The paper describes the application of a simulation environment (Tecnomatix Plant Simulation) for solving a real manufacturing problem. The studied case consisted in rebalancing the production line with a specified number of operators on the line. The first stage of the study involved determination of the production cycle and key performance indicators. The production system was then divided into work cells. After that, proposed design assump-tions were verified via a simulation model.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.