Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  osiadanie górnicze
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
Sublevel caving (SLC) mining method has several features that make it one of the preferred methods for ore extraction due to its high productivity and early access to ore recovery. However, there are some major challenges associated with the SLC method such as ground surface subsidence, high unplanned ore dilution, and the potential for air blast. To remedy these shortcomings, a recent approach has been to modify the SLC method by introducing rockfill into the void atop the production zone to provide continued support for the host rock and prevent it from caving. This paper discusses in detail the merits of the Modified SLC or MSLC. In comparison with other long-hole stoping methods that are predominantly practiced in metal mines, the MSLC method boasts several advantages. Early production achieved from the topmost level helps reduce the payback period. Productivity is enhanced due to multilevel mining without the use of sill pillars. The cost of backfilling is significantly reduced as there is no need for the construction of costly backfill plants. Continuous stoping is achieved without delays as mining and backfilling take place concurrently from separate mining horizons. A significant reduction in underground development costs is achieved as fewer slot raises and crosscuts are required for stope preparation. These merits of the Modified SLC method in steeply dipping orebodies are discussed by way of reference to real-life mine case studies. Dilution issues are addressed, and the benefits of top-down mining are explained. Typical mine design, ventilation, materials handling, and mining schedules are presented. Geomechanics issues associated with different in-situ stress environments are discussed and illustrated with simplified mine-wide 3D numerical modeling study.
EN
This article presents a comparison of the real amount of structural bending of a traditional residential building on curved mining ground with the bending results from an elastic model of the system: building + ground. Thanks to surveying measurements conducted during the exploitation front, the relationship between the curvature of the building and the curvature of the area in its direct vicinity was determined. The measurement work lasted one and a half years. Observation results collected in nature verify the deformation results of the modelled structure in the approach proposed by the guidelines for designing buildings in mining areas in Poland. Building Research Institute Instructions, Guidelines, Guidance 416 (2006) allows the adoption of an elastic model for the structure, and for the ground, it allows the adoption of linear elastic features characteristic of Winkler elastic ground. The main purpose of the work was to determine the overestimation of stress in the modelled building resulting from the use of a simpli-fied, computational engineering approach.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.