Ograniczanie wyników
Czasopisma help
Autorzy help
Lata help
Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 32

Liczba wyników na stronie
first rewind previous Strona / 2 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  cementation
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 2 next fast forward last
EN
Engineering activity may lead to uncontrolled changes in the geological environment. This paper presents an example of structural changes in fluvial sand of the Praski terrace (in Warsaw) caused by the activity of a temporary concrete batching plant. Our investigations made it possible to identify the material responsible for the structural anomalies observed in the bottom of the trench excavation. The compound responsible for the cementation phenomenon was identified as ettringite – hydrated calcium aluminosulphate: Ca6Al2[(OH)12(SO4)3]·26H2O. The source of ettringite were most probably significant volumes of contaminants coming from the temporary concrete batching plant (e.g., from the rinsing of concrete mixers and/or installations for concrete storage and transportation). While penetrating into the ground, ettringite caused extensive cementation of the soil mass, mainly in the saturation zone. As a result, the mineral (chemical) composition of the inter-grain space changed and the structure of the sand was strengthened. The estimated zone of volumetric changes in soil properties was about 6 thousand m3. However, analysis of the chemical composition of groundwater for its potential sulphate contamination, did not reveal any anomalous concentrations of sulphates.
EN
Spent Nickel–metal hydride batteries can be sources of valuable metals such as nickel, cobalt, manganese, rare earths and toxic chemicals. The recycling of these materials is necessary from both economic and environmental points of view. In this study the nickel is leached in acid solution followed by precipitation and thermal decomposition or by cementation. The affecting parameters such as acid type and concentration, time, temperature and solid/liquid ratio were investigated. The maximum of leached nickel could be obtained in 3M sulfuric acid at 65°C for 60 min with solid-to-liquid ratio of 30 g L-1. The liquid film is a more suitable model for demonstrating the kinetics of the nickel leaching. Thermal decomposition of the precipitated nickel dimethyl-glyoxime was employed in preparation of nickel oxide. Nickel was separated from aqueous solution by cementation on zinc. The cementation process follows pseudo first-order kinetics and diffusion controlling steps. The yield was 91% of the original nickel content.
EN
Simulation is used today in many contexts, such as simulating technology to tune or optimize performance, safety engineering, testing, training, education, and entertainment. In some industries, simulations are commonly used, but in heat treatment this is rather an exception. The paper compares the simulation of carburization and nitrocementation of 16MnCr5 steel with a practical application. The aim was to determine the applicability of chemical heat treatment simulation. We were looking for an answer to the question: to what extent can we rely on the technological design of heat treatment? The software designed the heat treatment technology. He drew the technological process of chemical-thermal treatment of 16MnCr5 steel. The thickness of the cementite layer was 1 mm and the nitrocementation 1.2 mm. Changes in mechanical properties were observed. Cementing, nitrocementing, hardness, microhardness, metallography, and spectral analysis were practically performed. This article describes the benefits of simulation, speed and accuracy of the process. The only difference was in determining the carbon potential. The simulation confirmed the practical use and its contribution in the technological process.
EN
Tin sludge produced during tin electroplating of steel sheet is an interesting secondary source of tin. Dried sludge usually contains more than 50% tin. Hydrometallurgical sludge treatment consists of several steps, including leaching in hydrochloric acid and electrolytic recovery of tin. The electrowinning process is negatively affected by the presence of impurities such as antimony and bismuth, which can cut overall current efficiency to 11% as well as reducing the quality of recovered tin. It is appropriate therefore to remove these impurities from the leachate before the electrowinning steps. This work studies the refining of leachate using cementation. The experiments were carried out at temperatures of 20, 40 and 60 °C at solid to liquid ratios of 1:60, 2:60, 3:60 and 4:60 using tin and iron dust as cementing metals. The leachates were mixed at a constant rate of 400 rpm during all cementation experiments. Effective removal of impurities was achieved in the case of iron powder cementation at s/l ratio 2:60 and temperature 20 °C. This cementation removed 98.49% bismuth and 99.14% antimony from the leachate solution. Electrolysis efficiency was increased from 11 to 71% after leachate refining. Antimony and bismuth were not detected in the final product obtained from refined electrolyte by means of electrolysis.
