Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  core drill
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
In this manuscript, an attempt has been made to predict and improve the overall equipment effectiveness of core drill rigs. A combined Box– Jenkins and artificial neural network model was used to develop a three parameter model (drill pushing pressure, drill penetration rate & average pillar drill pit cycle time) for predicting effectiveness. the overall equipment efficiency of core drill rigs. The values of mean average percentage error, root mean square error, normalized root mean square error, men bias error, normalized mean biased error and coefficient of determination values were found to be 9.462%, 17.378%, 0.194, 0.96%, 0.0014 and 0.923. Empirical relationships were developed between the input and output parameters and its effectiveness were evaluated using analysis of variance. For attaining 74.9% effectiveness, the optimized values of pushing pressure, penetration rate and average pillar drill pit cycle time were predicted to be 101.7 bar, 0.94 m/min and 272 min, which was validated. Interactions, perturbations and sensitivity analysis were conducted.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.