Cost overrun during construction is one of the most common problems occur in construction projects around the world, which also includes the area of Chongqing in China. At present, there are few studies related to cost overruns at the construction stage of high-rise residential building projects (HRBPs) in Chongqing. The purpose of this study is to develop effective control measures from the contractor’s perspective to help projects to minimize cost overruns during the construction phase of HRBPs in Chongqing. Firstly, through the literature review and semi-structured interviews, 65 cost overrun-related risk factors in construction projects were identified. All the risk factors have been prioritized through the analytic hierarchy process (AHP) based on their importance to project success. Out of the 65 factors identified, 12 were classified as the critical ones that have a great potential to instigate a cost overrun during construction to take place in the real project. There were four risk factors that have the greatest impact on cost overruns, and their weights were 0.04 or above, including low bid, force majeure, undetailed/inaccurate geological survey data, and increased loan interest rates. Finally, control measures were developed for these four critical cost overrun risk factors (CCORFs). The measures developed provided a guideline to control the risk of cost overruns and clear control key points to help contractors minimize cost overruns on construction projects.
2
Content available remote Zarysowania niekonstrukcyjnych ścian murowanych budynku w stadium realizacji
PL
W artykule omówiono zarysowania ścian z bloczków silikatowych w wysokim budynku w stadium realizacji. Celem pracy było ustalenie przyczyn wystąpienia tych uszkodzeń oraz podanie sposobu ich naprawy. W pierwszym etapie postępowania przeprowadzono inwentaryzację występujących uszkodzeń rozpatrywanych ścian oraz szczegółową analizę projektu konstrukcji i murowanych ścian budynku. W celu określenia wpływu ugięć stropów na zachowanie się analizowanych ścian wykonano obciążenie próbne stropu na 47 kondygnacji budynku. Jego całkowite (rzeczywiste) ugięcie pomierzone metodami geodezyjnymi wyniosło 46 mm. Na tej podstawie sformułowano wnioski dotyczące przydatności zastosowanych rozwiązań ścian i wskazano rozwiązania alternatywne.
EN
The paper presents a case study of the cracking of nonbearing walls made of silicate masonry units in a tall building at its construction phase.The objective of the paper was the determination of the causes of cracks to the walls under consideration and their repair method. The measured total deflection of the +47 floor due to test load reached the value 46 mm which exceeded the permissible value 30 mm. This fact enabled us to explain that the cracking of the examined walls was caused by the excessive floor deflections. Conclusions are drawn concerning the necessity of the replacement of the constructed walls by the alternative ones made of gypsum and paperboard. Moreover, the recommendations are made to take into account the effect of long-term floor deflections on the masonry wall.
3
Content available remote Czynniki ryzyka w cyklu życia budynków pasywnych
PL
W artykule opisano cykl życia budynku pasywnego wraz z określeniem czynników ryzyka na każdym jego etapie. Czynniki ryzyka w całym cyklu życia budynków wznoszonych w wersji pasywnej zostały zidentyfikowane w badaniach własnych. Artykuł przedstawia także rekomendacje, w zakresie rozwiązań projektowych, niwelujące powstanie zagrożeń związanych z realizacją budowy obiektów pasywnych.
EN
The article describes the life cycle of a passive house together with the risk factors for each stage of the building life cycle. Risk factors throughout the life cycle of the passive house were identified as a part of the own research. The work also presents recommendations in the area of design solutions, eliminating the threat connected with a construction of the passive houses.
4
Content available remote Aktualne kierunki kształtowania szkieletowych budynków drewnianych
PL
W artykule przedstawiono metody produkcji, realizacji i eksploatacji szkieletowych budynków drewnianych. Omówiono trzy metody realizacji budynków, konstrukcję elementów i modułów oraz fazy realizacji przemysłowej budynków. Podano również metody analiz obliczeniowych nośności i deformacji. Analizę naprężeń w konstrukcji modułu zaprezentowano na konkrentym przykładzie obliczeniowym.