PL
Zaczyny uszczelniające przeznaczone do cementowania kolumn rur okładzinowych w głębokich otworach muszą odznaczać się ściśle określonymi parametrami technologicznymi, pozwalającymi na skuteczne zastosowanie ich w danych warunkach otworowych. Jednym z takich parametrów jest filtracja zaczynu uszczelniającego, która powinna odznaczać się jak najmniejszą wartością. Mechanizm działania domieszek do regulacji filtracji w zaczynach uszczelniających jest złożony i w większości przypadków oprócz ograniczenia filtracji dodatkowo powodują one pogorszenie właściwości reologicznych zaczynu. Przedstawiono wyniki badań laboratoryjnych wpływu nowo syntezowanego w Katedrze Wiertnictwa i Geoinżynierii Wydziału Wiertnictwa, Nafty i Gazu Akademii Górniczo-Hutniczej w Krakowie (KWIG WWNiG AGH) polimeru obniżającego filtrację zaczynu, który nie wpływa w sposób istotny na wzrost parametrów reologicznych w porównaniu z domieszkami stosowanymi dotychczas.
EN
Three sealing slurries were prepd. without any additive for regulating filtration, with a com. admixture and with a new acrylic PAAA terpolimer (with units of [(2-acryloxy)ethyl] trimethylammonium chloride and (3-acryloamidopropyl) trimethylammonium choride. The filtration of PAAA-contg. sealing slurry was more limited than in the case of the com. admixture. The rheol. properties of the studied sealing slurries were described by using 5 rheol. models.
EN
Copper flue dusts, or copper Cottrell dusts, from three types of copper smelting furnaces were leached with different ammonia-based reagents (ammonium chloride, ammonium carbonate and aqueous ammonia solutions) to dissolve the oxidised copper species via the formation of copper-ammonia complexes, so that most of the copper-accompanying metals, especially iron, remained in the solid residue. Such copper-bearing dusts are not only valuable secondary source of copper but also are considered as hazardous materials and cannot be dumped as such. Therefore, two procedures for copper dust treatment are proposed, one of them includes ammonium-based leaching, liquid-liquid extraction with LIX 860 (aldoxime), LIX 84 (ketoxime) or LIX 54 (β-diketone) and electrowinning to grade A copper cathode. The other one covers also ammonium-based leaching followed by cementation with zinc to copper cement as a final product.
EN
The kinetics of gas-phase cementation of goods – self-tapping metal screws for attachment of metal structures DIN 7982 / ISO 7050 with pointed ends from steels of SAE 1013-1018 to ASTM 510 grades was studied. The investigation was carried out by dynamic method with open volume, renewable gas phase, continuous delivery of natural gas to the flow system and its extraction from gaseous products of interaction. Chemical and phase composition of the surface coating was studied by means of low-vacuum raster electron microscope JSM 6490LV of JEOL company (Japan). A cementation of screws with washer from EPDM was examined. Experimental dependences of carbon concentration on the distance from the goods’ surface for various exposures in the cementation process were received. It was found that hardness of all elements of the hardened goods is notably higher than of the hardened goods. Thread, head and drill, i.e. off set elements of the goods are subjected to the maximum hardening. It was also substantiated that there is substantial decarbonization of the surface coating at a depth of 0.2–0.4 mm depending on the exposure time in the process of traditional hardening heat of the self-tapping screws. This explains lower values of the hardness of the thread, head and drill, the protruding elements of the goods. In comparison with the hardening, the cementation allows raise the hardness of the surface to 64−73 HRC (hardness in Rockwell scale C). Ways to raise corrosion resistance using the cementation were aimed. Among goods with protective coating (galvanized, oxidized) at the initial stage, the case-hardened goods have the lowest weight loss and during the whole time of the experiment the weight loss is substantially lower than the standard values.
