This paper presents and discusses the results of numerical modelling of pore water pressure build-up in post-flotation saturated tailings deposited at the Tailings Storage Facility “Żelazny Most”, caused by seismic-induced dynamic loading. Numerical simulations were based on the compaction/liquefaction model proposed by A. Sawicki. The model parameters were determined in the laboratory for tailings sampled at the TSF “Żelazny Most”. The sensitivity of the numerical model was verified in a series of numerical tests for various horizontal acceleration amplitudes. In the main calculations, an accelerogram recorded during a real paraseimic event was assumed. The results obtained show that, with the current seismic activity near the TSF “Żelazny Most”, some pore water pressure is generated within the saturated tailings layer, but it does not trigger the liquefaction phenomenon.
PL
Budowa bardzo dużych obiektów unieszkodliwiania odpadów wydobywczych, do których niewątpliwie kwalifikują się mokre składowiska odpadów poflotacyjnych, jest skomplikowanym zadaniem inżynierskim, wymagającym rozwiązania szeregu zagadnień technicznych i środowiskowych. Projektowanie, budowa i eksploatacja takiego obiektu metodą obserwacyjną sprowadza się do weryfikacji założeń projektowych na podstawie prowadzonego na bieżąco monitoringu. Jednym z podstawowych zadań monitoringu jest, w miarę wypełniania składowiska odpadami, kontrola jakości formowanych nadbudów zapór, elementu konstrukcyjnego obiektu, odpowiedzialnego za jego stateczność. Wykorzystywanie do nadbudowy zapór wyselekcjonowanego z deponowanych odpadów materiału, wymaga zdefiniowania kryteriów uziarnienia i zagęszczenia, które przekładają się wprost na nośność i odkształcalność konstrukcji. Podstawowe badania kontrolne obejmują zatem analizy uziarnienia i właściwości fizycznych wbudowanego w zapory materiału. Dane te mogą być również wykorzystane do oszacowania zdolności filtracyjnych nasypu budowlanego. Brak możliwości odpływu, powodującego akumulację wody w obrębie nasypu, potencjalnie pogarsza warunki stateczności. W pracy zbadano przydatność wzorów empirycznych do oceny współczynnika filtracji odpadów, wzorów które powszechnie stosuje się do gruntów naturalnych. Zaproponowano również prostą formułę empiryczną pozwalającą oszacować współczynnik filtracji odpadów na bazie parametrów uziarnienia i zagęszczenia, określanych w rutynowych badaniach kontroli jakości formowanych nadbudów zapory.
EN
Construction of very big mine tailings deposition sites, such as postflotation tailings ponds, is a complicated engineering task, in which several technical and environmental problems need to be solved. Designing, construction and operation of such an object applying the monitoring method consists in the verification of design assumptions based on continuous observations. One of the primary tasks of monitoring while the deposition site is being filled with tailings is to control quality of the formed dam embankments, as the structural element of the object responsible for its stability. In order to use material selected from deposited tailings in the construction of dams it is necessary to define grain size and compaction criteria, which directly affect load bearing capacity and deformation of the structure. For this reason main control tests include the analyses of grain size distribution and physical properties of the material embedded in the dams. These data may also be used to estimate filtration capacity of the embankment. A lack of drainage, causing accumulation of water within the embankment, may potentially deteriorate stability conditions. This paper presents the use of empirical formulas, i.e. formulas typically applied to natural soils, to assess permeability coefficient of tailings. A simple empirical formula was also proposed for the estimation of permeability coefficient of tailings based on grain size and compaction parameters determined in routine quality tests of constructed dam embankments.
PL
Składowisko odpadów poflotacyjnych rud miedzi „Żelazny Most" położone jest w południowo-zachodniej części kraju pomiędzy Lubinem a Głogowem. Jest to obecnie największe tego typu składowisko w Europie i jedno z większych na świecie. Powierzchnia składowiska wynosi 1410 ha, wysokość zapór w najwyższym punkcie przekroczyła 55 m, kubatura zgromadzonych odpadów wynosi ok. 400 mln m3. Składowiskiem zarządza Oddział Zakład Hydrotechniczny KGHM Polska Miedź S.A. Eksploatację składowiska rozpoczęto w 1977 roku, a projekt składowiska i jego rozbudowy oraz nadzór autorski prowadzone są od 1974 roku przez Hydroprojekt Warszawa. W referacie podano podstawowe parametry składowiska i deponowanych odpadów ze szczególnym podkreśleniem zagadnienia związanego z wykorzystaniem deponowanych odpadów w konstrukcji sukcesywnie formowanych zapór. Zapewnienie stateczności zapór jest podstawowym kryterium decydującym o bezpieczeństwie obiektu.
EN
The „Żelazny Most" reservoir for disposal of copper ore post-flotation tailings is situated in south-west part of Poland between Lubin and Głogów. It is now the largest tailings disposal reservoir in Europę and one of the largest in the world, with surface of 1410 ha. The maximum height of the tailing dam reaches 55 m and 400 mln m3 tailings have been deposited up to now. Progressive design and supervision are being performed by Hydroprojekt sińce 1974, however operation started in 1977. The object is being managed by KGHM Polska Miedź S.A. In this paper, basic tailings dam and disposed post-flotation tailings parameters are presented, with detailed information concerning the use of tailings in construction of the dam. The assurance of slopes stability is the decisive safety criterion of the object.