Content available remote The financial aspect of local rainwater management on a wind farm
EN
Nowadays, due to the progressing water deficit, increasing attention is paid to the possibility of retaining rainwater at the place where precipitation occurs. In terms of selecting the method for local rainwater management, the financial profitability of the investment is a very important issue for an investor. In the article, the profitability of two methods of drainage the selected facilities of the wind power plant is analyzed. The solutions with an absorbing well and infiltration boxes were taken into account. The indicators of financial profitability classified as discount methods were used in the analysis. The investigation made it possible to determine the relationship between investment costs and profits in terms of achieving investment viability. The analysis concerns the specific object, so its results are not universal. However, they can be helpful in the case of similar investments, which is especially important because of the fact that draining rainwater from selected wind plant facilities is necessary.
PL
W związku z postępującym deficytem wody, coraz większą uwagę zwraca się obecnie na możliwość zatrzymywania wód opadowych w miejscu występowania opadów. W przypadku wyboru sposobu lokalnego zagospodarowania wód opadowych bardzo ważną kwestią dla inwestora jest opłacalność finansowa inwestycji. W artykule przeanalizowano opłacalność 2 metod odwodnienia wybranych obiektów farmy wiatrowej. Uwzględniono rozwiązanie ze studnią chłonną oraz rozwiązanie ze skrzynkami rozsączającymi. W analizie wykorzystano wskaźniki oceny efektywności finansowej inwestycji zaliczane do metod dyskontowych. Badania pozwoliły określić powiazanie między kosztami inwestycyjnymi a zyskami w aspekcie osiągnięcia opłacalności inwestycji. Przeprowadzone analizy dotyczą konkretnego obiektu, więc uzyskanych wyników nie można traktować jako uniwersalne. Mogą być one jednak pomocne w przypadku innych podobnych inwestycji. Jest to szczególnie ważne ze względu na konieczność odprowadzenia wód opadowych z obiektów farm wiatrowych.
EN
Water is essential to the proper functioning of kindergartens and schools. Nevertheless, water consumption in public facilities is usually high, often exceeding the average household water consumption. Recently, increasing pressure on this valuable and depletable natural resource has been noticed and, therefore, it is interesting to study the water consumption in kindergartens and the possibilities of water saving. The present work examined 6 kindergarten facilities in Kyjov, Czech Republic, where the equipment has been enhanced with the faucet water saving technology. The work analyzed the impact of the equipment on the reduction of water consumption as a raw material and on the financial and economic profitability. The results were estimated based on the variation of two parameters such as average daily water consumption and demand per person. The experiment showed that installing the savers resulted in water savings ranging from 8% to 18.7% for average daily consumption and from 10.02% to 23.2% for per capita demand.
PL
W artykule przedstawiono perspektywy rozwoju mikroźródeł energii elektrycznej oraz bariery rozwoju prosumeryzmu w Polsce. Przeprowadzono analizę opłacalności mikroźródła prosumenckiego o mocy zainstalowanej 3 kW i sformułowano podsumowujące wnioski.
EN
The presented paper describes perspectives of electric energy microsources development as well as barriers limiting the prosumer development in Poland. Analysis of prosumer 3 kW microsources profitability was presented with recapitulated conclusions.
PL
Praca zawiera studium wykonalności budowy akumulatora litowo-jonowego, oraz elektrowni szczytowo-pompowej. Omówiono w niej podstawowe informacje dotyczące rozwoju odnawialnych źródeł energii w Polsce oraz przedstawiono najważniejsze informacje o magazynowaniu energii. W pracy zostało przeprowadzone pełne studium wykonalności dla obu projektów, zawierające analizę:rynku, ekonomiczną, techniczną i strategiczną. Akumulatory litowo-jonowe miały stabilizować pracę farmy wiatrowej. W przypadku elektrowni szczytowo-pompowej oszacowano zysk związany z budową jej w wyrobiskach likwidowanej kopalni. Na podstawie przeprowadzonej analizy stwierdzono, że analizowane inwestycje nie są opłacalne. Elektrownia szczytowo-pompowa ze względu na bieżące koszty eksploatacyjne związane głównie z zakupem energii w dolinach nocnych. Akumulatory, ze względu na zbyt małą ilość energii przekazywaną przez farmy wiatrowe do zasobników oraz koszty inwestycji. Niemniej, inwestycje związane z magazynowaniem energii, ze względu na rosnącą ilość odnawialnych źródeł, powinny być dalej realizowane i dynamicznie wspierane przez instytucje państwowe w celu zapewnienie bezpieczeństwa energetycznego kraju.