PL
Zbadano kinetykę cementacji z fazy gazowej wkrętów samogwintujących do mocowania struktur metalowych DIN 7982/ ISO 7050 z ostrymi końcami ze stali gatunków SAE 1013-1018 do ASTM 510. Niniejsze badanie zostało przeprowadzone za pomocą metody dynamicznej z otwartą objętościowo, odnawialną fazą gazową, ciągłym podawaniem naturalnego gazu do systemu przepływowego oraz jego ekstrakcją z gazowych produktów interakcji. Skład chemiczny i fazowy powłoki powierzchniowej był badany przy pomocy niskopróżniowego, rastrowego mikroskopu elektronowego JSM 6490LV firmy JEOL (Japonia). Zbadano także możliwość wykorzystania cementowanych śrub z nakrętkami, mającymi podkładki uszczelniające oparte na EPDM. Otrzymano doświadczalnie zależność stężenia węgla od odległości od powierzchni wyrobów dla różnych ekspozycji w procesie cementowania. Stwierdzono, że twardość wszystkich elementów wyrobów hartowanych jest istotnie wyższa niż wyrobów hartowanych. Gwint, główka i świderek gwintujący, tj. robocze elementy wyrobów poddawano maksymalnemu hartowaniu. Potwierdzono, że w procesie tradycyjnego hartowania cieplnego wkrętów samogwintujących zachodzi znaczna dekarbonizacja powłoki powierzchniowej na głębokość 0,2–0,4 mm, zależnie od czasu ekspozycji. To wyjaśnia niższe wartości twardości gwintu, główki i świderka gwintującego, zewnętrznych elementów tych wyrobów. W porównaniu z hartowaniem, cementowanie pozwala na podwyższenie twardości powierzchni do 64–73 HRC. Zwrócono uwagę na sposoby podniesienia odporności na korozję przy użyciu cementowania. Spośród wyrobów mających powłokę ochronną (galwanizowanych, oksydowanych) na wstępnym etapie, wyroby hartowane mają najmniejszą utratę masy, a podczas całego eksperymentu utrata masy jest istotnie niższa od standardowych wartości.
PL
W artykule przedstawiono zakres i przebieg remontu zapory suchego zbiornika przeciwpowodziowego w Jarnołtówku. Zapora – zbudowana w latach 1906-1908 – składa się z części kamiennej – przelewowej i zapory ziemnej. Ze względu na stan techniczny zapory kamiennej wykonano ciśnieniową cementację otworową uszczelniającą korpus zapory kamiennej oraz palisadę (metodą jet-grouting) uszczelniającą i wzmacniającą połączenie zapory ziemnej z przyczółkiem zapory kamiennej. Iniekcję otworową wykonano metodą „od dołu”, strefami o wysokości do 5 m, w otworach o orientacji pionowej, w pierwszej i drugiej kolejności iniektowania. Otwory wiertnicze miały średnicę 100 mm i długość 8,00-24,90 m. Do robót cementacyjnych wykorzystano cement portlandzki CEM I 42,5. Palisadę wykonano ostatecznie z 16 kolumn o średnicy 2,0 m i wysokości od 15,0 do 18,3 m, zależnej od lokalizacji i głębokości zalegania podłoża skalnego. Do wykonania palisady użyto cementu hutniczego CEM III/A 32,5 N-LH/HSR/NA. Dodatkowo wykonano zakotwienie prawego przyczółka zapory kamiennej. Po wykonaniu remontu dokonano oceny jego skuteczności za pomocą badań geofizycznych obrazujących zmiany prędkości fal sejsmicznych wywołanych cementacją. Otrzymane wyniki porównano z wynikami badań wykonanych przed remontem zapory w 2009 r. Ze względu na charakter obiektu (okresowo piętrzącego wodę) ocenę wykonano na podstawie wyników kontroli międzyoperacyjnych oraz badań geofizycznych (geosejsmicznych). Podkreślono znaczenie kontroli i nadzorów specjalistycznych w remontach tego typu obiektów.
EN
The article shows the range and technology of repair of dam in temporary impounding reservoir Jarnołtówek. The dam – built in years 1906-1908 – is composed of stone dam – spillway and earth dam. Cementing grouting technology was chosen to seal leaking dam’s body. There was also a palisade executed with means of jet-grouting method, which sealed and strengthened the connection between earth dam and abutment of stone dam. Injection was conducted “from the bottom”, in zones 5,0 m high, in vertical holes of first and second order. Dimensions of the holes were: diameter equal 100 mm and length from 8,0 to 24,9 m. Portland cement of strength class equal 42,5 was used for injection. Palisade finally was made of 16 columns of diameter equal 2,0 m and length – from 15,0 to 18,3 m. To execute the palisade the blast-furnace cement type CEM III/A 32,5 N-LH/HSR/NA was used. Also anchorage of right abutment of stone dam was executed. The quality of repair was controlled with means of geophysics (geoseismic) testing and within working time of the object (temporary impounding water). Obtained results were compared with the results of tests conducted in 2009 (before the dam repair). Significance of control and specialist’s supervision in repairs of this type of objects were emphasized in the article.
