The embankment dam Skalička is planned in the Moravian part of the Czech Republic on the river Bečva. Previous studies indicated that from discussed five variants the most appropriate one is a lateral multi-purpose reservoir with significant flood protection function. This paper discusses hydrogeological and groundwater flow issues related to the selected variant. The results are part of an extensive hydrogeological study realized at the dam site consisting of geophysical survey, geological and hydrogeological boreholes and groundwater flow numerical modelling. The subject of the work was to quantify the impacts of the selected variant of the Skalička dam on the Quaternary aquifer. At the same time technical issues were studied such as the subsoil sealing elements, drainage system and other arrangements in the area of reservoir and its surrounding. Another aim was to guarantee dam safety with respect to the seepage. The results of the survey and groundwater modelling facilitated to formulate recommendations for further designing of the dam within recently elaborated feasibility study.
PL
W morawskiej części Republiki Czeskiej na rzece Bečva planowana jest budowa zapory skalnej Skalička. Poprzednie badania wskazały, że spośród rozważanych pięciu wariantów najwłaściwszym jest boczny, wielofunkcyjny zbiornik pełniący istotną rolę przeciwpowodziową. W artykule omówiono zagadnienia hydrogeologiczne i związane z przepływem wód gruntowych w wybranym wariancie. Wyniki analizy stanowią część szeroko zakrojonego badania hydrogeologicznego przeprowadzonego w miejscu lokalizacji zapory, składającego się z analizy geofizycznej, odwiertów geologicznych i hydrogeologicznych oraz modelowania numerycznego przepływu wód gruntowych. Przedmiotem pracy było ilościowe określenie wpływ wybranego wariantu zapory Skalička na czwartorzędowe piętro wodonośne. Jednocześnie zbadano również kwestie techniczne, takie jak elementy uszczelnienie podglebia, system odwadniający oraz pozostałe elementy zagospodarowania obszaru zbiornika i jego otoczenia. Innym celem było zagwarantowanie bezpieczeństwa zapory w aspekcie przesączania. Rezultat badania oraz modelowanie wód gruntowych ułatwiły sformułowanie zaleceń dotyczących dalszego projektowania zapory w ramach niedawno opracowanego studium wykonalności.
EN
In parallel with intensified development of the Polish part of Uznam Island, there is an increase in the demand for drinking water in this area. This island ranks among areas with low water resources, which at the present time are allocated. In order to create the prospect of increased groundwater resources, a concept has been developed that allows for the recovery of part of the freshwater from drainage systems which discharge into the waters of Szczecin Lagoon or the River Świna. The present article discusses the secondary use of water from drainage systems for supply of the Wydrzany resource area. The notion of using water from the White Bridge pumping station was considered the most promising. The catchment area of the polder is 880 ha, 280 ha of which are located on Polish territory. The White Bridge pumping station transfers water from the polder, which it leads to the Peat Channel which, in turn, drains water gravitationally into Szczecin Lagoon. Here, results of simulations aimed at the use of drainage water to improve upon groundwater resources in the “Wydrzany” intake are discussed. On the basis of these simulations of artificial water supply to the intake, an increase of available resources by up to 50 per cent may be expected.
PL
Celem pracy była ocena jakości gleb pod eksploatowanymi liniami kolejowymi. Wytypowano linie poza potencjalnymi zewnętrznymi źródłami zanieczyszczeń. Próbki pobierano na odcinku szlakowym poddanym przebudowie i przed przebudową, na terenie stacji kolejowej i zaplecza technicznego do naprawy sprzętu kolejowego. Do badań wybrano fragment jednotorowy, dwutorowy, z podkładami drewnianymi i betonowymi, w sąsiedztwie rozjazdów podlegających smarowaniu, w miejscu odstawiania wagonów i wizualnie zanieczyszczonych. Zbadano m. in. zawartość WWA, cynku, miedzi, ołowiu, PCB. Nie stwierdzono większych zawartości badanych związków w porównaniu do gleb ornych zlokalizowanych w sąsiedztwie linii i ich oddziaływania na tereny sąsiednie. Zawartość badanych związków nie różniła się na różnych fragmentach linii o odmiennych właściwościach. Zawartość WWA, uważanych za jedno z głównych zanieczyszczeń emitowanych z linii kolejowych, pozwalała ocenić glebę linii kolejowych i stacji kolejowej jako niezanieczyszczoną lub mało zanieczyszczoną.