EN
This paperincludes a feasibility study for construction of a lithium-ion battery and a pumped storage power plant. It contains basic information on the development of renewable energy sources in Poland and presents the most important information on energy storage. The work involved a full feasibility study for both projects, including market, economic, technical and strategic analysis. In the case of the pumped storage power plant, the cost of its construction in the minewas estimated. Based on the analysis, it was found that the analysed investments are not profitable: the pumped storage power plant due to the current operating costs related mainly to the purchase of energy in the night valleys. Batteries, due to the insufficient amount of energy transferred by wind farms to the cells and investment costs. However, due to the growing number of renewable sources, investments inenergy storage, should be further implemented and dynamically supported by state institutions in order to ensure energy security of the country.
EN
With increased interest in renewable energy sources, such as photovoltaic farms, a number of studies whose aim was the analysis of their positive and negative impact on the power system was carried out. From the point of view of the system operator, the suitable place of installation and the size of such plant in the network can have a positive impact on the value and direction of power flow, voltage levels, the value of the power loss, short- circuit currents and power factor. However, the biggest difficulty in the application of the farm is its unexpected production characteristic which depends mainly on the weather conditions changing randomly during the day. The most desirable case is a period when this farm is capable of being installed in depth of the network to reduce daily peak demand for electricity. The energy from big, centralized plants working in the system must be delivered to the customers at this time, which generates additional costs of starting units, working in short period of time and increases power losses on lines, which must send higher energy values. Accordingly, the sense of use of an external energy storage systems cooperating with photovoltaic installations is clear. For the grid operator, in the case of large PV farm desirable to be able to use the extra energy of the battery power and the ability to use the farm to reduce the afternoon and evening peaks. This may positively affect production costs and transmit additional energy to the system.
PL
W artykule podjęto próbę analizy rentowności zastosowania outsourcingu w operacyjnym zarządzaniu produkcją budowlaną. Wskazano na zadania outsourcingu w systemie podwykonawczym, który jest coraz częściej spotykanym narzędziem sterowania produkcją i usługami, w tym również kontraktami budowlanymi. Na wybranych przykładach przedstawiono główne przesłanki przemawiające za wyborem tej strategii zarządzania w procesie tworzenia produktu. Ustalono, że zastosowanie outsourcingu pozwala na wykorzystanie potencjału kontrahentów, zdywersyfikowanie wyspecjalizowanych usług, poparte wyższą jakością i wydajnością, a także niższe koszty wewnętrzne, w porównaniu z dużymi podmiotami/korporacjami, realizującymi projekty w systemie generalnego wykonawstwa.
EN
Throughout the article, the author makes an attempt to analyze the profitability of using the outsourcing process, in the operational management of building works. The article indicates the outsourcing tasks in the subcontracting system, which is more and more often being used as a tool for controlling the executed works, including the contracts concluded in the construction and building industry areas. The selected examples present the main premises that support this management strategy throughout the process of creating the product. The findings allow us to establish that application of outsourcing makes it possible to use the potential of the customers, diversify the specialized services, as higher effectiveness and quality may be achieved. Finally, the internal costs are limited, especially in comparison with large businesses/corporations, realizing the projects with the use of the general contractor system.
EN
In this paper, profitability criteria and calculation methodology of profitability conditions for partial cogeneration in nuclear power plant (NPP) was presented. Considered NPP supplies electricity to consumers through public power system, whereas heat is expected to be supplied to consumption regions via long-distance heat transport line. First proposed profitability criterion was total annual costs of electricity and heat delivered from three supply systems, namely: a) nuclear power plant, adapted to the extraction of process heat and low temperature heat – referred to as nuclear cogeneration plant (NCP), b) fossil-fuel cogeneration plant (FCP) plus additional electrical power and energy from power grid (or simply from fossil-fuel power plant - FPP) to compensate the difference between electrical power outputs of NCP and FCP (both having equal heat production) c) fossil-fuel district heating plants (FDHP) plus power plant i.e. two options: c1) fossil-fuel power plant (FPP) and c2) nuclear power plant (NPP). Additionally, supplementary criterion comparing specific heat cost from nuclear cogeneration plant with the cost of heat from FCP and FDHP was proposed. From nuclear plant investor and operator point of view, the criteria based on economic factors i.e. net present value (NPV), internal rate of return (IRR) and discounted payback period (DPP) will be critical for decision making process. These economic factors were used for supplementary criteria and the methods of their calculation were presented.