EN
Cementation of tin on copper in acid chloride-thiourea solutions leads to the formation of porous layers with a thickness dependent on the immersion time. The process occurs via Sn(II)-Cu(I) mechanism. Chemical stripping of tin was carried out in alkaline and acid solutions in the presence of oxidizing agents. It resulted in the dissolution of metallic tin, but refractory Cu3Sn phase remained on the copper surface. Electrochemical tin stripping allows complete tin removal from the copper substrate, but porosity and complex phase composition of the tin coating do not allow monitoring the process in unambiguous way.
EN
Complex geological structure as well as long-term intensive operation of oil and gas deposits in Borislav-Pokutska zone of Carpathians leads to changes in thermo-dynamical parameters of pools, rock deformation and, as a result, to crippling of the boreholes and creasing and damaging of boring casing. The abovementioned actions not only complicate extraction of oil and gas but increase the technological charge on the environment. In this study 3 types of materials were investigated: PCT-I-100 – traditional tamping cement, CREA and CREA-LF tamping mixes produced by dry mixing technology that were designed by authors. Dry mixes are characterized by higher level of SiO2 because of addition of milled sand and provide better cementation quality. Developed materials are characterized by lower dehydration and water reduction, thanks to clearly chosen composition and modern chemical admixtures usage. The method of borehole eliminative cementation is also presented by authors.
PL
Przeprowadzono próby otrzymywania powłok kompozytowych Ni-P/SiC na stopach magnezu AZ91D. Jako warstwy pośrednie naniesiono: powłokę cynkową metodą cementacyjną oraz powłokę Ni-P w procesie autokatalitycznym. Powłoki scharakteryzowano pod względem składu i morfologii. Określono mikrotwardość poszczególnych warstw oraz przeprowadzono testy szczelności układu wielowarstwowego.
EN
Ni-P/SiC composite coatings were deposited on AZ91D magnesium alloys. Two interlayers were used: zinc was deposited by cementation, while Ni-P layer was obtained by electroless deposition. Zinc and nickel plating solutions should contain fluoride ions in order to protect the alloy against corrosion due to the formation of a sparingly soluble magnesium fluoride. Composition and morphology of the individual layers were described. The presence of SiC significantly increased the microhardness of the alloy surface, but porosity of the coatings and large potentials differences between the individual layers and the alloy substrate lead to the galvanic corrosion of magnesium.
EN
This paper analyses Holocene beachrocks from the Arabian Gulf and the Gulf of Aqaba to explain the mechanisms that influence the cementation process in these areas. Holocene beachrocks in the Gulf of Aqaba are composed of predominantly terrigenous material derived from erosion of adjacent uplifted Precambrian basement, while the beachrocks in the Arabian Gulf are composed mainly of marine bioclasts and wind-blown siliciclastic sands. The cements of beachrocks in both areas show three textural varieties: (1) isopachous phreatic acicular aragonite; (2) a micritic envelope of high-Mg calcite (HMC); (3) meniscus and gravitational vadose HMC. Radiocarbon dating of beachrock samples from the Arabian Gulf yielded ages from ca. 2300 to 660 yr cal BP whereas samples from the Gulf of Aqaba range in age between 5500 and 2800 yr cal BP. Oxygen isotope values range from 2.6 to 4.4‰ respectively for the Arabian Gulf whereas the Gulf of Aqaba values range from 1.2 to 1.5‰. Carbon isotope values range from 3.2 to 5.9‰ for the Arabian Gulf whereas those from the Gulf of Aqaba range from 3.8 to 4.6‰. The values of δ18OVPDB and δ13CVPDB in the beachrocks of both areas suggest a marine origin. The beachrocks of the Arabian Gulf were precipitated under high evaporation conditions, while beachrocks from the Gulf of Aqaba were precipitated in normal shallow-marine conditions. The mineralogy and textural habits suggest that cementation of these beachrocks started within the shallow-marine phreatic zone.
