W artykule omówiono przypadek nieudanego wzmocnienia podłoża gruntowego pod posadzki obiektu wielkokubaturowego i nawierzchni wokół tego budynku (drogi, parkingi). Zastosowane kolumny DSM, a następnie w procesie naprawy kolumny jet-grouting okazały się rozwiązaniem nieefektywnym. Wykazano, że metody posadowienia obiektów budowlanych muszą być indywidualnie rozpatrywane oraz że w tej dziedzinie nie ma technologii uniwersalnych.
EN
The article considers the case of unsuccessful ground reinforcement under the floor of a large-scale building and the surface around this building (roads, parking lots). The DSM columns used first and then in the process of repairing the jet-grouting columns proved to be an ineffective solution. It is shown that the methods of foundation of building objects must be considered individually and that there is no universal technology in this area.
2
Content available remote Zmiany w europejskich normach fundamentowych
PL
Normy europejskie dotyczące projektowania (Eurokod 7), wykonywania i badań podłoża są systematycznie rozwijane i ulepszane. W artykule zebrano informacje o zmianach norm i nowych dokumentach z lat 2013 – 2014 oraz aktualne informacje o ich wdrażaniu w Polsce.
EN
European Standards for foundations design (Eurocode 7), construction and ground investigation are constantly developed and improved. The paper compiled information on changes in norms and new documents made in 2013 – 2014, and updated information on their implementation in Poland.
3
Content available remote Niskociśnieniowe pale iniekcyjne poddane osiowemu obciążeniu cyklicznemu
PL
Szerokie zastosowanie fundamentów palowych przy posadawianiu konstrukcji inżynierskich oraz przy wzmacnianiu już istniejących fundamentów o tradycyjnym posadowieniu bezpośrednim, zdeterminowało konieczność pracy pali w różnych warunkach ich obciążenia.
EN
In view of extensive use of pile foundations for engineering structures and reinforcement of existing traditional shallow foundations, the piles are expected to perform in various load conditions. Regardless of the loads with fixed time, structures (such as wind turbines, abutments of bridges, road and railway viaducts and structures in areas prone to seismic or para-seismic risks) are subjected to repeated loads with various nature of individual cycles.
4
Content available remote Analiza posadowienia turbin wiatrowych
PL
Analiza zagadnień geotechnicznych jest procesem złożonym, wymagającym uwzględnienia geometrii konstrukcji, zmienności przekazywanych oddziaływań w czasie, etapowania procesu budowlanego oraz wieloaspektowego zachowania ośrodka gruntowego. Odpowiednio zaprojektowane wzmocnienie podłoża gwarantuje bezpieczne i ekonomiczne rozwiązanie problemu posadowienia elektrowni wiatrowych.
EN
Designing the foundations of wind turbines is a complicated issue. Wind power stations should be classified in III geotechnical category as the ‘objects of energy industry’. This means that during the foundation design stage of such objects, attention should be paid to the data received for design, especially the quality and type of earth material assessment. Due to the complexity of statistical and dynamical issues in the aforementioned construction, the role of designers and the geotechnical environment is raising the investors’ interest in the issues related to the assessment of earth surfaces which form the output material for designing wind towers’ foundations. Adequately designed reinforcement of the surface guarantees safe and economical solution to the issue of foundation.
5
Content available remote Postęp w dziedzinie fundamentowania mostów
EN
Recent principles of foundations design and construction are described and innovation solutions are given: steel pipe sheet pile foundations, driven large diameter steel pipe piles, jacked foundation piles, Hyper-Mega piles, improved technology of caisson and well foundations, slurry-wall and deep water foundations, and also influence of off shore platform engineering on development of bridge foundations. Conception of hybrid piled raft foundation and test technology of very large capacity foundation was given. Examples of innovation solutions applied in large bridge constructions are provided.
EN
The Pentominium will be the tallest and one of the most luxurious apartment in the world. Thoroughly carried out ground tests and numerous analysis at the design stage led to a strong reduction in the cost of installation.The project of foundation, including the analysis of subsidence piles, was supported by several studies and a specialist computer program. The Pentominium may bean example of a perfect cooperation of people responsible for the underground construction of the building: geologists, planners, engineers and foundation contractors.
EN
Considered is a case study of a bridge pylon supported on bored piles of 1.5m in diameter. Different piling designs are compared with respect to their safety. The original design comprised 88 piles, each 30 m long. The modified design comprised reduced number of bored piles, with grouted base and pile length shortened to 24 m. In the first part of the paper values of safety margin, Cornell’s reliability index and failure probability for the original design and for the modified design with 77 piles were computed using the framework of the theory of reliability. Random variables included adopted ultimate base and shaft unit resistances and the technological factor for pile shaft, all considered as normal random variables with the coefficient of variation of 0.1. In the second part the number of grouted piles was also varied between 77 and 84, and the resulting safety parameters were compared with the original piling design.
