Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  chodnik drenażowy
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The paper analyses possibilities to carry out methane drainage of a longwall in seam 510. A possibility to fight against the methane hazard was determined based on results of forecasting for methane emission to mine workings. A system of methane drainage was suggested for the adopted method of longwall face ventilation. The location of drainage roadway was determined for the selected methane drainage system. The paper includes a geomechanical analysis for a numerical model, which was aimed at determination of the optimum location of the drainage roadway in a seam overlying the longwall panel.
PL
W artykule przedstawiono analizę możliwości prowadzenia odmetanowania ściany w pokładzie 510. Na podstawie wyników prognozy wydzielania metanu do wyrobisk górniczych określono możliwości zwalcza-nia zagrożenia metanowego. Zaproponowano system odmetanowania z chodnikiem drenażowym ponad eksploatowanym pokładem dla przyjętego sposobu przewietrzania wyrobiska ścianowego. Dla wybranego systemu odmetanowania wyznaczono lokalizację chodnika drenażowego. W artykule zamieszczono analizę geomechaniczną dla modelu numerycznego, której celem było określenie optymalnej lokalizacji chodnika drenażowego pokładzie wyżej leżącym nad polem eksploatacyjnym.
PL
Artykuł przedstawia wybrane przykłady bieżącego odmetanowania pokładów węgla chodnikami drenażowymi, stosowane w zakładach górniczych. Omówiono sposoby prowadzenia odmetanowania pokładów chodnikami drenażowymi w aspekcie kształtowania się zagrożenia metanowego. Na przykładzie wybranych rejonów eksploatacyjnych zaprezentowano koncepcję zastosowania chodnika drenażowego, jako wspomagającego odmetanowanie oraz jako zasadniczego sposobu odmetanowania. Ponadto przedstawiono alternatywną koncepcję zastosowania chodnika przyścianowego ściany wyeksploatowanej w pokładzie nadległym, jako wyrobiska drenażowego dla wspomagającego odmetanowania.
EN
The article presents selected examples of methane drainage from longwall areas under high level of methane hazard by using drainage roadways. It presents the concepts of using a drainage roadway as a support or primary methane drainage method. The article also present an alternative concept of using the longwall roadway of a previously mined longwall in an incumbent seam as a drainage working supporting the methane drainage in the longwall located in the seam below. In Polish mining, drainage roadways are only used for ongoing drainage of mined longwalls. The attempts at preventive methane drainage in Poland were not successful due to the low in situ gas permeability of coal seams. From the presented applications of drainage roadways for longwall methane drainage, the highest drainage effectiveness, up to 85.0% (fig. 12) was achieved by drilling additional sets of drainage boreholes in the desorption zone of the roadway, towards the goaf of the mined longwall and adjacent undermined seams located above the drainage roadway. The use of the longwall gallery of a previously mined longwall in an incumbent seam as a drainage roadway for the longwall mined below eliminates the need to drive a new working to drain the rock mass (fig. 14). When using the roadway-based methane drainage, it is necessary to perform an additional fire hazard assessment based on the analysis of the composition of gases in the methane drainage pipeline. It is, therefore, required to develop a fire hazard assessment method based on such an analysis. Methane drainage via drainage roadways located adjacent to the mined seam allows to: − achieve high efficiency of methane drainage in longwall areas, allowing their ventilation in the “U” layout along the coal face, − maintain a favourable tendency in forming a “U” ventilation layout for the endogenous fire hazard while providing effective methane drainage of the rock mass in the longwall, − achieve monthly longwall advance of over 60 m in the conditions of high absolute methane emission without the need to apply methane drainage systems to longwall-adjacent workings (fig. 12).
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.