Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  mining key performance indicators
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The production performance of two hoisting systems operating in series at an underground gold mine was evaluated based on several key performance indicators (KPIs). All the KPIs were lower than the mining industry benchmarks, mainly due to lengthy and recurrent machine downtimes. Frequent breakdowns, power cuts, poor maintainability, and shaft flooding were some of the factors affecting the overall performance of these systems, as captured on the developed Fishbone Diagram. The average cycle times were much longer than expected, and the production rates were significantly lower at a 5% significance level than the requisite 160 tonnes per day. There were mismatches in the throughputs of the hoisting systems, indicating an unbalanced hauling process. Therefore, the current maintenance strategy for the hoisting systems warrants review in order to cut downtime. Alternative power sources are needed to complement electricity from the national power grid. The methods, findings, and data analysis techniques applied in this study can be used for evaluating the performance of mining equipment elsewhere, benchmarking and optimisation functions.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.