EN
The aim of the study was to assess the quality of soils underneath operating railway lines. The lines selected for the examination were outside the reach of external sources of potential pollution. The samples were collected along a plain line section after and before an upgrade work, within the station area and in a railway equipment repair yard. The assessment covered the following types of sections: single-track, double-track, with wooden and concrete sleepers, adjacent to switches subject to lubrication, in the car shunting yard and visibly contaminated areas. The samples were tested for the content of PAH, zinc, copper, lead and PCB. The study did not find evidence of increased levels of the above-listed compounds as compared to the levels found in arable soils located in the vicinity of the line or of their influence on adjacent lands. The content of the examined compounds did not differ depending on the type of line section or its properties. The content of PAH, considered one of the main railway-related pollutants, was sufficiently low to classify the soil along the line and within the station area as unpolluted or slightly polluted.
PL
Systemy krążenia wód podziemnych w rejonie Zalewu Kamieńskiego zależą od budowy geologicznej, ukształtowania terenu a także ascenzji solanek i ingresji wód morskich. Do obliczenia czasu przepływu wody w rozpatrywanych warstwach w ośrodku o znanej porowatości aktywnej posłużono się programem TFS opracowanym przez K. Burzyńskiego. Model przepływu wód podziemnych opracowano dla przekroju hydrogeologicznego wzdłuż linii Międzywodzie–Kamień Pomorski–Golczewo. Czasy przepływu i wymiany wód podziemnych obliczono dla dwóch przypadków, pierwszy dla okresu przed transgresją litorynową (7500 lat temu) oraz drugi – dla współczesnych warunków przepływu wód podziemnych. Czas wymiany wód podziemnych w rejonie Zalewu Kamieńskiego jest obecnie prawie dwa razy dłuższy niż przed tą transgresją.
EN
The study area is located in the north-western part of the Pomeranian sector of the Mid-Polish Anticlinorium. Factors influencing groundwater circulation systems in the area of the Kamieński Lagoon depend on the geological structure, ascension of brines from Mesozoic strata and the sea water encroachment. The calculation of groundwater flow time along the stream line was carried out for rocks of specified active porosity using a mathematical program developed by K. Burzyński. The groundwater flow model was used for a hydrogeological cross-section line along: Międzywodzie–Kamień Pomorski–Golczewo in the south. The numerical calculations of the flow path from the recharge area to the discharge base level of the present Baltic Sea and the base level in the beginning of the Littorina Sea (7500 years BP) were done to define the groundwater flow time. It has been stated that the current flow time in the fresh groundwater circulation system in the area of the Kamieński Lagoon is nearly twice longer than it was 7500 years ago.
PL
W artykule przedstawiono wyniki modelowania przepływu wód podziemnych, którego głównym celem było określenie wielkości zasilania infiltracyjnego przypowierzchniowego poziomu wodonośnego. Zadanie to zostało zrealizowane dzięki rozpoznaniu systemu hydrogeologicznego opartego na własnym monitoringu stanów wód podziemnych i powierzchniowych prowadzonym w latach 2007–2011. Wielkość zasilania uzyskana na modelu hydrodynamicznym, w przeciwieństwie do wyników metody wskaźnikowej określania zasilania, stanowi wiarygodny element bilansu wodnego, wyznaczonego dla filtracji ustalonej (średni stan roczny). Średnia wielkość zasilania określona dla obszaru badań to 96 mm/rok, przy czym otrzymane przedziały zasilania są znacznie zróżnicowane przestrzenie, a ich układ skutkuje dwudzielnością obszaru, nawiązującą do jednostek geologiczno-geomorfologicznych.