PL
W niniejszym referacie zaprezentowano metodykę badawczą mającą na celu określenie warunków opłacalności zastosowania częściowego skojarzenia w elektrowni jądrowej. Elektrownia ta będzie oddawać energię elektryczną do krajowego systemu elektroenergetycznego (KSE), natomiast ciepło będzie dostarczane do rejonów zasilania. Sformułowano kryteria opłacalności zastosowania częściowego skojarzenia w EJ oraz warunki, jakie muszą być spełnione, aby to porównanie było prawidłowe. W/w kryteria obejmują porównanie całkowitych kosztów rocznych wytwarzania i dostawy energii elektrycznej i ciepła z trzech układów zasilania, z których jeden to uciepłowniona elektrownia jądrowa, drugi – elektrociepłownia klasyczna oraz moc wyrównawcza dostarczana z KSE, a trzeci to układ rozdzielony, składający się z klasycznej elektrowni kondensacyjnej (lub elektrowni jądrowej) oraz ciepłowni klasycznych. Zaproponowano kryterium pomocnicze, które porównuje jednostkowy koszt ciepła z uciepłownionej elektrowni jądrowej z jednostkowym kosztem wytwarzania ciepła z klasycznej elektrociepłowni i klasycznej ciepłowni. Z punktu widzenia inwestora istotne jednak będą kryteria oparte na wskaźnikach ekonomicznych w postaci zaktualizowanej wartości netto (NPV), wewnętrznej stopy zwrotu (IRR) oraz zdyskontowanego okresu zwrotu (DPBP), które również zaprezentowano w tym artykule.
PL
W artykule przedstawiono analizę ekonomiczną rentowności wykorzystania niskotemperaturowego ciepła w bloku ciepłowniczym klasy BC-100. Zdefiniowano możliwe do zastosowania układy cieplno-przepływowe z wymiennikami wykorzystującymi ciepło niskotemperaturowe. Analizę ekonomiczną wykonano dla rozważanych układów cieplno-przepływowych, w których wykorzystano różnego typu wymienniki ciepła (rurowe i płaszczowe). Wynikiem analizy jest zestawienie najlepszych konfiguracji układów wykorzystania ciepła niskotemperaturowego.
EN
The article presents an economic analysis of profitability of a low-temperature heat recovery in a BC-100 district heating plant. Possible variants of systems regarding heat transfer and mass flow of the working medium and having heat exchangers utilizing low-temperature heat are discussed. The analysis was made for systems, in which different types of heat exchangers (tube, shell) were used. The analysis result is a list of best configuration of systems for low-temperature heat recuperation.
EN
Paper discusses issues relating to the valuation of investment efficiency in the oil and gas industry using a real options theory. The example of investment pricing using real options was depicted and it was confronted with the analysis executed with the use of traditional methods. Indicators commonly used to evaluate profitability of investment projects, based on a discounted cash flow method, have a few significant drawbacks, the most meaningful of which is staticity which means that any changes resulting from a decision process during the time of investment cannot be taken into consideration. In accordance with a methodology that is currently used, investment projects are analysed in a way that all the key decisions are made at the beginning and are irreversible. This approach assumes, that all the cash flows are specified and does not let the fact that during the time of investment there may appear new information, which could change its original form. What is also not analysed is the possibility of readjustment, due to staff managment’s decisions, to the current market conditions, by expanding, speeding up/slowing down, abandoning or changing an outline of the undertaking. In result, traditional methods of investment projects valuation may lead to taking wrong decisions, e.g. giving up an owned exploitation licence or untimely liquidation of boreholes, which seem to be unprofitable. Due to all the above-mentioned there appears the necessity of finding some other methods which would let one make real and adequate estimations about investments in a petroleum industry especially when it comes to unconventional resources extraction. One of the methods which has been recently getting more and more approval in a world petroleum economics, is a real options pricing method. A real option is a right (but not an obligation) to make a decision connected with an investment in a specified time or time interval. According to the method a static model of pricing using DCF is no longer used; an investment project is divided into a series of steps and after each one there is a range of possible investment decisions, technical and organizational issues and all the others called ‘real options’. This lets one take many different varieties of modyfiying a strategy while pricing the project. This also makes it possible to react to the changing inner and outer situation and introducing new information while accomplishing the investment project. Owing to those, the decision process is a continuous operation, what is an actual vision of a real investment project management in the petroleum industry.
