The paper presents the problem of interaction between an LCC HVDC system and a VSC HVDC system. It was shown that the separate operation of an LCC HVDC system under low short circuit power conditions is possible and that at this level of short circuit power it is possible to transfer the same active power through the VSC HVDC system operating in parallel, under the condition that the inverter of this connection operates in AC voltage regulation mode. On the other hand, in certain circumstances it is this mode that may cause the LCC system operating conditions to worsen, which indicates the need for a careful analysis of such cases in order to properly adjust the settings of the relevant control systems. It has been shown that the settings of the voltage regulation system and the PLL system under normal short circuit power conditions can improve the process of the LCC HVDC system returning to operation post-disturbance, while in the conditions of reduced short circuit power they make this process more difficult.
PL
W artykule przedstawiono problem interakcji pomiędzy układem LCC HVDC a VSC HVDC. Pokazano, że samodzielna praca układu LCC HVDC w warunkach niskiej mocy zwarciowej jest możliwa oraz że przy tym poziomie mocy zwarciowej możliwe jest dodatkowe wyprowadzenie takiej samej mocy czynnej przez równolegle pracujący układ VSC HVDC, pod warunkiem że falownik tego łącza będzie pracował w trybie regulacji napięcia AC. Z drugiej strony w określonych okolicznościach to właśnie ten tryb może być przyczyną pogorszenia warunków pracy układu LCC, co wskazuje na potrzebę dokładnej analizy takich przypadków w celu właściwego doboru nastaw odpowiednich układów regulacji. Pokazano bowiem, że nastawy układu regulacji napięcia i układu PLL w warunkach normalnej mocy zwarciowej potrafią usprawnić proces powrotu do pracy układu LCC HVDC po zakłóceniach, natomiast w warunkach obniżonej mocy zwarciowej ten proces utrudniają.
EN
Power System stability is an essential study in the planning and operation of an efficient, economic, reliable and secure electric power system because it encompasses all the facet of power systems operations, from planning, to conceptual design stages of the project as well as during the systems operating life span. This paper presents different scenario of power system stability studies on a modified IEEE 30-bus system which is subjected to different faults conditions. A scenario whereby the longest high voltage alternating current (HVAC) line is replaced with a high voltage direct current (HVDC) line was implemented. The results obtained show that the HVDC line enhances system stability more compared to the contemporary HVAC line. Dynamic analysis using RMS simulation tool was used on DigSILENT PowerFactory.
EN
High Voltage Direct Current (HVDC) systems has been an alternative method of transmitting electric power from one location to another with some inherent advantages over AC transmission systems. The efficiency and rated power carrying capacity of direct current transmission lines highly depends on the converter used in transforming the current from one form to another (AC to DC and vice versa). A well-configured converter reduces harmonics, increases power transfer capabilities, and reliability in that it offers high tolerance to fault along the line. Different HVDC converter topologies have been proposed, built and utilised all over the world. The two dominant types are the line commutated converter LCC and the voltage source converter VSC. This review paper evaluates these two types of converters, their operational characteristics, power rating capability, control capability and losses. The balance of the paper addresses their applications, advantages, limitations and latest developments with these technologies.
EN
The UHVDC system plays an important role in smart grids. In this paper, a new topology structure of UHVDC hierarchical connection mode to different AC systems is analyzed with a view to improving system transmission abilities. Then a new mathematical model is proposed to calculate the MIIF under different UHVDC hierarchical connection modes. The effect of coupling impedance, equivalent impedance and different DC control mode adopted by two group inverters are illustrated to analyze the MIIF. The method to calculate the MISCR of the multi-infeed HVDC system is also applied to HISCR of UHVDC hierarchical connection mode with the MIIF value. In UHVDC hierarchical connection mode, total power to different hierarchical active current layer can be allocated reasonably to change parameter of the received power grid. Thus, the commutation failure can be analyzed according the MIIF change values of UHVDC hierarchical connection mode to the AC system. Therefore, it may increase the risk of commutation failure in the other converter when one converter is in a state of commutation failure. The correctness of the proposed method is verified by PSCAD simulation. The simulation results are illustrated to verify the operating characteristics of the system.