PL
Soletanche Polska specjalizuje się w fundamentowaniu głębokim. Wchodzi w skład grupy Soletanche Bachy. W 2010 r. na zlecenie KOPEX Przedsiębiorstwa Budowy Szybów firma zaprojektowała i wykonała wstępną obudowę pierwszych 30 m szybu 1-Bzie w KWK Zofiówka w Jastrzębiu Zdroju, gdzie w ramach udostępniania nowych pokładów węgla kamiennego budowany jest nowy szyb o głębokości ok. 1164 m.
EN
The choice of deep foundation method needs to be preceded by a thorough analysis of the conditions in every engineering project studied. The application of deep foundations construction is usually called for in cases when transferring the load forces from the construction itself to the deeper bearing layers of the ground, if the shallow layers have insufficient capacity. This solution is a result of a number of factors, such as construction requirements and economic conditions. Interfering in deep ground layers carries a load of unknowns risks and threats. Therefore, ignoring the construction issues during the project preliminary stage may lead to serious consequences during the realization of the construction project.
10
Content available remote Posadowienie obiektów mostowych na palach prefabrykowanych
EN
The technology of prefabrication of reinforced concrete piles enables the construction of fast and safe foundations for any kind of construction objects. A large number of project applying a wide range of prefabricated piles of various lengths and widths has been successfully completed. The technology is mostly used for bridge construction. While the technology itself has existed for many years, the piles made from reinforced concrete seem to have bright future ahead. Compared to other European countries, in the aspect of deep foundation, we are still a developing market with a lot to achieve. Whether or not it will be a good one for pile industry, successful completed projects, such as Hennebique's, will decide.
EN
The paper deals with some selected engineering-geological conditions for the needs of landscape planning. The geofactors to be studied are numerous (engineering-geological zones, workability of rocks, type of preQuarternary bedrock, floodlands, surface subsidence (caused by undermining), slope movements and radon hazard), while the paper deals with two of them. The first one is undermining, which is evaluated on the basis of terrain subsidence caused by underground mining. It is a significant criterion for the utilization of former mining landscape that is as an interest area the subject of the study. The area is determined by a map sheet No. 15-43-10 in 1:10 000 scale, covering the city districts of Slezska Ostrava, Moravska Ostrava, Vitkovice and Radvanice. The second monitored geofactor is slope deformation. There is an important limiting factor for land use and it must not be ignored during landscape planning. The study is motivated by an insufficient consideration of such information during landscape planning, issuing building permits, etc.
PL
W artykule omówiono wybrane czynniki inżyniersko-geologiczne wpływające na planowanie krajobrazu. Spośród licznych geoczynników (strefy inżyniersko-geologiczne, urabialność skał, rodzaj skał nadkładu czwartorzędu, obecność zalewisk, osiadania spowodowane podebraniem terenu działalnością górniczą, ruchy osuwiskowe, zagrożenie radiacyjne) wybrano dwa. Pierwszy to podebranie, które jest określane na podstawie osiadań powierzchni terenu na skutek podziemnej eksploatacji węgla. Jest to istotne kryterium możliwości wykorzystania terenu pogórniczego, co jest głównym tematem rozważań w niniejszym artykule. Drugim analizowanym geoczynnikiem jest deformacja zboczy (ruchy osuwiskowe). Jest to z kolei ważny czynnik ograniczający możliwość użytkowania terenu pogórniczego, który nie może być pomijany przy pracach w zakresie planowania krajobrazu. Przyczyną wykonania powyższej analizy było niewystarczające branie pod uwagę czynników geoinżynierskich przy planowaniu zagospodarowania krajobrazu, wydawaniu decyzji o pozwoleniu na budowę itd. Analizowany w artykule obszar pokazują mapy nr 15-43-10 w skali 1:10 000, obejmujące okręg gmin Slezska Ostrava, Moravska Ostrava, Vitkovice, Radvanice.
12
Content available remote Ściany szczelinowe Złotych Tarasów.
PL
Złote Tarasy to wielofunkcyjne centrum, powstające w Warszawie pomiędzy ulicami Chałubińskiego, Złotą i Emilii Plater, od strony południowej sąsiadujące z dworcem kolejowym Warszawa Centralna. Przyszły kompleks znajduje się w geograficznym i funkcjonalnym środku stolicy i w zamierzeniu jego twórców ma stać się punktem charakterystycznym miasta, chętnie odwiedzanym przez mieszkańców Warszawy. W artykule został przedstawiony przebieg początkowych robót budowlanych tj. wykop, zbrojenie, betonowanie oraz system monitoringu stworzony na potrzeby tej budowy.