PL
Przedstawiono sposób syntezy mikrocząstek cynowych na podłożu niemetalicznym metodą bezprądową. Zaproponowano następujący sposób otrzymywania: (I) synteza zarodków katalizatora Pd, (II) bezprądowe osadzanie miedzi z roztworu alkalicznego z zastosowaniem formaldehydu jako reduktora, (III) wytwarzanie ziaren cynowych na drodze cementacji cyny(II) miedzią w roztworze kwaśnym, (IV) osadzanie cyny z roztworu silnie alkalicznego na drodze dysproporcjonacji Sn(II). Średnia wielkość poszczególnych ziaren metalicznych wynosiła: 0,7 nm Pt, 2 [mi]m Cu, 10 [mi]m Sn (cementacyjnie) i 4 [mi]m Sn (autokatalitycznie). Przeprowadzono także dodatkowe pomiary elektrochemiczne z zastosowaniem różnych typów elektrod.
EN
The paper presents electroless deposition of tin microparticles on non-metallic substrate. The following method was proposed: (I) synthesis of Pd catalytic nuclei for copper electroless deposition, (II) electroless deposition of copper from an alkaline solution using formaldehyde as a reducing agent, (III) cementation tin by copper nuclei in an acid solution, (IV) tin electroless deposition in a strong alkaline solution. Average grain sizes were: 0,7 nm Pt, 2 [mi]m Cu, 10 [mi]m Sn (cemented) i 4 [mi]m Sn (autocatalytic). Electrochemical studies were also performed using various electrode substrate.
14
Content available remote Wpływ warunków hydratacji na strukturę przestrzenną kamieni cementowych
PL
W artykule przedstawiono wpływ temperatury oraz ciśnienia hydratacji zaczynu uszczelniającego na kształtowanie się struktury porowej powstałego kamienia cementowego. Badane próbki kamieni cementowych sporządzono z zaczynów uszczelniających wytypowanych do stosowania na złożach gazowych. W celu poprawy szczelności matrycy cementowej, a tym samym przeciwdziałania migracji gazu, zastosowano dodatek mikrocementu oraz dodatki polimerowe.
EN
The paper presents the effect of temperature and hydration pressure of cement slurry on the formation of the pore structure of the cement stone formed. Tested cement stone samples were made form cement slurries selected for use in gas wells. In order to improve the integrity of cement matrix and thus prevent gas migration microcement and polymer additives were used.
15
PL
Jest tok 1987. Polska wkracza właśnie w II etap rządowej reformy gospodarczej. Mało kto w tym trudnym czasie myśli o prywatnym biznesie. A jednak 29 września zostaje powołana do życia spółka o długiej nazwie i szerokich perspektywach. Na początku miała zajmować się czyszczeniem kanalizacji dla wodociągów warszawskich. Szybko jednak i dosyć odważnie jak na owe czasy, poszerzyła swoją ofertę o kompleksowe remonty całych magistral wodociągowych. Ten ryzykowny ruch okazał się kluczem do sukcesu...