EN
An HVDC link enables power and energy exchange between unsynchronised power grids. Large possibilities of controlling active power flows through such systems enable commercial transfers, as well as emergency power balancing operations. During operation of an HVDC SwePol Link disturbances related to thyristor commutation triggered by the grid (commutation failures) are observed; these occur during power import (inverting operation) to  Poland. A  commutation failure may lead to an outage of the HVDC link and therefore restrict power exchange with Sweden. An outage may additionally cause some technical defects (e.g. damage of return cable insulation). This damage may lead to long outages of the link, and repairing it may be quite expensive. The paper presents results of the cause-effect analyses of the closed grid operation in the northern area of the National Power System, in the context of disturbances in operation of the HVDC SwePol Link. Events related to commutation failures have been analysed; the influence of operating conditions in the grid near an HVDC link on such occurrences has been evaluated. So far, during the operation of the link such a phenomenon has occurred more than 200 times, and some of the events led to the system shut-down. In a few cases some link components were damaged in the process.
PL
Połączenie HVDC umożliwia wymianę mocy i energii pomiędzy systemami elektroenergetycznymi, które pracują niesynchro- nicznie. Duże możliwości kontroli przepływów mocy czynnej w tego typu układzie pozwalają zarówno na wymianę handlową, jak i korektę bilansu mocy w sytuacjach awaryjnych. W pracy łącza HVDC SwePol Link rejestruje się zakłócenia związane z wyzwalaną sieciowo komutacją tyrystorów (w charakterze tzw. przewrotów komutacyjnych), powstające w trakcie importu mocy (praca falow- nikowa) do Polski. Przewrót komutacyjny może prowadzić do wyłączenia łącza HVDC i w efekcie ograniczeń w realizacji wymiany mocy ze Szwecją. Dodatkowym skutkiem wyłączenia łącza mogą być defekty techniczne (przykładowo: uszkodzenia izolacji kabla powrotnego). Uszkodzenia te są przyczyną długich przerw w pracy łącza, a ich usunięcie wymaga niejednokrotnie znacznych nakładów finansowych. W artykule przedstawiono wyniki przeprowadzonej analizy przyczynowo-skutkowej funkcjonowania sieci zamkniętej w północnym rejonie Krajowego Systemu Elektroenergetycznego (KSE) w aspekcie zakłóceń pracy łącza HVDC SwePol Link. Przeanalizowano zdarzenia związane z występowaniem przewrotów komutacyjnych i przeprowadzono ocenę wpływu warunków pracy otoczenia sieciowego łącza HVDC na występowanie tego zjawiska. W dotychczasowej pracy łącza zjawisko to wystąpiło ponad 200 razy, w tym część zakłóceń zakończyła się wyłączeniem układu, a w kilku przypadkach zdarzeniem towarzyszącym było uszkodzenie elementów składowych łącza.
PL
W pracy łącza HVDC SwePol Link rejestruje się zakłócenia związane z wyzwalaną sieciowo komutacją tyrystorów (przewroty komutacyjne) powstające w trakcie importu energii elektrycznej do Polski. Przewrót komutacyjny może prowadzić do wyłączenia łącza i w efekcie do ograniczeń w realizacji wymiany mocy między Polską i Szwecją. Dodatkowym skutkiem wyłączenia łącza mogą być defekty techniczne. W artykule przedstawiono wyniki przeprowadzonej analizy przyczynowo-skutkowej wpływu funkcjonowania sieci zamkniętej w północnym rejonie Krajowego Systemu Elektroenergetycznego na zakłócenia w pracy łącza HVDC SwePol Link.
EN
The HVDC SwePol Link allows the power and energy exchange between Poland and Sweden. Disturbances of HVDC SwePol Link operation occur during energy import to Poland. The connection between Poland and Sweden was establish in 2000 and consist of a bipolar HVDC cable line and two AC/DC converter stations, one in Slupsk (the Polish power system side) and the second one in Stärnö (the Swedish power system side). The reason of identified disturbances was events in polish power network, which can cause commutation failure. That commutation failure could lead to switching off the HVDC SwePol Link and additionally resulting in unexpected limitation of power exchange between Poland and Sweden. The paper will present results of cause-and-effect analysis of Polish power system in terms of interference with the HVDC SwePol Link. Events leading to the occurrence of commutation failure will be described as well as impact assessment of different AC power system operation states in network-area of Slupsk substation. Commutation failure phenomenon in some cases caused some damages. According to that facts an important element of the paper will be a quantitative description of the commutation failure that occur during the lifetime of the HVDC SwePol link.