Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  damping hole
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
When a metro is constructed by the shield method in the strata containing boulder group, it is prone to some engineering problems such as serious cutter wear, deformation of the cutter holder head, damage of the cutter spindle, which seriously affects the construction efficiency and bring enormous problems to the shield construction. This paper proposes the vibration reduction measures for the boulder deep-hole blasting to meet the construction safety. To achieve this purpose, the field test was applied to investigate the vibration response of adjacent building under five blasting areas. Then, three-dimensional numerical model was employed to discuss the vibration characteristics of the boulder and adjacent buildings under vibration reduction measures. The results show that increasing the damping hole and the isolation hole and changing the charging layout of the blasting areas can blast the boulder under the condition of ensuring effective and safe construction. Damping hole and isolation hole have a positive role in the control and attenuation of blasting stress wave. All of them have good vibration reduction effect, and the vibration reduction efficiency is more than 90%. The double row damping holes with 12.7 cm diameter and 20 cm spacing have good vibration reduction effect and economic benefit. When double row damping holes are used, the maximum particle velocity of the shaft structure under the influence of blasting stress wave is 1.47 cm/s, which is within the reasonable safety range.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.