PL
Obecnie standardem są 2 lub 3 kondygnacje podziemne w obiektach budowanych w centrum miast, a coraz częściej pojawiają się projekty budynków z 4 i 5 kondygnacjami pod ziemią. Przedmiotem artykułu jest Hotel Ibis Stare Miasto oraz Centrum Wielofunkcyjne Bonifraterska. Oba obiekty stykają się jedną ze ścian, co przy realizacji ścian szczelinowych CW Bonifraterska, odległych od Hotelu Ibis o 20 cm, wymagało od firmy fundamentowej dużego doświadczenia. W artykule omówiona została technologia wykonania kondygnacji podziemnych obu wymienionych wyżej obiektów.
14
Content available remote Specyfika fundamentowania wieżowców
PL
Artykuł dotyczy fundamentowania budynków wysokich. Autorzy podkreślają że posadowienie budynku wysokiego jest problemem bardzo złożonym, w którym dominują trzy grupy zagadnień: -rozwiązania funkcjonalne zmuszające do budowania kondygnacji podziemnych; -zapewnienie stateczności budynku szczególnie ze względu na parcie wiatru; -przeniesienie na grunt olbrzymich obciążeń jednostkowych. Skala trudności fundamentowania budynków wysokich zależy od ich wysokości, ale także od przewidywanego programu wykorzystania kondygnacji podziemnych .W budynkach najwyższych posadowienie jest bardzo trudne pod względem konstrukcyjnym i technologicznym.
15
Content available remote Specjalistyczne roboty fundamentowe
PL
W artykule amówiona została działalność Przedsiębiorstwa Usług Inzynieryjnych MINIEKT Sp. z o. o. Przedsiębiorstwo to powstało w 1988 r. Specjalizuje się w zakresie : mikropali, pali wierconych, kotew gruntowych, gruntu gwoździowanego, ścian szczelinowych. Wśród 9 zrealizowanych przez MINIEKT obiektów znajdują się m. in.: fundamenty podpór mostu przez rzekę Wierzbicę w miejscowości Stara Biała koło Płocka i przebudowa mostu przez rzekę Ropę w miejscowosci Topoliny.
16
Content available remote Nowoczesne metody wzmacniania gruntów
PL
Artykuł dotyczy technologii wzmacniania gruntu opracowywanej i wdrażanej przez firmę MENARD SOLTRAITEMENT. Technologie wzmacniania gruntów wdrażane przez firmę MENARD SOLTRAITEMENT dzielą się na dwie grupy: -wzmacnianie bez stosowania materiałów dodatkowych, -wzmacnianie z zastosowaniem materiałów dodatkowych. Rodzaj technologii wzmacniania gruntu dobiera się w zależności od sposobu posadowienia gruntu i miąższości jego warstwy ściśliwej.
17
Content available remote Nowe technologie wykonywania pali
PL
Rozwój technologii wykonywania pali fundamentowych związany jest z czynnikami kształtującymi proces budowy. Coraz trudniejsze warunki terenowe i gruntowe, w których pale są wykonywane, zmuszają do poszukiwania bardziej uniwersalnych konstrukcji. Aby sprostać konkurencji ( szczególnie zachodniej) polskie firmy budowlane również wprowadzają nowe technologie. Należą do nich: pale CFA, jet-grouting, pale Vibrex, pale Vibrex, pale wkręcane Vibro-Fundex, pale Tubex, pale wiercone z zastosowaniem iniekcji pod podstawami.
18
Content available remote Fundamenty Hotelu Intercontinental w Warszawie
PL
Budowę Hotelu Intercontinental przy ul. Emilii Plater w Warszawie firma Porr Project und Hochbau AG rozpoczęła na początku marca 2001 r. W pierwszej fazie budowy bardzo trudnym przedsięwzięciem, zarówno pod względem technicznym jak i organizacyjnym, było wykonanie wykopu w celu wybudowania pod przyszłym wieżowcem garażu. W artykule zastał szczegółowo omówiony zakres prac zrealizowanych przez Oddział Kompleksowego Budownictwa Fundamentowego Hydrobudowy-6 SA. Obejmował on między innymi: wykonanie ścian szczelinowych w celu zabezpieczenia wykopu, ścian szczelinowych wzmacniających podłoże płyty fundamentowej, baret słupów tymczasowych, wykopu otwartego i podstropowego.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.