PL
Artykuł omawia zagadnienia związane z uszczelnianiem głębokich kolumn rur eksploatacyjnych na obszarze Niżu Polskiego. Przedstawiono w nim wyniki badań receptury zaczynów cementowych stosowanych do cementowania otworów w naszym kraju w ostatnich latach. Badania laboratoryjne prowadzono w temperaturach od 90[stopni]C do 120[stopni]C i ciśnieniach od 60 MPa do 70 MPa. Receptury zaczynów opracowane zostały przy współpracy Instytutu Nafty i Gazu Oddział Krosno z Serwisem Cementacyjnym w Wołominie. Zaczyny cementowe sporządzane były na bazie 10-procentowej solanki NaCl. Głównymi składnikami zaczynów były: lateks w ilości 20-25% (zapobiegający migracji gazu i obniżający filtrację), mączka krzemionkowa (podnosząca odporność termiczną kamienia cementowego w wysokiej temperaturze), hematyt (materiał obciążający, dodawany w ilości od 30% do 110% w stosunku do masy cementu) oraz mikrocement (doszczelniający matrycę cementową). Jako spoiwo wiążące używano cementu wiertniczego G HSR, spełniającego wymagania normy PN-EN ISO 10426-1 Przemysł naftowy i gazowniczy - Cementy i materiały do cementowania otworów. Opracowane zaczyny posiadały gęstości w granicach od 2050 kg/m[^3] do 2350 kg/m[^3], lepkości plastyczne około sto kilkadziesiąt mPa [kropka] s i czasy gęstnienia wynoszące od około trzech i pół do około sześciu godzin. Filtracje zaczynów wynosiły około 30-40 cm[^3]/30 min, a odstoje wody były zerowe. Stwardniałe zaczyny cementowe posiadały wysoką wytrzymałość na ściskanie (przekraczającą w większości przypadków 30 MPa). Poprzez prowadzenie w INiG szczegółowych badań świeżych i stwardniałych zaczynów cementowych oraz dzięki realizowaniu szeregu prac związanych z coraz doskonalszą modyfikacją receptur zaczynów, jakość cementowania głębokich kolumn rur eksploatacyjnych, udostępniających złoża węglowodorów na obszarze Niżu Polskiego, ulega ciągłej poprawie.
EN
The article discusses issues related to the sealing off of deep production casings in the Polish Lowlands. It presents the results of recipes of cement slurries used in our country in recent years. Laboratory tests were performed at temperatures from 90 to 120[degrees]C and pressure from 60 to 70 MPa. Slurry recipes had been developed in the Oil and Gas Institute in collaboration with the Cementing Service in Wołomin. Cement slurries were prepared with 10% NaCl brine as a base. The main components of the slurries were: latex in an amount of 20-25% (to prevent gas migration and reduce filtration), silica powder (raising the thermal resistance of cement stone at high temperature), hematite (weighting material added in amounts ranging from 30 to 110%) and microcement (sealing cement matrix). The G HRS cement was used as a binder. It met the requirements of PN-EN ISO 10426-1 Petroleum and natural gas industries - Cements and materials for well cementing. Developed slurries had density ranging from 2050 to 2350 kg/m[^3], plastic viscosity of about a hundred and dozens of MPa [dot] s, and a thickening time of between three and a half to six hours. The slurries filtration were about 30-40 cm[^3]/30 mins. and free water was zero. Hardened cement slurries (paste) had a high compressive strength (in most cases exceeding 30 MPa) and high adhesion to steel pipes. By carrying out detailed studies of fresh and hardened cement slurries and by implementing a numbers of tests related to the modification of better and better slurries recipes, the quality of cementing deep production casings is being improved.
PL
System zaopatrzenia ludności w wodę, jak również odprowadzenia ścieków dla miasta Bydgoszczy, z uwagi na swój wiek, jak i wieloletnie zaniedbania w minionych latach, wymagał intensywnych prac modernizacyjnych. MWiK Bydgoszcz podpisały kontrakty na roboty i usługi z Programu Inwestycyjnego „Bydgoski System Wodny i Kanalizacyjny II”, w dużej mierze współfinansowanego ze środków Unii Europejskiej w ramach Funduszu Spójności. Realizację kontraktów Bydgoskiego Systemu Wodnego i Kanalizacyjnego II rozpoczęto 10.04.2002 r. Projekt ten obejmował renowację 65 596 metrów magistralnych przewodów wodociągowych i był zarazem jednym z największych takich projektów realizowanych na terenie Europy. Modernizacja miejskiej sieci wodociągowej obejmowała oczyszczenie i uszczelnienie magistral wodociągowych, co miało na celu zwiększenie niezawodności ich działania, ponadto wyeliminowanie zjawiska wtórnego zanieczyszczenia wody, uzyskanie lepszej jakości wody pitnej oraz ograniczenie kosztów eksploatacyjnych. Modernizacja prowadzona była za pomocą metod bezwykopowych, wśród których wyróżnić należy: Proces Phoenix, cementację, Compact Pipe, Relining, Sliplining. Przeprowadzone czyszczenia i uszczelniania magistral wodociągowych o średnicach od 400 do 1000 mm zwiększyły ich niezawodność i wyeliminowały zjawisko wtórnego zanieczyszczenia wody, co pozwoliło na uzyskanie lepszej jakości wody pitnej przy niższych kosztach eksploatacyjnych.