EN
The article presents the results of groundwater flow modelling, which the main aim was an assessment of infiltration recharge value of shallow aquifer. The task was realized through recognition of hydrogeological system on the basis of own groundwater and surface water level monitoring, conducted in the years 2007–2011. Recharge values calculated on hydrodynamic model, against index method of recharge estimation, are reliable element of water balance for steady-state filtration (average year state). Mean value of recharge in the study area is 96 mm/year. Spatial arrangement of recharge values refers to two geological and geomorphologic units.
6
Content available remote Model przepływu wód podziemnych w rejonie tunelu pod Martwą Wisłą
PL
Badania modelowe zostały wykonane w celu określenia wpływu wód podziemnych na tunel drążony w obrębie plejstoceńsko-holoceńskiej warstwy wodonośnej. Z drugiej strony, ważne było ustalenie wpływu tunelu na układ ciśnień, warunki przepływu i zasoby czwartorzędowego piętra wodonośnego w sąsiedztwie inwestycji. Do badań modelowych wydzielono obszar o powierzchni 14,8 km2, schematyzację warunków występowania wód podziemnych wykonano na podstawie danych z 223 otworów hydrogeologicznych oraz geologiczno-inżynierskich. W obrębie plejstoceńsko-holoceńskiego poziomu wodonośnego występują liczne przewarstwienia mułków, namułów i iłów, dlatego został on podzielony na modelu na 6 warstw, trzy przepuszczalne i trzy słaboprzepuszczalne. Wyniki obliczeń pokazują, że tunel w bardzo niewielkim stopniu wpływa na przepływ wód podziemnych. W bilansie przepływu wód nie zaznaczają się żadne zmiany po wprowadzeniu tunelu. W warstwach wodonośnych, przez które przechodzi tunel obserwuje się niewielkie wygięcie hydroizohips (zmiana położenia zwierciadła wody w zakresie od 0,5 do 3,0 cm). Zastosowanie metody TBM i budowa tunelu bez odwodnień sprawia, że nie ma zagrożeń ilościowych dla zasobów wód podziemnych piętra czwartorzędowego w sąsiedztwie inwestycji.
EN
Model research were made to determine the groundwater impact on the hollow tunnel in Pleistocene-Holocene aquifer. On the other hand it was important to determine the effect of the tunnel on the watertable level, flow conditions and resources of the Quaternary aquifer in the vicinity of the investment. The model studies area was 14.8 km2. Schematization of the groundwater conditions were based on data from 223 hydrogeological and geological-engineering boreholes. Within the Pleistocene-Holocene aquifer there are numerous thin layers of silts, organic silts and clays, and therefore it was divided into the model to six layers, three permeable and three semipermeable. The calculation results show that the tunnel only slightly influence on groundwater flow. In groundwater balance no changes are noticeable after simulating the tunnel. In aquifers, through which the tunnel is simulated, slight bend of watertable level is observed (changing water table level from 0.5 to 3.0 cm). Application of TBM method and construction of the tunnel without drainage, makes no quantitative risks of groundwater resources in the vicinity of the investment.
PL
W artykule podjęto próbę ustalenia klas dokładności numerycznych modeli przepływu wód podziemnych. Wstępnej analizie poddano 14 modeli hydrogeologicznych wykonanych przez autorkę. Są to modele przepływu wód podziemnych występujących w porowatych utworach kenozoiku lub kredy na obszarze Polski północnej. Analizowano wartości błędów kalibracji, błąd bilansu przepływu, powierzchnię obszaru modelowania, skalę odwzorowania oraz liczbę otworów hydrogeologicznych, na podstawie których skonstruowano model. Przedstawiono wstępny obraz zróżnicowania dokładności modeli, który w następnym etapie został podzielony na klasy. Ustalone klasy dokładności modeli pomogą „umieścić” każdy rozpatrywany model w odpowiedniej klasie, co da pogląd na dokładność uzyskanych obliczeń. W zależności od skali modelu i stopnia skomplikowania warunków hydrogeologicznych klasy dokładności modelu mogą się różnić. Przedstawioną próbę klasyfikacji należy traktować jako wstępną. W kolejnym etapie należy uwzględnić dane z większej liczby modeli, wykonanych również przez innych autorów.
