Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  geologiczny model 3D
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The article presents the results of works concerning evaluation of undeveloped deposits in the Upper Silesian Coal Basin and an estimation of hard coal reserves which can be developed by 2050. Evaluation of hard coal deposits was established on criterions choice and their score determination. On the basis of obtained the final score and after consultations with experts in the field of hard coal mining, there were selected three areas of undeveloped deposits with the amount of about 1.99 Gt (billion metric tons) of anticipated economic resources which can extend the coal reserve base located in the direct vicinity of operating hard coal mines. Additionally, one undeveloped coal deposit with estimated resources amounts to about 1.15 Gt was selected as a potential deposit whose resources could be included in the reserves of operating mines, up to the depth of 1,500 metres. Deposit areas were selected and hard coal reserves were estimated with a view to building new coal mines. For Oświęcim-Polanka deposit, there was built a 3D geological model with estimated the amount of 924 Mt (million metric tons) of anticipated economic resources of coal. An example of a deposit development with ventilation, extraction and transport/haulage underground roadways connecting coal seams with the surface are presented. The designed mine working was placed in the 3D geological deposit model which is a useful tool for designing spatial deposit management.
EN
A comprehensive 3D model has been developed for the Dutch on- and offshore. This model consists of a detailed 3D structural framework of the deep subsurface including 10 major units from the Late Permian Upper Rotliegend Group up to the Neogene Upper North Sea Group. This overview presents the workflow for building the detailed structural model including the time-to-depth conversion and the assessment of uncertainties.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.