EN
Paper presents main directions in the range of production, realization and exploitation of wood-framed buildings with sheathing. Presented are three methods of building accomplishment, construction of components and modules and phase of industrial construction. The methods of numerical analysis of load capacity and deformation are also given. The stress analysis in the module construction is given in the attached calculation example.
PL
W pracy omawiany jest obiekt gruntowo-powłokowy o największej na świecie rozpiętości powłoki - obecnie w końcowej fazie budowy, w Ostródzie. Obiekt zaprojektowano z wykorzystaniem norm amerykańskich i kanadyjskich. Powłokę utworzono z blachy falistej UltraCor bez stosowania nakładek lub żeber usztywniających. Powłoka wyróżnia się mniejszą sztywnością od dotychczas stosowanych blach SuperCor ale z nakładkami i wypełnieniem betonem. Jednak stal z której wykonano blachy jest o wyższej wytrzymałości niż w tych o niższym profilu. Z uwagi na rekordową geometrię powłoki na obiekcie realizuje się kontrolę jej deformacji podczas budowy. Jednym z wykonywanych pomiarów są przemieszczenia służące do określania zmiany promienia krzywizny w kluczu powłoki. Na obiekcie realizuje się również pomiary tensometryczne dające bezpośredni pogląd na zmiany naprężeń w blasze falistej. W pracy zwrócono uwagę na duże zmiany krzywizny podczas budowy i możliwość ich określania na podstawie pomiarów geodezyjnych – powszechnie stosowanych na budowie.
EN
This paper describes soil-steel bridge with the largest span in the world. Structure is located in Ostróda (Poland) and it is currently in a final stage of realization. Structure was designed based on North American and Canadian standards. Steel shell is made from the corrugated structural plates with deepest on the market corrugation 500×237×9,65 mm (UltraCor) without any of reinforcing ribs. Single barrel of UltraCor has less stiffness then previously used SuperCor’s (381×140×7 mm) reinforced by EC Ribs (mirrored plate and encased concrete). Steel used for UltraCor has higher grade than steel used for smaller corrugation. Because of the large span ever used the control of the deformations during construction is carried out. One of the measurements are displacements used to determine the change of the radius of curvature of the shell crown point. Structures is also monitored with strain gauges giving direct view of the changes of stresses in a corrugated steel shell. The summary highlights large changes of radiuses of shell curvature and ability of determine them based on geodetic measurements – commonly used on the sites.
6
EN
The paper analyses the deformation of circumferential bands of shells made of corrugated metal sheets in soil-steel structures. A change of curvature in the crown of a shell is assumed as a measure of deformation. In the upper part of analysed objects, regardless of their cross-sectional geometry, e.g. arched or elliptical shaped, a section of shell with a constant radius of curvature R is nowadays designed. As a result of earth pressure, moving loads and the self-weight of metal sheets, the shape of this part is subjected to deformation with a noticeable deviation from the circular shape. The change of curvature radius is determined in the paper on the basis of three coordinates of measuring points that form a triangle inscribed in a circle. Every (asymmetrical) position of the measuring points is taken into account. A system of three such points is transformed into a form of an equilateral triangle, and thus the radius of curvature is determined. Based on the change of curvature formulated during the construction and exploitation of soil-steel structures, the bending moments and normal stresses in the shell crown can be estimated and therefore a safety evaluation of the objects is possible.
PL
W pracy analizuje się deformacje pasm obwodowych powłok wykonanych z blach falistych w obiektach gruntowo-powłokowych. Jako miarę deformacji przyjmuje się zmianę krzywizny w kluczu powłoki. W analizowanych obiektach, niezależnie od ich geometrii przekroju poprzecznego, przykładowo o kształcie łukowym czy eliptycznym, projektuje się w górnej części wycinek powłok o stałym promieniu krzywizny R. W wyniku ciężaru własnego blachy, parcia gruntu i obciążeń ruchomych kształt tej części podlega deformacji z widocznym odstępstwem od koła. Zmianę tego promienia krzywizny określa się w pracy na podstawie trzech współrzędnych punktów pomiarowych, tworzących trójkąt wpisany w okrąg. Uwzględnia się przy tym dowolne (niesymetryczne) położenie punktów pomiarowych. Układ trzech takich punktów transformuje się do formy trójkąta równobocznego, a stąd wyznacza się promień krzywizny. Na podstawie zmiany krzywizny powstałej podczas budowy i eksploatacji obiektów gruntowo-powłokowych można szacować momenty zginające i naprężenia normalne w kluczu powłoki, a więc możliwa jest ocena bezpieczeństwa obiektu.