EN
In the article attempt at groundwater flow models credibility classification was made. 14 hydrogeological models built by the author of the article were taken to preliminary analysis. These are models of groundwater appearing in porous Cenozoic and Cretaceous rocks, mainly found in the area of north Poland. Examined parameters of the model were the calibration errors (mean absolute error), a water balance error, modeling area, model scale and number of hydrogeological boreholes analyzed in model construction. On the basis of this data a preliminary image of diversifying the models accuracy was shown, in the next stage it was divided into models credibility classes. Established classes of the models credibility can be helpful in analyzing every single model calculations accuracy. Depending on the scale of the model and groundwater occurring conditions the model accuracy can differ. Described classification is preliminary, and in the next stage data from large number of models should be analyzed.
PL
Ze względu na zagrożenie jakości wód podziemnych w Toruniu planowana jest budowa nowego ujęcia Wrzosy III. Dla nowej lokalizacji ujęcia skonstruowano model matematyczny. Obszar badań ma powierzchnię 15 km2. Wody podziemne występują tu w osadach czwartorzędu. Zasilanie wód podziemnych odbywa się głównie na drodze infiltracji opadów (średni moduł zasilania infiltracyjnego wynosi 109,3 mm/rok). Warstwa wodonośna jest również zasilana poprzez dopływ lateralny spoza obszaru badań, od północy z Wysoczyzny Chełmińskiej, oraz poprzez infiltrację z Łysomickiej Strugi. Wydajność eksploatacyjna została oszacowana na około 270 m3/h, przy depresji około 5 m.
EN
The Wrzosy III intake is investigated on account of risk of groundwater quality degradation, to change its location. Therefore, a mathematical model was developed for the new location. The research area covers about 15 km2. Groundwater occurs in the Quaternary formations and the aquifer is recharged mainly by precipitation (infiltration recharge module is 109 mm/year). The rest of the inflow comes from lateral flows from beyond the study area and also to some extent from a river. The safe yield on the new Wrzosy III intake can be estimated at 270 m3/h, with expected drawdowns of about 5 m.
PL
Przedstawiono wyniki obliczeń numerycznych przepływu wody w warstwie wodonośnej ujęcia infiltracyjnego. Do rozwiązania problemu wykorzystano równanie filtracji wody ze swobodnym zwierciadłem wody. W obliczeniach w warunkach nieustalonych warunek początkowy obliczono przy założeniu dopuszczalnej wydajności ujęcia (100 000 m3/d). Jako warunek brzegowy przyjęto funkcję wahania poziomu zwierciadła wody w stawach infiltracyjnych w czasie. Obliczenia wykonano dla okresu 10 dni od momentu odcięcia zasilania ujęcia z Brdy, wynikającego z okresu suszy albo skażenia wody płynącej. W artykule przedstawiono rozwiązanie dla 7 dni, ponieważ dla dłuższego okresu należy wykonać nowy model pracy ujęcia infiltracyjnego.
EN
This paper presents a numerical simulation of groundwater flow in an infiltration intake. Calculations were made in transient conditions using the Modflow program (included in GMS ver. 3.1). The initial conditions of simulation were computed in the steady-state conditions for the admissible exploitation (100 000 m3/day). The boundary conditions were calculated as a time-dependant function of the water level in infiltration basins. As a result, flow balance during hydrological drought is calculated. Numerical calculations were made for a period of 10 days, but only a seven-day period is presented. For a longer period, the numerical model of infiltration intake should be reanalysed.