PL
W artykule omówiono kwestie związane z wykorzystaniem do oceny efektywności inwestycji w przemyśle naftowym teorii opcji realnych. Przedstawiono przykład wyceny inwestycji za pomocą opcji realnych i skonfrontowano go z analizą przeprowadzoną z wykorzystaniem tradycyjnych metod. Używane powszechnie do oceny opłacalności projektów inwestycyjnych wskaźniki, oparte na metodzie zdyskontowanych przepływów pieniężnych, posiadają istotne wady, z których jedną z najważniejszych jest statyczność, czyli brak możliwości uwzględnienia zmian wynikających z procesu decyzyjnego w trakcie trwania inwestycji. Zgodnie z obowiązującą aktualnie metodyką analizuje się projekty inwestycyjne w ten sposób, że kluczowe decyzje zapadają na początku i są nieodwracalne. Podejście to zakłada, że przepływy pieniężne są ustalone i nie uwzględnia faktu, iż w czasie trwania inwestycji mogą pojawić się nowe informacje, które zmienią jej oryginalny kształt. Nie analizuje się również możliwości dostosowania przez decyzje kadry zarządzającej do aktualnych warunków rynkowych poprzez np.: rozszerzenie, przyspieszenie/zwolnienie, porzucenie czy zmianę profilu przedsięwzięcia. W rezultacie tradycyjne metody oceny projektów inwestycyjnych mogą doprowadzić do podjęcia błędnych decyzji. np. o rezygnacji z posiadanej koncesji eksploatacyjnej czy przedwczesnej likwidacji odwiertów, które wydają się nierentowne. W związku z powyższym istnieje konieczność zastosowania innych metod, pozwalających na urealnienie sposobu dokonywania wyceny wartości złóż oraz inwestycji w przemyśle naftowym, zwłaszcza w przypadku eksploatacji zasobów niekonwencjonalnych. Jedną z nich, zyskującą w ostatnich latach coraz większe uznanie w światowej ekonomice naftowej, jest metoda wyceny opcji realnych. Opcja realna jest prawem, (ale nie obowiązkiem) do podjęcia decyzji związanej z inwestycją w określonym czasie lub przedziale czasu. Odrzuca się więc statyczny model wyceny metodą DCF i dzieli projekt inwestycyjny na szereg kroków, po których istnieje zestaw możliwych do podjęcia decyzji inwestycyjnych, technicznych, organizacyjnych lub innych, zwanych „opcjami realnymi“. Pozwala to na uwzględnienie w wycenie elastyczności w zakresie modyfikowania strategii, reagowania na zmieniającą się sytuację wewnętrzną i zewnętrzną oraz pojawienie się w trakcie realizacji inwestycji nowych informacji. Dzięki temu proces decyzyjny ma charakter ciągły, co odpowiada sytuacji rzeczywistego zarządzania projektem inwestycyjnym w przemyśle naftowym.
PL
Artykuł przedstawia analizę opłacalności budowy farmy wiatrowej o mocy 40 MW. Analizowany przypadek dotyczy inwestycji na terenie Polski i uwzględnia skutki pierwszych informacji o globalnym kryzysie finansowym. W referacie przedstawiono wpływ umocnienia się waluty euro w stosunku do złotówki w IV kwartale 2008r. na wysokość nakładów inwestycyjnych. Wyniki analizy opłacalności budowy farmy wiatrowej o mocy 40 MW zostały opisane we wnioskach i odniesione do aktualnej sytuacji rynkowej w branży energetyki wiatrowej.
EN
The profitability of wind farm project 40 MW capacity is the subject of this elaboration. Case study refers to greenfield project in Poland. Described case takes into consideration current consequences of global financial crisis. Influence on investment's cost and consequences of rising euro with relation to zloty in third quarter of 2008 is performed in the analysis. The profitability's results of wind farm project 40 MW is presented in relation to current wind energy market in Poland.
11
Content available remote Analiza rentowności eksploatacji pojazdów szynowych
PL
Praca zawiera wyniki analizy rentowności wybranych środków transportu szynowego. Wyniki analizy przedstawiono w formie tabel i wykresów graficznych.
EN
The paper comprises results of profitability analysis of selected means of railway transport. Results of the analysis have been presented in the form of tables.