PL
W pracy dzieli się konstrukcje gruntowo-powłokowe z blach falistych na dwie grupy. Podział ten wynika z niebezpiecznych sytuacji spowodowanych naprężeniami wynikającymi ze zginania powłok. Jedna z nich występuje w fazie budowy, podczas układania zasypki - jest wówczas kontrolowany wskaźnik wypiętrzenia ω. Druga sytuacja jest trudniejsza do identyfikacji gdyż występuje podczas użytkowania obiektu. Możliwość jej wystąpienia widoczna jest w końcowej fazie budowy obiektu, na co wskazuje wartość wskaźnika zmiany ugięcia η. W pracy analizuje się charakterystyczne przykłady obydwu grup powłok. Do oceny bezpieczeństwa obiektu przyjęto zależność ugięcia klucza powłoki i naprężenia normalnego określanego w pracy w postaci geometrycznej - zmiany krzywizny. W przykładach obliczeń wskazano na użyteczność podstawowych, dostępnych na budowie technik geodezyjnych. Umożliwiają one ocenę bezpieczeństwa powłoki na podstawie deformacji strefy klucza powłoki.
EN
Soil-steel structures made of corrugated sheets are divided into two groups in the paper. This division results from the critical situations caused by flexural stresses (bending stresses) in shells. One of them occurs in the stage of construction, during backfilling - index of uplift ω is then controlled. The other situation is more difficult to be identified as it occurs in the exploitation phase. The possibility of its occurrence is evident in the final stages of construction, which is indicated by the index of deflection change η. Specific examples of both shell groups are analysed in the paper. A relationship between shell crown deflection and normal stress determined in the work in a geometrical form - as a change of curvature - is used to evaluate the structural safety. Usefulness of basic surveying techniques, available during construction, is indicated in the calculation examples. They allow to assess the shell safety on the basis of the shell crown zone deformation.
8
Content available remote Modelowanie i analiza mostu extradosed w fazie budowy i eksploatacji
EN
This paper presents an example of modeling and analysis of an extradosed bridge structure which has been performed with the use of SOFiSTiK software. The input data for the development of models and execution of calculations was based on fragments of design documentation of a bridge over Vistula river in Kwidzyn, prepared by Transprojekt Gdańsk and made available to the authors in 2009. The main load bearing structure consists of a 6-span post-tensioned concrete girder, with cross-section of a 3.5m high 3-chamber box, additionally tensed with cables of extradosed type. The objective of the study was to develop computational models of the superstructure and their structural static analysis during two main phases, namely incremental launching and finally during operation of the bridge, when the target static scheme was achieved. The paper presents an analysis of the structure during incremental launching. The process of incremental launching has been modeled with the use of CSM module (Construction Stage Manager). The CSM is a part of the Sofistik environment which has been designed for modeling construction cycles and scenarios of structural systems which are to be built in stages. The methodology of development of numerical models has been described in detail, with regard to the capabilities of the used software. The paper presents the way that the geometry of the bridge has been generated, the method of simulating the incremental launching as well as the types of the loads which have been applied to the structure. The studies have been conducted on two separate numerical models. The numerical models consist of bar elements situated in a two-dimensional and three-dimensional spaces. The model created for the purpose of the operating stage analysis has been presented with regard to generation of the structure, division into finite elements, modeling of inner and outer tension cables, applied loads and the criteria assumed for analysis of the structure. Moreover, the authors present an alternative post-tensioning system, as compared to the one assumed in the building design, which ensures limited compression of the structure. Finally, the paper contains the conclusions and observations arising from the performed analysis.