznego. W podsumowaniu przedstawiono stan zaawansowania prac projektowych oraz wymieniono niektóre problemy do rozwiązania na kolejnych etapach planowania zagospodarowania złoża.
EN
The development of the Gubin lignite deposit is a venture that can be compared to the construction of Belchatow’s mine both in scale and significance. Although the Gubin and Belchatow deposits are completely different from each other, this comparison is justified because of the significance this investment represents to the Polish mining and energy sectors. This paper presents selected problems related to the mining development of the Gubin deposit. Attention has been paid to the changes in the legal and formal requirements for mining investments which were introduced after the transformation of the Polish social and economic system. The significance of spatial, environmental, and social conditionings has been underlined. Typical attributes of the mine planning process have also been presented. Those include the lengthy time horizon of the investment, uncertainty of external conditions, and resulting difficulties in the project’s economic evaluation. Focus has been placed on mutual connections between particular elements of the project and time dependences during the process of their development. The iterative character of the design process has been proven together with the resulting necessity of frequent verification of previous assumptions. As a background for presenting selected problems related to planning the development of the Gubin lignite deposit, the article discusses the methods of design – the variants method, empirical method, and the method of consecutive approximations. Tools and the possibilities of their use for solving chosen problems related to open pit mine design have been broadly covered. The chapter in which the authors highlight the specific problems of the Gubin deposit’s development constitutes the main subject of the paper. It depicts the assumptions on which the annual production and the total extraction of lignite during the life-of-mine period have been based. The paper reviews the process of planning the full impact of the mine, which needs to take environmental, geotechnical, spatial, social, and mining conditions into account. It also indicates the criteria for choosing the location of the opening cut and the external dump. The summary presents the current state of the mine design progress together with some problems that will need to be solved during the next stages of the deposit’s development.
7
Content available Selected aspects of theory of mine planning
EN
Theory of mine planning is a branch of knowledge located between science, technology, engineering and economics. Creation of new plans and projects for future exploitation of useful mineral and mine structural elements connected with the exploitation process must be preceded by deep knowledge of structures of mine production process, principles of exploitation and methods of estimating streams of financial outlays and benefits connected with mine production process. One of the methods is so called integrational method of mine production process modelling, which takes into account mutual relations between the structures of mine production process as well as streams of financial outlays and benefits connected with them. In the paper a brief historical outline of the method is presented and its extension from deterministic to probabilistic modelling. Selected possibilities of the method application for solving practical problems of mine planning and design are shown on the simplified examples limited to the volume of the paper.
PL
Teoria projektowania kopalń jest dziedziną wiedzy leżącą na styku nauk podstawowych, techniki i ekonomiki. Tworzenie projektów przyszłej eksploatacji kopaliny użytecznej i związanych z eksploatacją elementów kopalń podziemnych wymaga znajomości struktur procesu produkcyjnego kopalni podziemnej, zasad eksploatacji górniczej oraz metod szacowania strumieni nakładów i efektów finansowych związanych z realizacją procesu produkcyjnego. Jedną z metod, która uwzględnia wzajemne relacje elementów struktury procesu produkcyjnego i związanych z nimi strumieni nakładów i efektów finansowych jest tzw. integracyjna metoda modelowania procesu produkcyjnego kopalni podziemnej. W artykule zaprezentowano krótki rys historyczny tej metody i jej ewolucję od modelowania deterministycznego do probabilistycznego. Pokazano również wybrane możliwości jej zastosowania do rozwiązywania praktycznych zagadnień projektowania elementów procesu produkcyjnego podziemnej kopalni na uproszczonych i bardzo ogólnych przykładach ze względu na ograniczenia objętościowe pracy.
EN
In this paper, the methodology of modelling the production process of the underground hard coal mine together with the streams of financial outlays and benefits is characterised. The method was developed for the purpose of analysis and assessment of the economic efficiency of the investment works in terms of determining the output volume of the mine. The reference to the integrational method of the mine production process modelling and estimating its economic efficiency in the underground hard coal mine was made. On the basis of this reference, a model of the production process and associated with this process streams of financial outlays and benefits were built. Economic efficiency indices of the investment, as the objective functions were shortly characterised. The aspect of uncertainty and risk, associated with the process of planning the output volume of the mine were discussed. The most important information and data, assumed for the exemplary calculations, conducted in accordance to the developed methodology and the most important conclusions drawn from the calculations were also instanced.