EN
System of supplying the population with water as well as sewage disposal for the city of Bydgoszcz, due to its age, as well as long-term negligence in the past years, required intensive modernization works. MWiK Bydgoszcz signed contracts for works and services from the investment programme “Bydgoszcz Water Supply and Sewerage System”, largely cofinanced from European Union funds as part of the Cohesion Fund. Implementation of the contracts of the Bydgoszcz water system and Sewer II began on 10 April 2002. The project included the renovation of 62.517 metres of main waterworks conduits and was at the same time one of the largest projects of such type carried out in Europe. The modernization of the municipal water supply system included cleaning and sealing water mains what was aimed at increasing the reliability of their action and additionally eliminating the phenomenon of secondary water pollution, getting better quality of drinking water and reducing operating costs. The modernization was conducted using trenchless methods, among which there are to distinguish: Phoenix Process, cementation, Compact Pipe, Relining, Sliplining. The conducted cleaning and sealing water mains from 400 to 1000 mm in diameter increased their reliability and eliminated the phenomenon of secondary water pollution what allowed to obtain better quality of drinking water at lower operating costs.
PL
W artykule przedstawiono rozwiązania techniczne związane z uszczelnieniem zlikwidowanego szybu Górsko w Kopalni Soli "Wieliczka" Z uwagi na stwierdzone na poszczególnych poziomach kopalni wycieki w otoczeniu szybu zachodzi konieczność wykonania uszczelnienia górnego odcinka szybu od powierzchni terenu do granicy warstw czwartorzędowych z warstwami trzeciorzędowymi. Zadaniem cementacji doszczelniającej w szybie Górsko jest: zlikwidowanie dopływu wód powierzchniowych i ługowania przez nie górotworu solnego w otoczeniu szybu, uzyskanie płaszcza betonowego wokół rury szybu Górsko oraz zespolenie masywu skalnego do stanu zapewniającego jego stateczność.
EN
This paper presents technical solutions related to the sealing of the liquidated Gorsko Shaft in the Wieliczka Salt Mine. Due to the identified spills in the surroundings of the shaft at different levels of the mine, sealing is necessary in the upper part of the shaft from the surface to the boundary between the tertiary and quaternary layers. The goals of sealing cementation of the Górsko Shaft is: i) to eliminate surface water inflow leaching salt deposits into surroundings of the shaft, ii) obtain a concrete coat around the Gorsko Shaft tube, and iii) consolidate rock massif to ensure stability of the salt rock formation.
PL
W artykule przedstawiono wpływ geometrii oraz położenia zbrojenia w czasie betonowania na przyczepność w betonach wysokowartościowych. Zakres pracy obejmował zaprojektowanie składu mieszanki betonowej, która zapewniała uzyskanie betonu klasy C50/60. Wykonano także specjalne próbki różniące się między sobą średnicą rodzajem powierzchni i położeniem zbrojenia w czasie betonowania. Analizę postawionego problemu oparto na wynikach badań własności wytrzymałościowych zaprojektowanego betonu oraz na badaniach granicznych wartości naprężeń przyczepności, wykonanych klasycznym testem pull-out.
EN
In this paper, the influence of both the geometry and the position of a reinforcing bar during the process of concreting on the bond in high strength concrete is discussed. The scope of the paper was to design concrete mixture which gave C50/60 class concrete. Special specimens with different diameter, type of surface and positions of reinforcement were made. The analysis of the problem is based on the results of strength property tests of the designed concrete as well as those of the classic pull-out bond strength test.
EN
The results of testing the effect of concentration of water mixture of slag and ash on the propagation rate of sediment have been presented in this paper. Experiments have been conducted, which consisted in pouring simples with different mass concentrations onto a flat surface, and the time of propagation of the samples in the trough has been tested. The effect of concentration of the mixture on the process of cementation of the mixture on walls of pipelines has been also analysed.
first rewind previous Strona / 2 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.