Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  mean squared load
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
1
Content available remote Mean Squared Load Criteria for Scheduling Independent Tasks
EN
Results of this paper extend the set of criteria which characterize the scheduling quality as well as the set of possible scheduling strategies. A new view on the minimum makespan criterion is presented in terms of the mean squared load of processing units. This leads in turn to the development of new scheduling algorithms. The interaction between processes of minimizing the new criteria and the maximum finishing time (makespan of the schedule) was discovered. We show the possibility of minimizing the maximum finishing time by minimizing the new criteria that characterize the mean squared load of processing units. Moreover, the optimal workload of processing units determined with the use of the proposed criteria is usually smoother (more balanced) than that found for traditional ones.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.