PL
W pracy scharakteryzowano metodykę modelowania procesu produkcyjnego podziemnej kopalni węgla kamiennego oraz związanych z nim strumieni wydatków i efektów finansowych opracowaną dla potrzeb analizy i oceny ekonomicznej efektywności przedsięwzięć inwestycyjnych w aspekcie projektowania wielkości wydobycia kopalni. Nawiązano do integracyjnej metody odwzorowania i oceny ekonomicznej efektywności procesu produkcyjnego kopalni podziemnej, na bazie której zbudowano model procesu produkcyjnego i związanych z nim strumieni wydatków i efektów finansowych. Scharakteryzowano pokrótce mierniki oceny ekonomicznej efektywności inwestycji przyjęte jako funkcje celu. Poddano dyskusji aspekt niepewności i ryzyka w procesie projektowania wielkości wydobycia kopalni. Przytoczono najważniejsze informacje i dane przyjęte do przykładowych obliczeń, które wykonano zgodnie z opracowaną metodyką, a także najistotniejsze wnioski wynikające z obliczeń.
EN
The article presents the condition of Polish brown coal industry in reference to present and predicted country’s energy demand. The possible scenarios of continuation of brown coal extracting in active and perspective areas are shown on the background of resources base. By presenting such assets as: documented deposits, exploitation experience, adequate research and technical background, competitive price of energy produced from brown coal the necessity of government taking up action towards developing and approving essential policies and programs concerning the brown coal mining and energy sectors was justified. The most important conditionings that have to be fulfilled for possible development of brown coal mining and energy sector in the first half of XXI century are also described.
PL
W referacie przedstawiono stan górnictwa węgla brunatnego w Polsce w odniesieniu do aktualnych i prognozowanych potrzeb energetycznych kraju. Charakteryzując bazę zasobową wskazano możliwości kontynuacji wydobycia węgla brunatnego w rejonach czynnych kopalń oraz rejony perspektywiczne budowy nowych kopalń. Prezentując takie atuty jak: udokumentowana baza zasobowa, doświadczenie w zakresie eksploatacji, odpowiednie zaplecze naukowo-techniczne, konkurencyjna cena energii wytwarzanej z węgla brunatnego uzasadniono konieczność podjęcia przez rząd działań w zakresie opracowania i zatwierdzenia niezbędnych polityk i programów rozwoju sektora górniczo-energetycznego węgla brunatnego. Przedstawiono najważniejsze uwarunkowania, które należy spełnić dla rozwoju górnictwa i energetyki na węglu brunatnym w I połowie XXI wieku w Polsce.
PL
Programy do optymalizacji działań kopalń odkrywkowych są na świecie powszechnie stosowane od piętnastu lat, a więc niewiele dłużej niż obowiązują u nas zasady ekonomii rynkowej. Pomimo tego nie zdobyły u nas popularności. Jedna z przyczyn oporów przed zastosowaniem komputerów do tych celów należy upatrywać w braku upowszechniania wiedzy na ten temat. W artykule omówiono zasady analizy opłacalności inwestycji i stosowane na świecie metody oparte na dyskontowych przepływach pieniężnych. Na prostych przykładach wprowadzono pojęcia stosowanych w programach optymalizacyjnych firmy Whittle i Earthworks. Corp. Omówiono zasady algorytmu Lerchs'a Grossmann'a oraz algorytmu "ruchomych stożków" i zademonstrowano różnice. Pokazano również możliwości dostępnych na rynku programów Whittle 3D i $D, MaxiPit oraz omówiono dalsze możliwości optymalizacji harmonogramu wydobycia w programie NPVScheduler 2 i Mine Flow.
EN
Open pit optimization programs have been weidly used in the world since about 15 years. So not much longer than market economy rules are present in Poland. Deposit this they have not become very popular here. One of the reasons of reluctance in application of computers in this area is a lack of knowledge. This paper tries to fulfil this gap. At the beginning the rules of economic evaluation of projects profitability has been discussed together with discounted cash flow methods (DCF). Using simple examples several terms used in optimization programs (from Whittle programming an Earthworks Corp. firms) has been introduced. Among others: an ultimate pit, nested pits (phases), a sequence if extraction an optimal pit, and pushbacks. It has been also shown how the value of a pit is changing as a consequence of the change in sequence of extraction. A short descriptions of Lwerchs-Grossmann algorithm as well as floating cone method has also been described and differences underline. Capabilities of optimization programs available on the market such as Whittle 3D and 4D as well as MaxPit have been discussed together with further possibility of optimization of long term pit schedules in programs: VPVScheduler 2 and Mine Flow.